Marmota Limited · ASX:MEU

Marmota — Marmota Energy — Investor Presentation (February 2015)

16 slides from Marmota's investor presentation, Feb 4, 2015

  1. Slide 1: Investor Presentation February 2015

    For personal use only Investor Presentation February 2015 David Williams – Managing Director

  2. Slide 2: Important Information

    Important Information For personal use only Disclaimer This presentation has been prepared by Marmota Energy Limited (“MEU”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third par

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Marmota Energy (ASX: MEU) is a diversified mineral exploration and development company with key For personal use only projects across the uranium, Cu-Au and Cu-Ni spaces. Capital Structure Trading History Shares on Issue 284.8M 0.020 2,500,000 Options (ASX:MEUO; 2cps options expir

  4. Slide 4: Portfolio Overview

    Portfolio Overview Focused Portfolio of High Priority Exploration Targets: For personal use only  Junction Dam Uranium Project  Strategically located with a clear path to market  JORC Inferred Resource at Saffron deposit  Progressing Saffron deposit to a Retention Lease  Uranium sector re-ratin

  5. Slide 5: Uranium Market Snapshot

    Uranium Market Snapshot Uranium market fundamentals are improving and have resulted in a significant increase in the spot price For personal use only in the financial year to date. Market Analysis U3O8 Price Indicators Uranium price recovering with commercially sustainable 55 prices forecast in 2-3

  6. Slide 6: Uranium Market Snapshot

    Uranium Market Snapshot Tightening supply and increasing global demand are forecast to result in deficits in the For personal use only uranium market from 2016. Market Analysis Supply / Demand Forecasts  Long term uranium demand remains strong  Future growth is shifting away from developed markets

  7. Slide 7: Junction Dam – Resource Discovery

    Junction Dam – Resource Discovery For personal use only Junction Dam Resource:  Significant exploration conducted to date including:  Gravity, radon and EM data acquisition;  248 rotary mud drill holes;  11 sonic drill holes;  Geophysical logging of all drill holes;  Geochemical analysis of so

  8. Slide 8: Junction Dam – De-Risking Project Development

    Junction Dam – De-Risking Project Development For personal use only Commercialisation Potential:  Saffron deposit found to be suitable for ISR mining with:  Lithological analysis of the host sandstone returning results consistent with industry standard values for total uranium recovery by ISR meth

  9. Slide 9: Junction Dam – Progressing Towards Development

    Junction Dam – Progressing Towards Development For personal use only Forward Exploration Program  Complete Saffron deposit Retention Lease work including:  Installation of water monitoring bores and a pumping test to obtain and analyse data to assist with the understanding of the permeability and

  10. Slide 10: Melton Copper Project – Project Overview

    Melton Copper Project – Project Overview For personal use only Project Update:  Project located adjacent to the Rex Minerals Hillside Project  Rex Minerals has a mining lease, approvals to mine and is now focusing on developing a mine for its shallow copper resource  Marmota is progressing explor

  11. Slide 11: Melton Copper Project – Project Overview

    Melton Copper Project – Project Overview For personal use only Project Update:  March 2014 air core hole drilling program comprised 29 holes for ~2,000m in and around the Champion Prospect with the following results reported:  Grades of up to 2.92% Cu with mineralisation encountered from just belo

  12. Slide 12: Melton Copper Project – Identifying Drill Targets

    Melton Copper Project – Identifying Drill Targets Recently acquired EM data significantly enhances understanding of the Melton Copper Project For personal use only Historic BHP GEOTEM Image Recent RepTEM Data Historic BHP GEOTEM early time images, representing relatively close to surface Preliminary

  13. Slide 13: Aurora Tank – Project Overview

    Aurora Tank – Project Overview For personal use only Exploration Summary:  Marmota is free carried by Apollo Minerals on exploration activity (Apollo earning up to 75% interest)  Apollo Minerals reported initial drilling intersected high grade gold near surface including 5.0 g/t Au over 4 metres (

  14. Slide 14: Durkin Nickel (Pundinya) – Project Overview

    Durkin Nickel (Pundinya) – Project Overview For personal use only Exploration Summary:  Initial drilling produced significant grades of up to 1.38% nickel  Location provides potential for a reasonable resource  No similar mines in region, but with a good size resource can develop as in a good log

  15. Slide 15: Strategy

    Strategy: For personal use only  Focus on 3 core projects with 3 core commodities to ensure maximum value from investment dollar spend Commodities:  Uranium’s star is starting to turn so position key uranium asset to be at the front of the pack for commercialisation  Copper and gold provide good

  16. Slide 16: Focused on the Future – Contacts

    For personal use only Investor Presentation Focused on the Future Contacts November 2014 David Williams – Managing Director Marmota Energy Limited Adelaide Equity Partners David Williams Rohin Muller Managing Director Telephone: (08) 8232 8800 Telephone: (08) 8245 4000 Email: rmuller@adelaideequity.

Marmota Energy — Investor Presentation (February 2015) on 6ix