Strickland Metals Ltd · ASX:STK
Strickland Metals — Investor Presentation (April 2025)
18 slides from Strickland Metals's investor presentation, Apr 1, 2025
Slide 1: Shanac Updated Mineral Resource Estimate
Shanac Updated Mineral Resource Estimate Webinar Presentation 1st April 2025 ASX Code: STK
Slide 2: Disclaimer
Disclaimer The information contained in the Presentation (Information) is a summary only and should be read in conjunction with any oral briefing and all other documents provided to you by the Strickland Metals Limited (Company). The Information is current as at the date of its release and the Compa
Slide 3: Rogozna Gold and Base Metals Project, Republic of Serbia
ROGOZNA GOLD AND BASE METALS PROJECT, REPUBLIC OF SERBIA
Slide 4: Serbia – A Favourable & Proven Mining Jurisdiction
Serbia – A Favourable & Proven Mining Jurisdiction Tier One Mining Jurisdiction ➢ Highly prospective geology – Western Tethyan Belt with multiple Giant porphyry-related deposits. ➢ Europe's 2nd largest copper producer. ➢ Established mining industry, with a long history of mining of polymetallic depo
Slide 5: Rogozna Project – A Massive Mineral System
Rogozna Project – A Massive Mineral System Four skarn-hosted gold + base metal deposits defined by >120,000m diamond drilling. 199Mt @ 1.2g/t AuEq for 7.4Moz AuEq Inferred Resources1 for three of the four deposits. 3.97Moz Au, 320kt Cu, 830kt Zn and 32.2Moz Ag. Located in the heart of one of Europe’
Slide 6: Shanac Deposit Overview
Shanac Deposit Overview 150Mt @ 1.1g/t AuEq for 5.30Moz AuEq JORC 2012 Inferred Resources.1 Gold-Copper (+Zinc, Lead, Silver) mineralisation defined over 600m of strike, 500m width and 500m vertical extent, commencing just 40m below surface. Gold and Copper account for 75% of contained metal (by ins
Slide 7: Shanac Grade-Tonnage
Shanac Deposit Updated Mineral Resource Estimate Shanac Grade-Tonnage 150Mt @ 1.1g/t AuEq for 5.30Moz AuEq JORC 2012 160 2 Inferred Resources.1 Includes 1.85Moz AuEq of 140 higher-grade (1.8g/t AuEq) resources. 1.8 120 Grade (AuEq g/t) Tonnes (Mt) 1.6 MIK bulk tonnage model with 10m (x) x 10m (y) x
Slide 8: Shanac Deposit Updated Mineral Resource Estimate
Shanac Deposit Updated Mineral Resource Estimate 150Mt @ 1.1g/t AuEq for 5.30Moz AuEq JORC 2012 Inferred Resources.1 Includes 1.85Moz AuEq of higher-grade (1.8g/t AuEq) resources. MIK bulk tonnage model with 10m (x) x 10m (y) x 10m (z) blocks. Constrained by Sub Level Cave UG mining stopes: $US 35/t
Slide 9: Shanac Deposit Updated Mineral Resource Estimate
Shanac Deposit Updated Mineral Resource Estimate 150Mt @ 1.1g/t AuEq for 5.30Moz AuEq JORC 2012 Inferred Resources.1 Includes 1.85Moz AuEq of higher-grade (1.8g/t AuEq) resources. F MIK bulk tonnage model with 10m (x) x 10m (y) x 10m (z) blocks. Constrained by Sub Level Cave UG mining stopes: $US 35
Slide 10: Shanac Deposit Updated Mineral Resource Estimate
Shanac Deposit Updated Mineral Resource Estimate 150Mt @ 1.1g/t AuEq for 5.30Moz AuEq JORC 2012 Inferred Resources.1 Includes 1.85Moz AuEq of higher-grade (1.8g/t AuEq) resources. MIK bulk tonnage model with 10m (x) x 10m (y) x 10m (z) blocks. Constrained by Sub Level Cave UG mining stopes: $US 35/t
Slide 11: Shanac Deposit Updated Mineral Resource Estimate
Shanac Deposit Updated Mineral Resource Estimate E F 150Mt @ 1.1g/t AuEq for 5.30Moz AuEq JORC 2012 Inferred Resources.1 Includes 1.85Moz AuEq of higher-grade (1.8g/t AuEq) resources. MIK bulk tonnage model with 10m (x) x 10m (y) x 10m (z) blocks. Constrained by Sub Level Cave UG mining stopes: $US
Slide 12: Shanac Deposit Updated Mineral Resource Estimate
Shanac Deposit Updated Mineral Resource Estimate 150Mt @ 1.1g/t AuEq for 5.30Moz AuEq JORC 2012 Inferred Resources.1 Includes 1.85Moz AuEq of higher-grade (1.8g/t AuEq) resources. MIK bulk tonnage model with 10m (x) x 10m (y) x 10m (z) blocks. Constrained by Sub Level Cave UG mining stopes: $US 35/t
Slide 13: Shanac Upside
Shanac Upside Mineralisation open along strike and at depth. High-grade, gold-only intercepts to the north of the current resource footprint, not followed up: 1 • 8.0m @ 7.4g/t Au from 327.5m (ZRSD20126). • 9.0m @ 3.0g/t Au from 415.0m (EOKSC1246). Red Creek Prospect located 500m to the west. • Larg
Slide 14: Shanac Next Steps
Shanac Next Steps 6,000m drilling in 2025 – expand recently discovered high-grade gold skarn volume and continue testing the prospective Andesite/Skarn contact on the western side of the central domain. Further improve the resource model - especially the distribution and continuity of higher-grade z
Slide 15: Summary
Summary 50,000m resource and discovery-focused drilling program across Rogozna, with a steady stream of news-flow throughout 2025. 7.40Moz AuEq JORC 2012 Inferred Resources with multiple resource upgrades to be delivered. Rogozna scoping study to be delivered by the end of the year. Exceptional leve
Slide 16: Appendix 1: Rogozna Inferred Mineral Resource Estimates
Appendix 1: Rogozna Inferred Mineral Resource Estimates Tonnes AuEq Au Cu Ag Pb Zn AuEq Au Cu Ag Pb Zn Prospect (Mt) (g/t) (g/t) (%) (g/t) (%) (%) (Moz) (Moz) (kt) (Moz) (kt) (kt) Medenovac (February 21 1.9 0.77 0.27 6.3 0.11 1.54 1.28 0.52 57 4.3 23 320 2025)A Shanac (March 150 1.1 0.64 0.12 5.8 0.
Slide 17: Disclaimer
Disclaimer Gold Equivalent Calculations (Rogozna Project) Gold Equivalent calculations for exploration results within this presentation are based on the following metal prices; For Shanac, Medenovac and Kotlovi (US$1,750/oz), copper (US$10,000/t), silver (US$25/oz), lead (US$2,200/t), zinc (US$3,000
Slide 18: Paul L’Herpiniere, Managing Director
Paul L’Herpiniere, Managing Director info@stricklandmetals.com.au +61 8 6317 9875
Strickland Metals — Investor Presentation (April 2025) on 6ix