Sattva Engineering Construction Limited · NSE:SATTVAENGG

Sattva Engineering Construction — Investor Presentation (November 2025)

28 slides from Sattva Engineering Construction's investor presentation, Nov 7, 2025

  1. Slide 1: TANGUDU Digitally LAXMIKANT LAXMIKANTH H

    TANGUDU Digitally TANGUDU signed by LAXMIKANT LAXMIKANTH Date: 2025.11.07 H 19:20:36 +05'30'

  2. Slide 2: Investor Presentation

    el . SS * : Fr x %, v i, te Gs 2 LJ ZL (a ENGINEERING CONSTRUCTION LIMITED INVESTOR PRESENTATION

  3. Slide 3: Safe Harbour

    SAFE HARBOUR This presentation has been prepared by Sattva Engineering Construction Limited (the “Company”) for general information purposes only and does not constitute, nor should it be regarded as, an offer, invitation, inducement, solicitation or advertisement with respect to the purchase or sal

  4. Slide 4: Table of Contents

    TABLE OF CONTENTS Company’s Strengths & Overview 24 Strategies Industry’s 14 Overview Financial 19 Performance 3

  5. Slide 5: Company Overview

    COMPANY OVERVIEW

  6. Slide 6: Company Overview

    COMPANY OVERVIEW • The Company is an ISO 9001:2015, ISO 45001:2018 and ISO 14001:2015 certified engineering, procurement and construction (“EPC”) company. • Engaged in the business of providing water resource management solutions which includes the Water Supply Scheme (“WSS”) with underground and ov

  7. Slide 7: Business Verticals

    BUSINESS VERTICALS WATER STORAGE & SUPPLY • Designs and construct large underground and overhead water tanks for storage and supply of potable/drinking water along with pump house, laying the pipeline from the water tank and achieving house service connections including electromechanical works. UNDE

  8. Slide 8: Revenue Break-up

    REVENUE BREAK-UP Particulars Half Year 2025-26 FY 2024-25 Amount % of Total Income Amount % of Total Income Water Supply Scheme Scheme 2,506.37 49.48% 5,957.41 63.61 % Under Ground Sewerage System 1,889.35 37.30% 2,439.44 26.04 % Sewage Treatment Plant 604.36 11.93% 276.30 2.95 % Water Treatment Pla

  9. Slide 9: WSS - Completed Projects

    WSS - COMPLETED PROJECTS Total Contract Year of Description of Project Value Location (₹ in lakhs) Completion Water Supply Schemes Providing water supply scheme to Pallavaram, 4,445.00 2021 Pallavaram Municipality - Package I Chennai Providing Water Supply Scheme at Tiruchengode Tiruchengode Municip

  10. Slide 10: Other Completed Projects

    OTHER COMPLETED PROJECTS Description of Project Total Contract Year of Value Location (₹ in lakhs) Completion Design, Engineering, Build and Commissioning of 50 MLD STP in Nesapakkam with SBR technology with power generation from biogas including 8,513.00 Nesapakkam, 2023 Operation and maintenance f

  11. Slide 11: Milestones

    Milestones 2005 2013 2016 2020 • Incorporation of Bagged major water • Crossed turnover of • Bagged its first order Company as Sattva supply scheme order ₹50 Crores for 50 MLD capacity Engineering amounting to ₹57.50 sewerage treatment Construction Private lakhs for Pallavaram plant for the value of

  12. Slide 12: Board of Directors

    BOARD OF DIRECTORS S Seshadri, R Sekar, G Sujatha, Sankar V, Krishnamachari D, Venkatachalam S, WTD WTD WTD & CFO Ind. Director Ind. Director Ind. Director • Diploma in Civil • Diploma in Civil • Bachelor of Commerce • Fellow member of the • Bachelor of Science , • Bachelor of Technology, Engineerin

  13. Slide 13: KMPs & SMPs

    KMPs & SMPs Laxmikanth T. Thyagaraja, K. Balakrishnan, PR Saanakyan, Venugopal S D, CS SVP Projects VP BD & TA VP Tender & PC VP Finance • Has over two and half • Diploma in Mechanical • Diploma in Civil Engineering • CA Intermediate • Bachelor of Commerce decades of experience in Engineering , Dipl

  14. Slide 14: Organization Structure

    ORGANIZATION STRUCTURE Board of Directors R. Sekar Santhanam Whole Time Seshadri Director Whole Time Director (Operations) (Commercial) Thyagarajan K. Balakrishnan PR Saanakyan G. Sujatha Laxmikanth T Senior Vice President Vice President Vice President Whole Time Director (Projects) (Business Compan

  15. Slide 15: Industry Overview

    ENGNEERNG CONSTRUCTOR INDUSTRY OVERVIEW 14

  16. Slide 16: Water EPC Industry

    W AT ER E P C INDUSTRY • An EPC company specializing in water resource management solutions is responsible for delivering end-to-end water infrastructure projects. This includes designing, procuring, constructing, and commissioning Water Supply Schemes (WSS) that incorporate underground and overhead

  17. Slide 17: Water Management in India

    W A T E R M A N A G E M E N T IN I N D I A • India is experiencing a severe water crisis due to rising demand, Water Supply Scheme & its Components depleting resources, and uneven distribution. Per capita water availability has been steadily declining, pushing the country toward water stress. • The

  18. Slide 18: Water Treatment Market in India

    W A T E R T R E A T M E N T M A R K E T IN I N D I A The Indian EPC industry market for water treatment projects is estimated to have grown from USD 1.4 billion in 2021 to USD 1.9 billion in 2024, with a CAGR of 11.4%. Source: 6W research • The EPC wastewater treatment market in India is expected to

  19. Slide 19: Wastewater Distribution in India

    W A S T E W A T E R D I S T R I B U T I O N IN I N D I A India's water and wastewater treatment market is projected to grow significantly, reaching an estimated value of USD 3.7 billion, with a CAGR of 11.0% between 2024 to 2030. Source- 6W research and Dun & Bradstreet Research India Water and Wast

  20. Slide 20: Financial Performance

    dd i INEERING CONGTRUCTON isa FINANCIAL PERFORMANCE

  21. Slide 21: Financial Highlights

    FINANCIAL HIGHLIGHTS Total Income (₹ in Lakhs) 9484.97 EBITDA (₹ in Lakhs) & EBITDA Margin ( %) 10000 8393.46 2500 20.84% 7743.63 8000 1976.19 2000 15.79% 6000 5100.15 1500 1222.71 17.19% 9.02% 877.13 4000 1000 757.26 500 2000 0 -0 FY2023 FY2024 FY2025 HFY2026 FY 2023 FY 2024 FY 2025 HFY 2026 PAT (

  22. Slide 22: Financial Highlights

    FINANCIAL HIGHLIGHTS Adjusted Networth ( ₹ in Lakhs) 10000 Basic EPS 7954.86 10 8000 8 7.64 6000 6.66 4342.00 6 4000 2403.10 4.15 1946.73 2000 4 0 2 0.94 FY2023 FY2024 FY2025 HFY2026 0 Series1 Series2 Linear (Series1) FY2023 FY2024 FY2025 HFY2026 Current Ratio Debt-Equity Ratio 3 2 1.66 1.6 2.09 1.3

  23. Slide 23: Financial Performance

    FINANCIAL PERFORMANCE Particulars (INR in Lacs) Half Yearly26 FY25 FY24 Revenue: Revenue from Operations 5,065.38 9,365.04 7,693.07 Other Income 35.00 119.94 50.56 Total Income 5,100.38 9,484.97 7,743.63 Expenses: a) Direct Contract Expenses. 1,040.08 2,777.92 1,941.36 b) Cost Of Materials Consumed

  24. Slide 24: Financial Performance

    FINANCIAL PERFORMANCE Particulars (INR in Lacs) HY26 FY25 FY24 Particulars (INR in Lacs) HY26 FY25 FY24 Equity & Liabilities: Non-current assets: Share Capital 1,746.86 1,275.18 99.90 (a) Property, plant and equipments 432.19 410.72 378.60 Reserves & Surplus 6208.00 3,066.82 2,303.20 (b) Non Current

  25. Slide 25: Strengths & Strategies

    INEERING CONGTRUCTON isa STRENGTHS & STRATEGIES

  26. Slide 26: Strengths

    STRENGTHS Strong Execution Capabilities supported Use of advanced technologies in the Projects funded by Major International by In-house Designing, Engineering and construction and installation of STP and Financial Organizations Execution Team WTP • The Company focusses on design capabilities for •

  27. Slide 27: Strategies

    STRATEGIES Executing Large Sized Projects and Enhancing Expanding Geographical Reach Execution Capabilities • The Company has executed projects ranging from 12.5 MLD to 60 MLD in • The Company aims to gradually expand its business operations to other past and will continue to bid for WSPs and STPs,

  28. Slide 28: CHSATTVA

    CHSATTVA ENGNEERNG CONSTRUCTION GRATED

Sattva Engineering Construction — Investor Presentation (November 2025) on 6ix