Surge Copper Corp. · TSXV:SURG

Surge Copper — Investor Presentation (February 2025)

43 slides from Surge Copper's investor presentation, Feb 1, 2025

  1. Slide 1: Unlocking Value in an Established Mining District

    TSXV:SURG | OTCQB:SRGXF | FRA:G6D2 Unlocking Value in an Established Mining District Q10 2025

  2. Slide 2: Disclaimer

    Disclaimer This presentation (“Presentation”) is being issued by Surge Copper Corp. (the “Company” or “Surge Copper”) for information purposes only. Cautionary Statements Concerning Forward-Looking Statements This Presentation contains "forward-looking information" within the meaning of applicable C

  3. Slide 3: Why Surge?

    Why Surge? S URGE IS IN A DESIRABLE POSITION FOR THE FUTURE OF THE GLOBAL METALS MARKET • The right metals − Copper + Molybdenum + Precious Metals − Exposure to end markets with favourable long term demand growth and supply dynamics • Premium location − Infrastructure-rich area of BC (not the Golden

  4. Slide 4: District Overview

    District Overview S URGE CONTROLS 100% OF A LARGE , CONTIGUOUS MINERAL CLAIM PACKAGE IN THE B ERG -H UCKLEBERRY -O OTSA DISTRICT Competitive Advantages ✓100% ownership of 141,699-hectare contiguous land package ✓Over 1.4 Bt of combined M+I resources1 at Berg & Ootsa ✓Road accessible from the Trans-

  5. Slide 5: Strategically Significant Project

    Strategically Significant Project S IGNIFICANT VOLUMES OF CRITICAL MINERALS C U & M O OVER 30- YEAR MINE LIFE Breakdown Production Profile 3.8 Blbs LOM 350 $3.00 126 Mlbs/yr Cu 64% of Revenue 292 290 Co-Product Cash Costs (US$/lb CuEq) 300 277 274 273 $2.50 402 Mlbs LOM Recovered Copper Eq. (Mlbs Cu

  6. Slide 6: Maiden Berg PEA Highlights

    Maiden Berg PEA Highlights R OBUST BASE CASE ECONOMICS WITH SIGNIFICANT LOW - COST PRODUCTION OVER A LONG MINE LIFE C$2.1B Base Case After-Tax NPV8% 6.0Blbs Life-of-Mine CuEq1 Production 30 Year Mine Life 20% Base Case After-Tax IRR 199Mlbs Annual CuEq Production C$348m Life-of-Mine Avg. Annual Afte

  7. Slide 7: Metal Price Sensitivity

    Metal Price Sensitivity B ERG PEA ECONOMICS ARE ROBUST UNDER A WIDE RANGE OF LONG - TERM COMMODITY PRICE ASSUMPTIONS After-Tax NPV8% Sensitivity to Cu & Mo Prices (C$mm) After-Tax IRR Sensitivity to Cu & Mo Prices (%) - Base Case Copper Price (US$/lb) Copper Price (US$/lb) $2.80 $3.20 $3.60 $4.00 $4

  8. Slide 8: Berg Project: Straight Forward Appeal

    Berg Project: Straight Forward Appeal F AVOURABLE LOCATION , OREBODY GEOMETRY , AND SIMPLE DESIGN ✓Close to infrastructure & low cost hyrdo power (not remote like Golden Triangle) ✓Mine to be developed as a single open pit (no complex sequencing or block cave development) ✓Low strip ratio, mineraliz

  9. Slide 9: Simple Project Design

    Simple Project Design L OW COMPLEXITY CONFIGURATION DESIGNED TO MINIMIZE ENVIRONMENTAL FOOTPRINT & CARBON EMISSIONS Highlights ✓Single, long-life open pit mine ✓Use of downhill, electric- powered overland conveyors ✓Conventional flowsheet to produce copper concentrate (with PM by- products) plus mol

  10. Slide 10: One of the Largest Resource Bases in Western Canada

    One of the Largest Resource Bases in Western Canada P RIMARY COPPER PORPHYRY DEPOSITS | M&I RESOURCES ( CONTAINED C U E Q ) 1 20,000 - Development Projects 18,000 - Mines 16,000 14,000 Global M&I Resource (Mlbs CuEq) 12,000 10,000 8,000 6,000 4,000 2,000 0 Casino Huckleberry Gibraltar Kwanika Red Ch

  11. Slide 11: How does Berg compare on grade?

    How does Berg compare on grade? B ERG COMPARES FAVOURABLY WITH A WIDE RANGE OF PEERS BC Operating Mines BC Development Projects Selected Other Development Projects 0.80% 0.73% 0.73% 0.70% 0.69% M&I CuEq Grade Buildup (% CuEq) 0.70% 0.66% 0.60% 0.57% 0.55% 0.51% 0.51% 0.51% 0.50% 0.49% 0.48% 0.48% 0.

  12. Slide 12: How does Berg compare on contained metal?

    How does Berg compare on contained metal? B ERG IS WELL POSITIONED AMONG “ MEDIUM SIZED ” DEVELOPMENT PROJECTS AND LARGER THAN MOST OTHERS IN BC 0.80% - BC Mines AntaKori - BC Development Projects 0.70% Winu Red Chris (UG) - Other Development Projects Saddle (UG) Galore Creek 0.60% Red Chris (OP) Ne

  13. Slide 13: Selected Comparables

    Selected Comparables S INGLE - ASSET JUNIORS WITH LARGE - SCALE PORPHYRY DEVELOPMENT PROJECTS AND RECENT ECONOMIC STUDIES Study / LOM LOM After-Tax After-Tax NPV / Capex / lb Enterprise EV / EV / lb Project Location Mine Life Capex NPV2 Value3 Year CuEq1 IRR2 Capex CuEq NPV CuEq (US$ billions) (US$

  14. Slide 14: Re-rating Potential

    Re-rating Potential 4-5 X SHARE PRICE RETURN REQUIRED TO BRING S URGE IN LINE WITH PEER GROUP EV/CuEq Re-rating Potential1 EV/NPV Re-rating Potential2 Peer Group Surge Copper Peer Group Linear Regression - Ex Outliers Peer Group Surge Copper Peer Group Linear Regression - Ex Outliers $300 $300 $250

  15. Slide 15: Current Activities

    Current Activities R ECENTLY COMPLETED $7 M FUNDING PACKAGE FULLY FUNDS S URGE ’ S PFS TECHNICAL WORK PROGRAMS IN 2024-2025 ✓ Advancing Berg toward PFS ✓ Technical work programs in 2024-2025 include metallurgy, geotech, geochem, environmental baseline ✓ Advancing high priority exploration targets th

  16. Slide 16: Corporate Info

    Corporate Info 15

  17. Slide 17: Capitalization

    Capitalization A LL - EQUITY CAP STRUCTURE Equity Capitalization1 Key Announcements over Last Twelve Months Basic Shares Outstanding 289.2M $0.25 3.0 Market Cap $28.9M Berg met program kick off 2.5 Cash $3.0M $0.20 Seel CuAu Zone 108m Berg 412m @ 0.35% Commencement @ 0.24% CuEq Enterprise Value $25.

  18. Slide 18: Surge Team

    Surge Team C OMMITTED PROFESSIONALS WITH SIGNIFICANT EXPERIENCE IN OPERATIONS , EXPLORATION , AND FINANCE Management Team Board of Directors Leif Nilsson | Chief Executive Officer & Director Christian Kargl-Simard | Non-Exec Board Chair Metallurgical engineer, mining executive and former investment

  19. Slide 19: Ootsa Project

    7 COPPER CORP Ootsa Project

  20. Slide 20: Ootsa Project

    Ootsa Project T WO PORPHYRY COPPER DEPOSITS | T OTAL M&I R ESOURCES OF 439M T 1 Favourable Location – Low Elevation Central B.C. Interior • The deposits at Ootsa are favourably located adjacent to Imperial Metals’ Huckleberry Mine & Mill complex • The project area has gentle rolling topography, a mi

  21. Slide 21: Significant Increase in Resources

    Significant Increase in Resources I NCREASE OF 96% IN M&I RESOURCE 1 2022 Resource Update • Approximately 50,000 metres of drilling completed since 2018 at Seel has significantly expanded mineralization in key areas, relative to the prior 2016 resource estimate • New drilling helped support a 96% in

  22. Slide 22: Regional Exploration

    Regional Exploration 21

  23. Slide 23: District Scale Exploration Opportunity

    District Scale Exploration Opportunity L ARGE PIPELINE OF TARGETS IN ONE OF BC’ S MOST PROSPECTIVE COPPER DISTRICTS ✓Surge controls 141,699 hectare contiguous claim block ✓Dominant land position in ~50km strike length porphyry copper belt ✓Pipeline of regional prospects being 0.40% tested and advanc

  24. Slide 24: Berg Deposit Geological Model

    Berg Deposit Geological Model S IMPLIFIED GEOLOGICAL MODEL Plan View Cross Section 23

  25. Slide 25: Berg 2023 Exploration Program

    Berg 2023 Exploration Program M AJORITY FOCUS AT B ERG WITH SMALLER START UP ON PRIORITY TARGETS FROM 2022 Overview • 2023 program operated from July to early September − Completed three diamond core holes totalling 2,077 metres − Holes designed to test deeper portions of Berg deposit, potentially c

  26. Slide 26: Berg 2023 Exploration

    Berg 2023 Exploration T HREE CORE HOLES FOR 2077 M | T ARGETING DEEPER PORTIONS OF B ERG DEPOSIT ALONG PERIPHERY OF DEPOSIT Highlights • New Cu-in-soil anomaly outlined to the SW of Berg deposit − Similar size and magnitude as the Cu expression over Berg − Never identified historically and never dri

  27. Slide 27: 2022 Regional Reconnaissance Program

    2022 Regional Reconnaissance Program W IDESPREAD SURFACE EXPLORATION COMPLETED ACROSS COMBINED O OTSA & B ERG PROPERTIES Highlights • 23 IP lines in 5 grids • 4,481 soil samples and 337 rock samples plus extensive surface mapping • Selected results: − Expension of Bergette Cu-Mo-in-soil anomaly to 2

  28. Slide 28: New Cu-Au Porphyry Potential at Seel

    New Cu-Au Porphyry Potential at Seel NEW NEAR - SURFACE C U -A U TARGET JUST TO THE NORTH OF E AST S EEL Highlights • Holes S22-328 and 330 were drilled along the northern margins of the Seel Breccia East Zone (angled south) and encountered >100m intervals of South-North cross section through the ne

  29. Slide 29: New Silver Discovery at Blackjack

    New Silver Discovery at Blackjack V ERY LARGE AND HIGHLY ALTERED INTRUSTIVE CENTRE PROSPECTIVE FOR PM’ S AND WIDE OPEN FOR FURTHER DISCOVERY Highlights • Holes BJ22-01 was testing a large ZTEM anomaly and encountered a wide zone of Ag- Au-Pb-Zn mineralization in addition to 3 individual high- grade

  30. Slide 30: Bergette Porphyry Target

    Bergette Porphyry Target L ARGE - SCALE COPPER PORPHYRY TARGET APPROXIM ATELY 10 KM EAST OF THE B ERG DEPOSIT Highlights • Holes BTG22-01 (vertical) and 02 (angled to the northeast) were drilled from the same pad at Bergette, targeting updated geochemical, magnetic, and chargeability anomalies • Bot

  31. Slide 31: Contact Info

    www.surgecopper.com TSXV:SURG LinkedIn: Surge Copper Corp +1 604 718 5454 info@surgecopper.com OTCQB:SRGXF Frankfurt: G6D2 Twitter: @SurgeCopper Contact Info 30

  32. Slide 32: What is the opportunity in copper?

    What is the opportunity in copper? B IG M ARKET + S TRONG F UNDAMENTALS = A TTRACTIVE TO M AJORS Copper is the quintessential electric metal • Demand growth exposure to three “megatrends”: Renewables 1 Lower energy Urbanization, AI and infrastructure investment denisity  higher metal utilization 2

  33. Slide 33: Why BC?

    Why BC? T OP MINING JURISDICTION WITH THE RIGHT INGREDIENTS FOR AN ESG FOCUSED FUTURE • British Columbia is a top mining jurisdiction that is well positioned for an ESG focused future ✓Stable jurisdiction and fiscal regime ✓Clear and thorough environmental permitting process ✓Strong opportunities to

  34. Slide 34: Advancing a Canadian Critical Metals District

    Advancing a Canadian Critical Metals District T HREE BUCKETS OF VALUE CREATION POTENTIAL Berg Project Ootsa Project Regional Exploration • Successfully delivered a robust • The Ootsa project (Seel and Ox • Surge has made significant maiden PEA1 with base case porphyry deposits plus Seel Breccia inve

  35. Slide 35: First Nation Involvement

    First Nation Involvement S URGE ’ S EXPLORATION PROGRAMS AND WORK FORCE HAVE BENEFITED IMMENSELY FROM F IRST N ATION SUPPORT & PARTICIPATION Our Approach Cheslatta Carrier Nation members have been regularly employed at the Ootsa Project, providing exploration • Open communication and engagement rega

  36. Slide 36: Berg PEA Mine Plan

    Berg PEA Mine Plan S IMPLE , SIX - PHASE OPEN PIT PLAN USING OWNER OPERATED FLEET Overview Mine Plan Physicals • Conventional drill-blast-load-haul open pit 120 100 Mined Material (Mt) • Six engineered phases based on LG shells to ultimate pit 80 allows better access to high grade material and low g

  37. Slide 37: Berg Block Model Visualization

    Berg Block Model Visualization L ARGE CONTINUOUS MINERALIZED ZONES AND LOW STRIP RATIO 36

  38. Slide 38: Process Flowsheet

    Process Flowsheet C ONVENTIONAL SULPHIDE FLOTATION AND MOLYBDENUM SEPARATION FLOWSHEET Cu-Mo ROUGHER FLOTATION DUMP POCKET Cu-Mo REGRIND Cu-Mo CLEANER CYCLONE TAILINGS FLOTATION PRIMARY CRUSHER Cu CONCENTRATE OVERLAND THICKENER CONVEYOR Mo ROUGHER Cu-Mo SCAVENGER FLOTATION CONCENTRATE STOCKPILE Cu C

  39. Slide 39: Opex Buildup

    Opex Buildup T OTAL UNIT OPERATING COSTS OF C$13.26/ T MILLED Overview Operating Cost Esimates On-site Unit Operating Costs • Processing, mining, and G&A operating costs built up from first principles basis using recent benchmark data with Mining* C$/t mined $2.40 certain items having quoted and ava

  40. Slide 40: Capex Buildup

    Capex Buildup T OTAL PRE - PRODUCTION CAPEX OF C$2.0 BILLION Overview Capital Cost Esimates • Capital cost estimate developed by Ausenco based on EPCM Initial Capital (C$mm) approach to development Mine Pre-stripping $143 • Approach makes maximum use of in place infrastructure Mining Equipment Down

  41. Slide 41: Berg Mineral Resources (2023)

    Berg Mineral Resources (2023)1 P IT - CONSTRAINED USING C$8.50/ T NSR CUT - OFF Grade Gross Contained Metal C$8.50/t NSR Cut-off Tonnage NSR/t Cu Mo Ag Au Cu Mo Ag Au (Mt) (C$/t) (%) (%) (g/t) (g/t) (Mlbs) (Mlbs) (Moz) (koz) Supergene Measured 14 $43.03 0.39 0.03 5.6 0.04 120 8 3 18 Indicated 227 $3

  42. Slide 42: Ootsa Mineral Resources (2022)

    Ootsa Mineral Resources (2022)1 P IT - CONSTRAINED USING C$8.27/ T NSR CUT - OFF Grade Gross Contained Metal Tonnage Cu Mo Au Ag Cu Mo Au Ag (Mt) (%) (%) (g/t) (g/t) (Mlbs) (Mlbs) (Moz) (Moz) Seel Measured 103.7 0.19 0.014 0.15 2.6 440 32 0.5 8.7 Indicated 276.1 0.16 0.017 0.12 2.0 974 105 1.1 18.2

  43. Slide 43: End Notes

    End Notes ✦ All references to copper equivalent (“CuEq”) unless otherwise stated are on the basis of recovered or payable metals, as indicated, with such recovered or payable metals converted into copper equivalent based on their respective price ratios using long-term metal prices assumptions of US

Surge Copper — Investor Presentation (February 2025) on 6ix