Tasman Resources Ltd · ASX:TAS

Tasman Resources — Shareholder Meeting (November 2008)

18 slides from Tasman Resources's shareholder meeting presentation, November 2008

  1. Slide 1: AGM Presentation November 2008

    Slide 1: AGM Presentation November 2008

    AGM Presentation November 2008

  2. Slide 2: Tasman Group Corporate Overview

    Slide 2: Tasman Group Corporate Overview

    Tasman Group Corporate Overview Tasman Resources NL Minerals (TAS) Shale Oil,Au, Ag, Cu, Ni, Pb, Zn, U 26.3%* WCP JV 24.4%* (IOCGU) Diamonds JV Eden Energy Ltd (EDE) Fission Energy Ltd (FIS) 100% Hydrogen & Hythane 100% 50% SA Uranium Pyrolysis 100% 50% Coal Bed Methane WA Uranium 100% 50% SA Natura

  3. Slide 3: Tasman Resources: Project Locations

    Slide 3: Tasman Resources: Project Locations

    Tasman Resources: Project Locations

  4. Slide 4: Principal Projects

    Slide 4: Principal Projects

    Principal Projects: • Parkinson Dam, SA (Gold-Silver) • Lake Torrens, SA (JV, IOCGU) • Gawler Craton, SA (Gold, Nickel) • Julia Creek, Qld (Oil Shale) • Mirrica, Qld (Gold, Base Metals) • Diamonds, SA (JV)

  5. Slide 5: Parkinson Dam Location

    Slide 5: Parkinson Dam Location

    Parkinson Dam Location 6420000 mN_S 6400000 mN Zz E o 3 r=] s3 BS cy oo

  6. Slide 6: Parkinson Dam

    Slide 6: Parkinson Dam

    Parkinson Dam • Epithermal Gold & Silver - 4.5km2 area • Best Drilling Results Include: – 21g/t Au, 83g/t Ag over 21m – 44.2g/t Ag, 18.1% Pb, 1.1% Zn over 3m • Structure hosting high grades defined = key target

  7. Slide 7: Parkinson Dam – Surface Outcrops

    Slide 7: Parkinson Dam – Surface Outcrops

    Parkinson Dam – Surface Outcrops Epithermal crustiform-colloform layered quartz veining

  8. Slide 8: Parkinson Dam – High Grade Mineralisation

    Slide 8: Parkinson Dam – High Grade Mineralisation

    Parkinson Dam – High Grade Mineralisation • PD 63: 21m @ 21g/t Au, 83g/t Ag (inc 9m @ 31g/t Au, 152 g/t Ag) • Distinctive late-stage epithermal veining: – Quartz & haematite – Apatite, chlorite, muscovite (vanadiferous phengite) – Lead, zinc & copper poor • Gold (electrum, ~ 35% Ag)

  9. Slide 9: Parkinson Dam: Gold – Silver Mineralisation

    Slide 9: Parkinson Dam: Gold – Silver Mineralisation

    Parkinson Dam: Gold – Silver Mineralisation Free gold (electrum) associated with epithermal quartz and haematite

  10. Slide 10: Parkinson Dam – Mineralisation/Alteration

    Slide 10: Parkinson Dam – Mineralisation/Alteration

    Parkinson Dam – Mineralisation/Alteration Epithermal-style quartz – sulphide (pyrite, galena, sphalerite) mineraliation

  11. Slide 11: Parkinson Dam PD 63: 21m at 21g/t Au, 83g/t Ag

    Slide 11: Parkinson Dam PD 63: 21m at 21g/t Au, 83g/t Ag

    Parkinson Dam PD 63: 21m at 21g/t Au, 83g/t Ag High grade, narrow, steep structure: E-W strike Open to west for approx. 1.5km Significant, thick Pb & Zn: PD 70: 50m at 0.9% Zn, 0.3% Pb

  12. Slide 12: Parkinson Dam: P15 Long Section

    Slide 12: Parkinson Dam: P15 Long Section

    Parkinson Dam: P15 Long Section

  13. Slide 13: Parkinson Dam: Diamond and RC Drilling

    Slide 13: Parkinson Dam: Diamond and RC Drilling

    Parkinson Dam: Diamond and RC Drilling

  14. Slide 14: Lake Torrens IOCGU Project

    Slide 14: Lake Torrens IOCGU Project

    Lake Torrens IOCGU Project • 4,517 km2 of tenements adjacent to Olympic Dam • IOCGU mineralisation at Titan (inc 334m @ 0.1% Cu) • Untested targets at Vulcan, Zeus, Billy Barnes, Atlas, plus others • JV - WCP to earn 65% after expenditure of $6.5 million

  15. Slide 15: Lake Torrens IOCGU Potential

    Slide 15: Lake Torrens IOCGU Potential

    Lake Torrens IOCGU Potential

  16. Slide 16: Tasman Resources: Vulcan Prospect

    Slide 16: Tasman Resources: Vulcan Prospect

    Tasman Resources: Vulcan Prospect • Strong gravity anomaly (UBC geophysical model) • Associated magnetic anomaly • No previous drilling • Approx. 30km N of Olympic Dam

  17. Slide 17: Tasman Resources: Julia Creek Project, Qld

    Slide 17: Tasman Resources: Julia Creek Project, Qld

    Tasman Resources: Julia Creek Project, Qld • Oil shale potential • EPM Applications over 1,915km2 • Target is Toolebuc Formation • Reported oil shale yields 65-75 litres/tonne from area • 600km west of Townsville • Shallow, potentially open- pittable areas selected

  18. Slide 18: Tasman Resources – AGM November 2008

    Slide 18: Tasman Resources – AGM November 2008

    Tasman Resources – AGM November 2008 • The information in this presentation that relates to Exploration Results and Activities is based on information compiled by Robert Smith, who is a Member of the Australian Institute of Geoscientists. Robert Smith is a full-time employee of the Company. Robert S

Source: Internet Archive copy of tasmanresources.com.au

More decks from Tasman Resources Ltd

All 44 Tasman Resources decks