Marmota Limited · ASX:MEU

Marmota — Shareholder Meeting (November 2025)

14 slides from Marmota's shareholder meeting presentation, Nov 18, 2025

  1. Slide 1: Gawler Gold Scoping Study AGM Update

    Gawler Gold Gawler Craton Gawler Gold Scoping Study AGM UPDATE

  2. Slide 2: Scoping Study Update

    Scoping Study Update Presented by: Paul Richardson Project Manager Marmota Gawler Gold 2

  3. Slide 3: Gawler Gold tenement map

    6,720,000 6,680,000 6,640,000 280,000 320,000 360,000 400,000 440,000 Tenement Annotations F Tt = EL6487 OLF BO AURORA TA © MARMOTA | #222, , < T3 = EL6215 A P BOR — T4 = EL 5820 i i TS = EL6519 in 104 é Té = EL5817 =H 17 = EL6012 ." Gee + N Te = EL6502 Le T9 = EL 6463 R OOD A T10= EL6763 hi 56 6216

  4. Slide 4: Aurora Tank and Golden Moon JV map

    stn 0 “=... 5998 wy ae GREENEWOOD >MA \INWOOD- ays —s 20RA TANK 100% MEU «€ marRmotTa : Golden Moon JV * Gold Deposits Coombedown: 10% Title and Minerals Marmota (Half Moon): 90% Title and Minerals* Kilometre ‘360000 woo 800

  5. Slide 5: Scoping Study Contributors

    Scoping Study Contributors • Exploration Geology: Marmota Limited • Resource Estimation: Ashmore Advisory Pty Limited Richard Maddocks • Mining Engineering: Orelogy Consulting Pty Limited. • Metallurgical Testing: Australian Minmet Metallurgical Laboratories (AMML) Australian Laboratory Services (AL

  6. Slide 6: Scoping Study Scale

    Scoping Study Scale Aurora Tank Maiden Resource currently being finalised by Ashmore Advisory. Resource models and wireframes are being generated to provide the basis for mining engineering studies. The starting concept for the study is to build a regional heap leach process facility capable of trea

  7. Slide 7: Scoping Study Mining

    Scoping Study Mining SCOPE OF WORK Status: In Progress. For each resource: • Creation of a Whittle optimisation input model, using the resource models and wireframes, and apply ore loss/dilution parameters based on similar resources. • Pit Optimisation – determine optimisation input parameters (wall

  8. Slide 8: Scoping Study Metallurgy

    Scoping Study Metallurgy SCOPE OF WORK Status: Stage 1 Testing by AAML – Complete Stage 2 Confirmation Testing by ALS – In Progress • Comprehensive Head sample assays • Site Water Analysis and Buffer Testing & Lime Demand Testing • Bottle Roll Leach Tests – in treated site water and Perth tap water

  9. Slide 9: Scoping Study Heap Leach

    Scoping Study Heap Leach SCOPE OF WORK Status: To Commence once a mining schedule is available and metallurgical testing is completed: • Metallurgical Data and Flowsheet Review • Determination of Design Criteria • Calculation of Mass Balance and Water Balance • Description of Process • Preliminary E

  10. Slide 10: Scoping Study Services

    Scoping Study Services SCOPE OF WORK Status: To commence once a mining schedule is available, metallurgical testing is complete and process engineering design criteria have been determined. • Water Supply • Power Supply • Ore Transport Logistics • Accommodation • Labour Transport • Capital Cost Esti

  11. Slide 11: Scoping Study Heap Leach

    Scoping Study Heap Leach A Typical Example of a Gold Heap Leach Facility Source: U.S. Geological Survey – Public Domain. 11

  12. Slide 12: Scoping Study Schedule

    Scoping Study Schedule The scoping study should be complete by the end of the March Quarter (2026). ACTIVITY 2025 2026 September October November December January February March EXPLORATION AND GEOLOGY RESOURCE ESTIMATION MINING REVIEW METALLURGICAL TESTING PROCESS ENGINEERING INFRASTRUCTURE & SERVI

  13. Slide 13: Thank You

    Scoping Study <]marmora THANK YOU

  14. Slide 14: Disclaimer

    Disclaimer Disclaimer This presentation has been prepared by Marmota Limited (“MEU”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties and though MEU has no reason to bel