Salasar Techno Engineering Ltd. · NSE:SALASAR

Salasar Techno Engineering — H1 FY20 Earnings Presentation

29 slides from Salasar Techno Engineering's earnings presentation, Nov 13, 2019

  1. Slide 1: Cover letter to stock exchanges

    Salasar Techno Engineering Limited Dated: 13.11.2019 SALASAR To, The Manager - Listing The Secretary National Stock Exchange of India Ltd. Corporate Relationship Dept. Exchange Plaza, BandraKurla Complex | BSE Limited Bandra East P.J. Tower, Dalal Street, Mumbai — 400051 Mumbai — 400001 Symbol — SAL

  2. Slide 2: Investor Presentation H1 & FY20

    Salasar Techno Engineering Limited Investor Presentation H1 & FY20

  3. Slide 3: Disclaimer

    Disclaimer This presentation has been prepared by Salasar Techno Engineering Limited (the “Company”) solely for information purposes and does not constitute any offer, recommendation or invitation to purchase or subscribe for any securities, and shall not form the basis or be relied on in connection

  4. Slide 4: Table of Contents

    Table of Contents Company Overview Business Overview Consolidated Financial Highlights Way Ahead 3

  5. Slide 5: Company Overview

    y — | SALASAR i Company Overview

  6. Slide 6: About Us

    About Us Among Leading Manufacturers & Fabricators of Steel Structures in India Provider of Customized Infrastructure Solutions  Manufacturing and fabrication of steel structures for Telecom Towers, Transmission Towers, Substations Leading Manufacturer of Telecom Towers Structures and Solar Module

  7. Slide 7: Timeline

    Timeline FY 13 FY 18 Ventured into FY 16 Received Approved transmission Bagged Rs. 228 cr. Vendor status from business, 1st order projects for Rural PGCIL for 70 km line from Electrification st 1 order for FY 11 RRVPNL, Rajasthan from PVVNL, U.P. FY 17 Transmission Line (Funded under Ventured into M

  8. Slide 8: Management Team

    Management Team Mr. Alok Kumar Mr. Shashank Agarwal Chairman & ManagingDirector Joint Managing Director  B.Sc. from Punjab University  B.E. (Mech.) from MIT, Manipal  Over 40 years of experience in trading,  Responsible for operations, sales & marketing of manufacturing and fabrication of iron &

  9. Slide 9: Business Overview

    y gy SALASAR Business Overview

  10. Slide 10: Business Verticals

    Business Verticals Fabrication, Installation & Project Execution Telecom Poles Towers Transmission Solar Structures 9

  11. Slide 11: Product Portfolio

    Product Portfolio  Customized Galvanized and Non-galvanized steel structures  Process of applying protective zinc coating to steel or iron, to prevent rusting  Forms zinc coating - serves as sacrificial anode and protects base metal from corroding Angular Tubular  Preferred for small towers with

  12. Slide 12: Product Portfolio contd…

    Product Portfolio contd… Feeder Segregation and Rural Electrification  Carrying out separation of high Transmission Towers and Substation feeder for agricultural and non- Structures agricultural consumers  Tall structure usually steel lattice used to support overhead power line  Used in high-volt

  13. Slide 13: Product Portfolio

    Product Portfolio Smart Poles • Used in places where aesthetic requirements are high • Practical substitute - combination of Telecom Poles, Wi-Fi, Smart Lighting, Local Area Monitoring and environmental census • Designed as per requirement arising of local conditions 12

  14. Slide 14: Key Strengths

    Key Strengths State of Art Infrastructure Partnership with Ramboll Requisite Qualifications Customer Centric  State of art infrastructure facility for  Tie up with Ramboll for technical  Qualified to bid for Rural  Experienced team to work galvanizing steel structures expertise in Structural Des

  15. Slide 15: State of art Manufacturing Facilities

    State of art Manufacturing Facilities Location  Unit-I, Khasra No. 265, 281 & 283, Parsaun, Jindal Nagar, Dasna, Hapur-201313, Uttar Pradesh (UP)  Unit-II, Khasra No. 1184, 1185, Khera, Pilkhuwa, Hapur- 245304. Uttar Pradesh (UP)  Unit-III, Khasra No. 686/6, Khera, Pilkhuwa , Hapur- 245304, Uttar

  16. Slide 16: Awards & Recognitions

    Awards & Recognitions  Best Tower Partner award from Indus Towers for 2014-15  Excellence thru Collaboration award from Indus in 2014  Best Partners award from Bharti Infratel for 2014-15  One of Top PAN India Tower Supplier in VIOM and ATC  ‘Gold Award’ in Infra Structures (category: Tower man

  17. Slide 17: Bouquet of Satisfied Customers

    Bouquet of Satisfied Customers 16

  18. Slide 18: Consolidated Financial Highlights

    Consolidated Financial Highlights

  19. Slide 19: Joint Managing Director's Message

    Joint Managing Director’s Message Commenting on this development, Mr Shashank Agarwal, Joint Managing Director, Salasar Techno Engineering Ltd. said, “ We present the quarterly results of M/s Salasar Techno Engineering Ltd for Sep 2019. Our telecom business contributed 59%, whereas transmission busi

  20. Slide 20: Key Financial Highlights – Q2 FY20 (YoY)

    Key Financial Highlights – Q2 FY20 (YoY) Rs. 153.14 Cr Rs. 15.90 Cr Revenue from Operations EBITDA 10.38% Rs. 9.32Cr EBITDA Margin PAT Note - Numbers as per Ind AS guidelines 19

  21. Slide 21: Key Financial Highlights - Quarterly

    Key Financial Highlights - Quarterly Dispatch Volumes (MT) Revenue from Operations (Rs.Crs) 1396 1448 1498 1539 1682 1776 187.59 162.99 153.64 150.65 163.51 153.14 21228 17745 15446 17733 16618 14272 Q1FY19 Q2FY19 Q3FY19 Q4FY19 Q1FY20 Q2FY20 Scrap Structure Q1FY19 Q2FY19 Q3FY19 Q4FY19 Q1FY20 Q2FY20

  22. Slide 22: Q2 FY20 Financial Highlights

    Q2 FY20 Financial Highlights Particulars (Rs. Cr.) Q2 FY20 Q2 FY19 Q1 FY20 Income from Operation 153.14 153.64 163.51 Excise Duty 0.00 0.00 0.00 Revenue from Operations 153.14 153.64 163.51 Cost of Material Consumed 101.03 123.67 142.31 Changes in Inventories 20.98 0.15 -10.64 Raw Material Expenses

  23. Slide 23: Key Financial Highlights – H1FY20

    Key Financial Highlights – H1FY20 Rs. 316.65 Cr Rs. 32.62Cr Revenue from Operations EBITDA 10.30% Rs. 16.47 Cr EBIDTA Margin PAT Delivered strong & consistent performance in telecom and transmission Note - Numbers as per Ind AS guidelines 22

  24. Slide 24: H1 FY20 Financial Highlights

    H1 FY20Financial Highlights Particulars (Rs. Cr.) H1FY20 H1FY19 Income from Operation 316.65 316.64 Excise Duty 0.00 0.00 Revenue from Operations 316.65 316.64 Cost of Material Consumed 243.34 262.17 Changes in Inventories 10.34 -5.17 Raw Material Expenses 253.68 256.99 Employee Expenses 14.92 12.88

  25. Slide 25: Consolidated Balance Sheet as on 30th Sep 2019

    Consolidated Balance Sheet as on 30th Sep 2019 Rs. Crs Sep-19 Mar-19 Rs. Crs Sep-19 Mar-19 Equity 203.53 189.44 Non-current assets 90.48 86.56 Property, Plant and 13.29 13.29 82.09 77.30 Equity Share Capital Equipment Other Equity 190.24 176.15 Intangible Assets 0.00 0.00 Non-current liabilities 19.

  26. Slide 26: Way Ahead

    x] NS Way Ahead

  27. Slide 27: Industry Opportunities

    Industry Opportunities  Strong growth expected in telecom infrastructure industry - new technologies, 4G & expansion in rural areas to boost this growth  Around 70 per cent of towers in India are owned and operated by tower companies  Governments initiatives to electrify rural areas and build sma

  28. Slide 28: Way Ahead

    Way Ahead  Fully utilize additional 50,000 MT Galvanizing unit installed in FY18 Utilization of Incremental Capacity and  Continue to expand product portfolio by upgrading existing and introducing new Expanding Product Portfolio products to maintain market share and engage new customers  Continue

  29. Slide 29: Thank You

    Thank You SALASAR 540642 SALASAR IN SALASAR BO For further information, please contact: Company : Salasar Techno Engineering Limited Mr. Pramod Kumar Kala - CFO investor.relations@salasartechno.com www.salasartechno.com