Evolution Mining Limited · ASX:EVN

Evolution Mining — Technical Presentation (August 2016)

36 slides from Evolution Mining's technical presentation, Aug 1, 2016

  1. Slide 1: Mungari site visit

    For personal use only Mungari site visit 1 August 2016 Simon Jessop General Manager – Kalgoorlie Operations

  2. Slide 2: Forward looking statements

    Forward looking statements  These materials prepared by Evolution Mining Limited (or “the Company”) include forward looking statements. Often, but not always, forward For personal use only looking statements can generally be identified by the use of forward looking words such as “may”, “will”, “exp

  3. Slide 3: Agenda

    Agenda For personal use only  Welcome  Evolution and Mungari history  Site summary  Zero harm  Mungari a strategic gold province  Overview of Mungari gold operations  Mine geology  Underground  Open-pit  Processing  Business improvement  Discovery  Summary

  4. Slide 4: Evolution

    Evolution For personal use only 1. FY17F production reflects midpoint of FY17 guidance released to ASX on 28 June 2016 Location bubble size denotes FY16 actual production Mineral Resources are reported inclusive of Ore Reserves Full details of Evolution’s Mineral Resources and Ore Reserves are provi

  5. Slide 5: Mungari history

    Mungari history Mungari plant For personal use only Frog’s Leg First gold pour Frog’s Leg Ore discovery from Frog’s Leg Reserve grows to completed underground mine 786koz White Foil Processing via toll open-pit treatment production restarts FY17 150-160koz forecast 1996 1999 2002-2004 2008 2009 2010

  6. Slide 6: Site summary

    Site summary  Residential workforce For personal use only 600km east of Perth, Western Australia, Location  Workforce: ~272 employees and ~75 contractors Australia or 20km West of Kalgoorlie White Foil: conventional open-pit  Mine rosters: Mining method Frog’s Leg: underground Minerals Gold  Und

  7. Slide 7: Site layout

    Site layout For personal use only Kalgoorlie 20km 7

  8. Slide 8: Zero harm

    Zero harm  Safety TRIFR improved 32.0 – 7.9 For personal use only Total Recordable Injury Frequency Rate (TRIFR)  Take 5 and Safety Interactions 40 introduced 35  Vehicle Incident prevention 30 programs 25 20  Health & Wellbeing program 15  OHS & Risk assurance programs 10 5  Safety perception

  9. Slide 9: Mungari – a strategic gold province

    Mungari – a strategic gold province Growth For personal use only  Significant potential to expand production and extend mine life  ~880 km2 land position in a world-class terrane located between the Zuleika and Kunanalling shear zones with historic production of >10Moz gold  Potential for the dis

  10. Slide 10: Mungari Regional Mineral Resources

    Mungari Regional Mineral Resources For personal use only Mungari video Evolution’s first gold bar at Mungari – August 2015 10

  11. Slide 11: Mungari performance and outlook

    Mungari performance and outlook FY16 performance For personal use only  Gold production of 137,193 ounces (from ~10 months of ownership)  AISC1 of A$1,024 per ounce  Net mine cash flow of A$84 million FY17 guidance  Gold production of 150,000 – 160,000 ounces  AISC of A$970 – A$1,030 per ounce

  12. Slide 12: Mine geology

    Mine geology Frog’s Leg is a classic quartz vein hosted deposit located on For personal use only  the lithological contact between the Victorious Basalt and the Black Flag Volcanics  Mineralised widths range from 0.2m up to 20m (in the central flexure zone)  Mineral Resource is open down-plunge a

  13. Slide 13: Frog's Leg extensions

    Frog’s Leg extensions Dedicated drill platforms For personal use only  exist for both the Rocket and Mist lodes  Extensions and/or additional drill platforms are being evaluated to extend coverage further down plunge in FY17  ~17km of in-mine underground resource definition drilling is scheduled

  14. Slide 14: White Foil extensions

    White Foil extensions White Foil Open-Pit For personal use only  High-grade shoot defined under Stage 2A and outside the A$1,800/oz pit shell  Will form part of the Underground Xx L scoping study review YY L  Geotechnical work assessing the potential for wall steepening is ZZ L underway AA L Whit

  15. Slide 15: Resource definition - FY17

    Resource definition - FY17  Extensive regional portfolio of advanced targets and For personal use only reported Mineral Resources  Acquired Phoenix Gold Mineral Resources to be reviewed and optimised using current Evolution practices  Priority Mineral Resources and prospects to be evaluated for i

  16. Slide 16: FY16 underground performance

    FY16 underground performance For personal use only 25 August 2015 to 30 June 2016 Units Actual UG lateral development - capital kt 1,157 UG lateral development - operating kt 1,629 Total UG lateral development kt 2,785 UG ore mined kt 563 UG grade mined g/t 5.89  Frog’s Leg underground production c

  17. Slide 17: FY16 open-pit performance

    FY16 open-pit performance For personal use only 25 August 2015 to 30 June 2016 Units Actual OP capital waste kt 825 OP operating waste kt 6,644 OP ore mined kt 1,121 OP grade mined g/t 1.47 Life of mine strip ratio remaining Waste:ore 5.9:1  The White Foil open-pit is located 2km to the west of the

  18. Slide 18: White Foil material movement

    White Foil material movement For personal use only 18

  19. Slide 19: FY16 plant performance

    FY16 plant performance For personal use only  Mungari CIL processing plant 25 August 2015 to 30 June 2016 Units Actual completed May 2014 at a cost of Total tonnes processed kt 1,441 A$110M Grade processed g/t 3.16  Ore from Frog’s Leg and White Foil Gold recovery % 93.7 processed at the purpose b

  20. Slide 20: Business improvement

    Business improvement  Workforce restructure – site leadership team For personal use only management roles brought back to site  Underground drill platforms aggressively developed for Mineral Resource and Ore Reserve growth  Seismicity management – increased ground support to reduce rehabilitation

  21. Slide 21: Discovery opportunities

    For personal use only Discovery opportunities

  22. Slide 22: Mungari Regional Mineral Resources

    Mungari Regional Mineral Resources  Mungari Regional Mineral Resources 2.7Moz gold1 – For personal use only open-pit Mineral Resources to be constrained within an A$1,800/oz shell2  Tenement package increased to ~880km2 (from Zuleika North ~350km2) post Phoenix Gold acquisition (49koz) Ora Banda (

  23. Slide 23: Exploration strategy

    Exploration strategy For personal use only Seismic  Data Integration  Historic drilling, geology, geochemistry  High-resolution geophysics (magnetics, gravity, seismic)  Alteration and regolith mapping  4D studies  Integrate all data in three dimensions and factor in timing relationships  Imp

  24. Slide 24: Mungari – unlocking the Zuleika

    Mungari – unlocking the Zuleika For personal use only NE  Using advanced exploration targeting tools eg close spaced ground gravity and high- resolution seismic surveys  Framework RC drilling over the most perspective area: fast, efficient testing of large areas  Numerous targets identified in th

  25. Slide 25: Long-term outlook

    Long-term outlook  Mungari Ore Reserve 665koz1 For personal use only  Current mine life extends to FY22 which includes:  Frog’s Leg (underground) Ore Reserve  White Foil (open-pit) Ore Reserve  Potential near term extensions:  Frog’s Leg, White Foil, Cutters Ridge (open-pit), Red Dam (open-pit

  26. Slide 26: Summary - unlocking the potential

    Summary - unlocking the potential  Aspiring to develop a 10-year mine life based For personal use only on tenement package, regional resources and key strategic infrastructure  Mungari process plant – a strategic asset in the Kundana area  Focus on developing a pipeline by unlocking the large reg

  27. Slide 27: Appendices

    For personal use only Appendices

  28. Slide 28: Site leadership team

    Site leadership team For personal use only GENERAL MANAGER Simon Jessop PA to GM/ ADMIN SUPERVISOR Marcia Bryce REGIONAL OPERATIONS COMMERCIAL MANAGER – GEOLOGY DEVLEOPMENT DEVELOPMENT HSEC MANAGER EXPLORATION MANAGER MANAGER PEOPLE & CULTURE MANAGER PROJECT MANAGER Scott Young MANAGER Arno Dippenaa

  29. Slide 29: Process plant circuit

    Process plant circuit For personal use only 29

  30. Slide 30: Process equipment

    Process equipment  Power  Gravity Circuit For personal use only  Western Power – grid supply  Knelson concentrator – 30”  40-60% of gold recovered via gravity  Crushing  Leaching  Three stage crushing  Primary: Metso 40” Single Toggle Jaw  CIL circuit Crusher  2 x 1,140m3 leaching tank 

  31. Slide 31: Mining equipment

    Mining equipment Underground mining equipment Open-pit mining equipment For personal use only  Development drills  Loading  2 x development jumbos – Sandvik DD421  1 x 250t Hitachi EX2600  1 x 110t Komatsu PC1250 (back-up)  Production drills  Hauling  2 x longhole drills – Sandvik DL421  5

  32. Slide 32: Mungari Mineral Resources

    Mungari Mineral Resources For personal use only Mungari Mineral Resources - December 20151 Measured Indicated Inferred Total Resource Tonnes Tonnes Tonnes Tonnes Cont. Cont. Cont. Cont. Mineral Resource Grade Au Grade Au Grade Au Grade Au Metal Au Metal Au Metal Au Metal Au (Mt) (g/t) (Mt) (g/t) (Mt

  33. Slide 33: Mungari Regional Mineral Resources

    Mungari Regional Mineral Resources Mungari Regional Resources – December 20151 For personal use only Measured Indicated Inferred Total Resource Gold Tonnes Gold Grade Gold Metal Tonnes Gold Metal Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Project Prospect Cut-Off Grade (Mt) (g/t) (koz

  34. Slide 34: Evolution Mineral Resources December 2015

    Evolution Mineral Resources December 2015 Gold Measured Indicated Inferred Total Resource For personal use only Competent Person Gold Grade Gold Metal Gold Grade Gold Metal Gold Grade Gold Metal Gold Grade Gold Metal Project Type Cut-Off Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) (g/t) (koz) (g

  35. Slide 35: Evolution Ore Reserves December 2015

    Evolution Ore Reserves December 2015 Gold Proved Probable Total Reserve For personal use only Competent Cut- Tonnes Gold Grade Gold Metal Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Person Project Type Tonnes (Mt) Off (Mt) (g/t) (koz) (g/t) (koz) (Mt) (g/t) (koz) Cowal1 Open pit 0.40 39.93 0.

  36. Slide 36: ASX code: EVN

    For personal use only ASX code: EVN www.evolutionmining.com.au

Evolution Mining — Technical Presentation (August 2016) on 6ix