34 slides from Sattva Engineering Construction's investor presentation, Mar 10, 2026
Slide 1: Cover letter to NSE: Investor Presentation intimation
(formerly known-as Sattva Engineering Construction Private Limited) (CIN: L45201TN2005PLC058383) March 10, 2026 To, National Stock Exchange of India Limited Exchange Plaza, C-1, Block G Bandra Kurla Complex Bandra (E), Mumbai – 400 051 SYMBOL: SATTVAENGG Dear Sir / Ma’am, Subject: Investor Presentat
Slide 2: Investor Presentation
1 INVESTOR P R E S E N TAT I O N
Slide 3: Safe Harbour
SAFE HARBOUR 2 This presentation has been prepared by Sattva Engineering Construction Limited (the “Company”) for general information purposes only and does not constitute, nor should it be regarded as, an offer, invitation, inducement, solicitation or advertisement with respect to the purchase or s
Slide 4: Table of Contents
TABLE OF CONTENTS 3 Strengths & 04 Company‟s 24 Strategies Overview Financial Contracts 17 Performance 28 Bagged 23 Order Book
Slide 5: Company Overview
4 COMPANY OVERVIEW
Slide 6: Company Overview
C O M P AN Y OVERVIEW 5 • The Company is an ISO 9001:2015, ISO 45001:2018 and ISO 14001:2015 certified engineering, procurement and construction (“EPC”) company. • Engaged in the business of providing water resource management solutions which includes the Water Supply Scheme (“WSS”) with underground
Slide 7: Business Vertical
BUSINESS VERTICAL 6 WATER STORAGE & SUPPLY •Design and construct large underground and overhead water tanks for storage and supply of potable/drinking water along with pump house, laying the pipeline from the water tank and achieving house service connections including electromechanical works. UNDER
Slide 8: New Business Verticals
NEW BUSINESS VERTICALS 7 INDUSTRIAL AND UTILITY BUILDINGS SECTOR: • SECL plans to re-enter into the construction of buildings and factories as a separate profit center vertical. • The company plans to benefit from the major thrust in infrastructure spends in the Union budget 26-27, with an allocatio
Slide 9: Revenue Break-up
R E V E N U E B RE AK - UP 8 Particulars Half Year 2025-26 FY 2024-25 Amount % of Total Income Amount % of Total Income Water Supply Scheme 2,506.37 49.48% 5,957.41 63.61 % Under Ground Sewerage System 1,889.35 37.30% 2,439.44 26.04 % Sewage Treatment Plant 604.36 11.93% 276.30 2.95 % Water Treatmen
Slide 10: WSS - Completed Projects
WSS - COMPLETED PROJECTS 9 Total Contract Year of Description of Project Value Location (₹ in lakhs) Completion Ennore Creek crossing under Backwater Chennai 2512.53 2022 with HDPE 900MM pipe. Civil works for Design, build and operate a Kodungaiyur, 661.00 2021 45MLD capacity tertiary treated revers
Slide 11: Other Completed Projects
O TH E R C O M P L E T E D P R O J E C T S 10 Description of Project Total Contract Year of Value Location (₹ in lakhs) Completion Design, Engineering, Build and Commissioning of 50 MLD STP in Nesapakkam, chennai with SBR technology with power generation from 8,513.00 Nesapakkam, 2023 biogas includi
Slide 12: Ongoing Projects
ONGOING PROJECTS 11 Description of Project Total Contract Value Location (₹ in lakhs) Design, engineering, build and commissioning of 12.51mld capacity sewage treatment plant at santhapuram & 20.13mld capacity sewage treatment plant at 10,703.00 Hosur, ramanaiken with sequential batch reactor Chenna
Slide 13: Ongoing Projects
ONGOING PROJECTS 12 Description of Project Total Contract Value Location (₹ in lakhs) Providing comprehensive under ground sewerage scheme to semmenchery 5,474.00 semmenchery, Chennai Replacement of water distribution mains 5,689.00 including construction of 38ll overhead tank Kannaginagar, and prov
Slide 14: Milestones
MILESTONES 13 2005 2020 2013 2016 Incorporation of • Bagged its first order Bagged major water for 50 MLD capacity Company as Sattva supply scheme order • Crossed turnover sewerage treatment of ₹50 Crores Engineering amounting to ₹57.50 plant for the value of ₹108 Crores on design, build, Constructi
Slide 15: Board of Directors
B O A R D O F DIRECTORS 14 S Seshadri, R Sekar, G Sujatha, Sankar V, Krishnamachari D, Venkatachalam S, WTD WTD WTD & CFO Ind. Director Ind. Director Ind. Director • Diploma in Civil • Bachelor of Commerce • Fellow member of the • Bachelor of Science , • Diploma in Civil • Bachelor of Technology, En
Slide 16: KMPs & SMPs
KMPs & SMPs 15 Thyagaraja, PR Saanakyan, Venugopal S D, Laxmikanth .T, K. Balakrishnan, VP Finance SVP Projects VP Tender & PC Company Secretary VP BD & TA • Has over two and half • Diploma in Mechanical • Diploma in Civil Engineering • CA Intermediate • Bachelor of Commerce decades of experience in
Slide 17: Organization Structure
ORGANIZATION STRUCTURE 16 Board of Directors R. Sekar Santhanam Seshadri Whole Time Director Whole Time Director (Operational) (Commercial) Thyagarajan K. Balakrishnan PR Saanakyan G. Sujatha Laxmikanth T Senior Vice President Vice President Vice President Whole Time Director (Projects) (Business Co
Slide 18: Financial Performance
SNEEAING CONSTRUCTION ih ! he oh bai
Slide 19: Financial Highlights
FINANCIAL HIGHLIGHTS 18 10000 Total Income (₹ in Lakhs) 9484.97 EBITDA (₹ in Lakhs) & EBITDA Margin ( %) 8393.46 2500 20.84% 7743.63 8000 1976.19 2000 15.79% 6000 5100.38 1500 17.19% 9.02% 1222.71 4000 877.35 1000 757.26 2000 500 0 0 FY 2023 FY 2024 FY 2025 HFY 2026 FY2023 FY2024 FY2025 HFY2026 PAT
Slide 20: Financial Highlights
FINANCIAL HIGHLIGHTS 19 Adjusted Networth ( ₹ in Lakhs) Basic EPS 10000 10 7954.86 8000 7.64 8 6.66 6000 6 4342.00 4.15 4000 2403.10 4 1946.73 2000 2 0.94 0 0 FY2023 FY2024 FY2025 HFY2026 FY2023 FY2024 FY2025 HFY2026 Current Ratio Debt-Equity Ratio 3 2 1.66 2.09 1.6 1.34 2 1.47 1.2 1.26 1.27 0.83 1
Slide 21: Financial Performance
FINANCIAL P E RF O RMANC E 20 Particulars (INR in Lacs) Half Yearly26 FY25 FY24 Revenue: Revenue from Operations 5,065.38 9,365.04 7,693.07 Other Income 35.00 119.94 50.56 Total Income 5,100.38 9,484.97 7,743.63 Expenses: a) Direct Contract Expenses. 1,040.08 2,777.92 1,941.36 b) Cost Of Materials C
Slide 22: Financial Performance
FINANCIAL P E RF O RMANC E 21 Particulars (INR in Lacs) HY26 FY25 FY24 Particulars (INR in Lacs) HY26 FY25 FY24 Equity & Liabilities: Non-current assets: Share Capital 1,746.86 1,275.18 99.90 (a) Property, plant and equipments 432.19 410.72 378.60 Reserves & Surplus 6208.00 3,066.82 2,303.20 (b) Non
Slide 23: Financial Performance – Nine Months Ended December 2025
Financial Performance – Nine Months Ended 31 December 2025 (9Months): 22 Performance – 9Months 90 Turnover 80 9months • Turnover achieved(9months): Rs. 88 Crores 70 Turnover • Corresponding 9months period (FY 2024– 60 25): Rs. 65 Crores 50 40 30 20 Growth 10 • Year on Year growth @ 35% 12-24 12-25 D
Slide 24: Order Book & Execution Visibility
Order Book & Execution Visibility: 23 Firm order book (as on 31 December 2025): ₹340 Crores (Projects currently under execution) Provides strong short-term revenue visibility Execution visibility spans 18–24 months (Approx.)
Slide 25: Strengths & Strategies
SAT TVA) RENGERING CONGTRLCTION UNTER] STRATEGIES
Slide 26: Strengths
STRENGTHS 25 Strong Execution Capabilities supported Use of advanced technologies in the Projects funded by Major International by In-house Designing, Engineering and construction and installation of STP and Financial Organizations Execution Team WTP • Several projects are partly funded by the Centr
Slide 27: Strategies
STRATEGIES 26 Executing Large Sized Projects and Enhancing Execution Capabilities Expanding Geographical Reach • The Company has executed projects ranging from 12.5 MLD to 50 MLD in • The Company aims to gradually expand its business operations to other states, past and will continue to bid for WSPs
Slide 28: New Geographical Area: Karnataka
New Geographical Area: Karnataka 27 • The Company has expanded into a new geographical area by participating in tenders issued by the Bangalore Water Supply and Sewerage Board (BWSSB), KARNATAKA. • The Company has successfully secured one (1) tender and has also participated in several other tenders
Slide 29: Contracts Bagged
CONTRACTS BAGGED: Total value of all 4 Contracts (FY 2025-26): Rs. 150.91Crores (approx). 28 In TAMIL NADU: 1. Award of Contract (“AoC”) from Chennai Metropolitan Water Supply and Sewerage Board (“CMWSSB”) • Project: “Design, Build, Operate and Transfer of 47 MLD capacity Water Treatment Plant at Su
Slide 30: Contracts Bagged: Karnataka
CONTRACTS BAGGED: 29 In KARNATAKA: 3. Award of Contract (“AoC”) from Banglore Water Supply and Sewerage Board (“BWSSB”), signifying its expansion into a new geographical location. • Project: “Improvement work of Installation, Supply & Commissioning of Odour Control Unit (OCU) at Hebbal 100 MLD UWTP
Slide 31: Contracts Bagged: Uttar Pradesh
CONTRACTS BAGGED: 30 In UTTAR PRADESH: 4. Purchase Order from 21st Century Enviro Engineers Private Limited • Project: Engineering Services for Sewerage Treatment Plant • Location: Deoband, sharanpur, Uttar Pradesh • Value of Order: Rs. 0.20Lakhs exclud. Gst.
Slide 32: Project Inauguration: Semmenchery Water Supply Scheme
PROJECT INAUGURATION: Comprehensive Water Supply Scheme for Semmenchery (Division 200), Area XV, Chennai, executed by M/s. Sattva, has been commissioned and was inaugurated on 05 February 2026 at 10:30AM, by the Honourable Chief Minister of Tamil Nadu, Thiru M. K. Stalin. 31 Key Highlights of the Pr
Slide 33: Project Inauguration: Kannagi Nagar
PROJECT INAUGURATION: operational portion of Kannagi Nagar TNUHDB, Division 196 (Part), Area XV, Chennai, executed by M/s. Sattva Engineering Construction Limited, has been partially commissioned and was inaugurated on 04 March 2026 at 10:15AM, by the Honourable Chief Minister of Tamil Nadu, Thiru M
Slide 34: Thank You
oe THANKYOU __ ENGINEERING CONSTRUCTION LIMITED