Surge Copper Corp. · TSXV:SURG
Surge Copper — Investor Presentation (November 2026)
40 slides from Surge Copper's investor presentation, Nov 27, 2026

Slide 1: Advancing one of Canada's next major copper mines
0 Q4 2026 CORPORATE PRESENTATION Advancing one of Canada’s next major copper mines Berg Copper Project | British Columbia C$4.6B 24% 28 yrs A FTE R -TA X NP V 8 % A FTE R -TA X I RR MI NE L I FE TSXV: SURG | OTCQB: SRGXF | FRA: G6D2

Slide 2: Disclaimer
1 Disclaimer This presentation (“Presentation”) is being issued by Surge Copper Corp. (the “Company” or “Surge Copper”) for information purposes only. Cautionary Statements Concerning Forward-Looking Statements This Presentation contains "forward-looking information" within the meaning of applicable

Slide 3: Investment Highlights
2 INVESTMENT HIGHLIGHTS A large, long-life copper-molybdenum project in one of the world’s premier mining jurisdictions 01 The right metals Copper and molybdenum — both on Canada’s critical minerals list — plus silver and gold credits, with favourable long-term supply and demand dynamics 02 A premiu

Slide 4: C$4.6B after-tax NPV8%, 24% IRR and 2.9-year payback
3 PRE - FEASIBILITY STUDY C$4.6B after-tax NPV8%, 24% IRR and a 2.9-year payback at base case prices BASE CASE AFTER-TAX FREE CASH FLOW (C$M) BASE CASE JUNE 2026 SPOT $1,500 After-tax NPV8% C$4.6B C$9.4B C$735M average $1,000 (over C$6B in first-five years) After-tax IRR 24% 36% $500 After-tax payba

Slide 5: Production Profile
4 PRODUCTION PROFILE 140 kt of copper equivalent for 28 years, 189 kt in the first five RECOVERED CuEq (kt) ANNUAL Copper ANNUAL FIRST FIVE Mo, Ag, and Au as CuEq METAL LOM AVG. YEARS TOTAL LOM LOM Average: 140 kt 250 First Five Years: 189 kt Copper Equivalent 140 kt 189 kt 3.9 Mt 200 Copper 80 kt 1

Slide 6: By-product credits support negative C1 copper cash costs
5 METAL MIX Molybdenum, silver, and gold by-product credits support negative C1 copper cash costs SHARE OF PAYABLE METAL 4% Gold 9% C1 cash cost per lb payable copper, net of by- Silver US$(0.17) product credits Molybdenum 30% Copper C1 cash cost per lb payable copper, co-product US$1.95 basis C3 ca

Slide 7: Mineral Reserve and Resources
6 MINERAL RESERVE AND RESOURCES A 1.2 Bt reserve supports a 28-year mine life, with a further 1.2 Bt of resources for potential mine life extension Reserves 5.8 Blbs Cu 687 Mlbs Mo 160 Moz Ag 1.2 Bt 844 koz Au M&I Resources 6.5 Blbs Cu 791 Mlbs Mo 181 Moz Ag 1.4 Bt 963 koz Au Inf. Resources 3.6 Blbs

Slide 8: Project Design
7 PROJECT DESIGN One open pit, a conventional flowsheet, grid power and downhill conveyors keep the design simple Single, long-life open pit • Conventional drill, blast, load and haul in six phases • LOM strip ratio of 2.0 to 1 • No complex sequencing or block cave Concentrator • Downhill, electric

Slide 9: Price Sensitivity
8 PRICE SENSITIVITY Berg demonstrates significant leverage to higher copper prices and strong resiliency to variable molybdenum price environments AFTER-TAX NPV8% AND IRR BY COPPER PRICE MOLYBDENUM AT US$12/LB $10,000 NPV 40% (stress test) IRR $9,000 35% 35% $8,000 32% C$3,284M | 20% 30% $7,000 28%

Slide 10: Recent Investment Sanctioning Decisions
9 RECENT INVESTMENT SANCTIONING DECISIONS Producers are approving copper projects at 11–17% IRRs. Berg’s PFS outlines a 24% IRR, at similar capital intensity APPROVED NOVEMBER 2025 APPROVED OCTOBER 2026 APPROVED NOVEMBER 2026 PFS JUNE 2026 Eva Copper World Bagdad expansion Berg Harmony Gold – Queens

Slide 11: Scale in Context: Canadian porphyry copper resources
10 SCALE IN CONTEXT One of the largest porphyry copper resource bases in Canada… ALL CATEGORIES CONTAINED CUEQ (MLBS) 35,000 - Development Projects 30,000 - Mines 25,000 20,000 15,000 10,000 5,000 0 Schaft Creek Saddle Casino Gibraltar Kwanika Huckleberry Mountain Red Chris North Island Highland Val

Slide 12: Scale in Context: top-five copper mine and largest moly producer
11 SCALE IN CONTEXT …if developed, it would be a top-five copper mine in Canada and its largest molybdenum producer… 308 Canadian Moly Producers Selected Primary Moly Comparables 294 - By-products as CuEq 24 21 16 161 159 Copper Production (Mlbs) 13 13 280 Moly Production (Mlbs) 104 176 70 96 93 3 5

Slide 13: Global Significance: silver production
12 GLOBAL SIGNIFICANCE …among the top 15 silver producers of the world’s copper mines… 18 Operating Copper Mines 16 Berg PFS Life of Mine 14 Berg PFS First 5 Years Annual Silver Production (Moz Ag) 12 10 8 6 4 2 0 Notes: Ranking based on operating primary copper mines with 2025 silver production exc

Slide 14: Global Significance: molybdenum production
13 GLOBAL SIGNIFICANCE …and a top 10 producer of moly globally 40 Global Moly Producers 35 Berg PFS Life of Mine Annual Molybdenum Production (Mlbs Mo) Berg PFS First 5 Years 30 25 20 15 10 5 0 Notes: Ranking based on mines with 2025 moly production exceeding 1 kt Mo. Berg first 5 years and life-of-

Slide 15: Valuation in Context
14 VALUATION IN CONTEXT Surge trades at 0.03x EV / NPV – a fraction of the 0.10x peer median Enterprise Company and Project Location Study / Year Cu Price Discount Rate Currency After-Tax NPV EV / NPV Value (C$M) Surge Copper, Berg BC, Canada PFS / 2026 US$4.75 8% CAD $4,592.0 M $119 M 0.03 x Berg a

Slide 16: Policy Momentum
15 POLICY MOMENTUM Canada and BC are prioritizing critical-minerals development and accelerating major projects Federal Policy Momentum • Major Projects Office advancing a more coordinated, streamlined approach to project approvals • Budget 2026 reinforces critical-minerals investment, project finan

Slide 17: Property
16 PROPERTY A clean, 100%-owned, district-scale package in an established copper camp with significant discovery and development optionality 1 Clean, 100% ownership The only major encumbrance on 141,699 ha is a 1% NSR on Berg, held by Royal Gold. No streams, minority interests, or spending obligatio

Slide 18: First Nations Engagement
17 FIRST NATIONS ENGAGEMENT Working with the Wet’suwet’en and Cheslatta Carrier Nations as Berg enters environmental assessment • Territory: Berg is located within the Wet’suwet’en Yintah (traditional territory) and the asserted traditional territory of the Cheslatta Carrier Nation. • Engagement: Su

Slide 19: The Path Ahead
18 THE PATH AHEAD The next few years: three parallel workstreams building towards FID 01 02 03 Advance to feasibility Assessment, permits & Commercial envelope Data acquisition and engineering Financing, offtake, and strategy design First Nations TOGETHER, THESE BUILD TOWARDS The main timeline drive

Slide 20: Capital Structure
19 CAPITAL STRUCTURE No debt, C$13.3M of cash at September 30, strategic investor African Rainbow Minerals holds 19.9% $1.00 14.0 Basic Shares Outstanding 391.2M Market Cap $117.4M $0.90 12.0 Cash $13.3M $0.80 Enterprise Value $104.1M 10.0 $0.70 Warrants, Options, RSUs & DSUs 71.6M $0.60 8.0 Volume

Slide 21: Thank you
20 Thank you Surge Copper Corp. 888 – 700 West Georgia Street, Vancouver, BC V7Y 1G5 +1 604 718 5454 | info@surgecopper.com www.surgecopper.com TSXV: SURG | OTCQB: SRGXF | FRA: G6D2 LinkedIn: Surge Copper Corp | X: @SurgeCopper Technical Appendix Follows

Slide 22: Our Strategic Partner: African Rainbow Minerals
21 OUR STRATEGIC PARTNER African Rainbow Minerals: an operator of large mines, with Surge as its only copper investment A diversified South African miner, JSE-listed since 2003 – FY2026 production (100% basis) IMPACT FOR SURGE 19.9% COMMODITY OPERATIONS AND PARTERS FY2026 Iron ore Khumani, Beeshoek

Slide 23: Leadership
22 LEADERSHIP A team with development, permitting, finance, and M&A depth Management Team Board of Directors Leif Nilsson | Chief Executive Officer & Director Christian Kargl-Simard | Non-Exec Board Chair Experienced mining executive and former investment banker. Currently serves as President and CE

Slide 24: Ootsa Project
23 OOTSA PROJECT Ootsa adds two more porphyry deposits with 576 Mt of all category resources close to an idled mill Looking NW Berg Deposit M&I: 1,413 Mt @ 0.21% Cu, 0.025% Mo, 4.0 g/t Ag, 0.02 g/t Au Inf: 1,004 Mt @ 0.16% Cu, 0.027% Mo, 4.3 g/t Ag, 0.01 g/t Au Huckleberry Mine & Mill Complex - 20kt

Slide 25: Berg PFS Highlights
24 BERG PFS HIGHLIGHTS Robust base case economics with long-life low-cost production C$4.6B Base Case After-Tax NPV8% 8.6Blbs Life-of-Mine CuEq1 Production 28 Year Mine Life 24% Base Case After-Tax IRR 308Mlbs Annual CuEq Production C$735m Life-of-Mine Avg. Annual After-Tax FCF Reserves & Resources

Slide 26: Grade Comparison
25 GRADE COMPARISON Berg’s CuEq grade compares favourably to a wide range of global projects BC Development BC Operating Mines Selected Other Development Projects Projects 1.00% 0.92% M&I CuEq Grade Buildup (% CuEq) 0.90% 0.85% 0.79% 0.80% 0.70% 0.68% 0.61% 0.57% 0.58% 0.60% 0.53% 0.52% 0.52% 0.52%

Slide 27: Grade-Tonnage Curves
26 GRADE – TONNAGE CURVES The Berg-Ootsa district contains 16 Blbs CuEq in M&I and 25 Blbs in all categories 1.00% AntaKori Filo del Sol - BC Mines - BC Development Projects Winu 0.80% Galore Creek - Other Development Projects Red Chris (OP) New Prosperity 0.60% Mount Polley Saddle (OP) Costa Fuego

Slide 28: Metal Price Sensitivity
27 METAL PRICE SENSITIVITY Berg PFS economics are robust under a wide range of long-term commodity price assumptions After-Tax NPV8% (C$mm) After-Tax IRR (%) - Base case Copper Price (US$/lb) Copper Price (US$/lb) - Moly stress test - Spot range $1.90 $2.85 $3.80 $4.75 $5.70 $6.65 $7.60 $1.90 $2.85

Slide 29: Peer Group Comparison
28 PEER GROUP COMPARISON Porphyry peers with recent economic studies After- LOM Enterprise Study / Mine LOM Tax After- NPV / Capex / EV / EV / lb Project Location Capex Value3 Year Life CuEq1 (US$ NPV2 Tax IRR2 Capex lb CuEq NPV CuEq (US$ (US$ millions) billions) billions) Opemiska PEA / 2025 Quebec

Slide 30: Benchmarking
29 BENCHMARKING Benchmarking: peers with large open pit projects and recent studies LOM CUEQ (BLBS) NPV8% AT $4.75 CU (US$B) EV (US$M) EV / NPV Western 11.8 Solaris $5.1 Solaris $1,084 Faraday 0.45 x Aldebaran 10.6 Los Andes $5.0 Faraday $726 Northisle 0.22 x Los Andes 10.2 Western $3.6 Northisle $5

Slide 31: Copper Market
30 COPPER MARKET A ~28 Mt, >US$300B market today, with grids, EVs and data centres driving most of the visible growth USE IN 2025 (MT CU) · ~28 MT CHANGE TO 2040 (MT CU) · +14 MT Construction Machinery & other 7.5 +2.2 ~60% 6.8 +2.3 of growth comes from the electrification uses Grid (T&D) 4.3 +2.8 s

Slide 32: Molybdenum Market
31 MOLYBDENUM MARKET Molybdenum is a deep, >US$20B industrial market used across energy, infrastructure and manufacturing FIRST USE OF MOLYBDENUM (2025) WHERE IT ENDS UP ~670 Mlbs global demand in 2025 (~300 kt) Engineering steels 38% Oil & gas Refining Well casing, line pipe, LNG Desulphurisation c

Slide 33: Why British Columbia
32 WHY BRITISH COLUMBIA BC pairs a world-class copper endowment with clean power, Pacific access and a mandate to build “Advance reconciliation and economic “Make B.C. the fastest place in North America to permit a mine … with partnerships with First Nations.” clear standards and dependable timeline

Slide 34: Mine Plan
33 MINE PLAN Simple, six-phase open pit plan using owner operated fleet Overview Mine Plan Physicals 250 • Conventional drill-blast-load-haul open pit 200 Mined Material (Mt) • Six engineered phases based on LG shells to ultimate pit 150 allows better access to high grade material and low grade 100

Slide 35: Process Flowsheet
34 PROCESS FLOWSHEET A conventional, three-line 120 kt/d concentrator using proven equipment and producing high-quality concentrates 120 kt/d 3 × 40 kt/d 6 × 20 MW nominal throughput (43.8 Mt/a) SAG / ball mill lines SAG and ball mills Designed for phasing optionality Three identical lines allow sta

Slide 36: Operating Costs
35 OPERATING COSTS Total unit opex of C$17.84/t milled Overview Operating Cost Esimate On-site Unit Operating Costs • Processing, mining, and G&A operating costs built up from first principles basis using recent benchmark data with Mining C$/t mined $2.51 certain items having quoted and available un

Slide 37: Initial Capital
36 INITIAL CAPITAL C$4.7B initial capital, including C$574M of contingency Overview Capital Cost Esimate • Capital cost estimate developed by Ausenco and Moose Mountain Initial Capital (C$mm) based on EPCM approach to development Mine • Approach makes maximum use of in place infrastructure including

Slide 38: Berg Mineral Resources and Reserves (2026)
37 P IT - CONSTRAINED USING C$8.00/ T ( RESOURCES ) AND C$9.25/ T ( RESERVES ) NSR CUT - OFFS Berg Mineral Resources and Reserves (2026)1 Grade Gross Contained Metal Mineral Resources (C$8.00/t NSR cut-off) Tonnage NSR/t Cu Mo Ag Au Cu Mo Ag Au (Mt) (C$/t) (%) (%) (g/t) (g/t) (Mlbs) (Mlbs) (Moz) (ko

Slide 39: Ootsa Mineral Resources (2022)
38 P IT - CONSTRAINED USING C$8.27/ T NSR CUT - OFF Ootsa Mineral Resources (2022)1 Grade Gross Contained Metal Tonnage Cu Mo Au Ag Cu Mo Au Ag (Mt) (%) (%) (g/t) (g/t) (Mlbs) (Mlbs) (Moz) (Moz) Seel Measured 103.7 0.19 0.014 0.15 2.6 440 32 0.5 8.7 Indicated 276.1 0.16 0.017 0.12 2.0 974 105 1.1 18

Slide 40: End Notes
39 End Notes ✦ All references to copper equivalent (“CuEq”) unless otherwise stated are on the basis of recovered or payable metals, as indicated, with such recovered or payable metals converted into copper equivalent based on their respective price ratios using long-term metal prices assumptions of
Source: company website
More decks from Surge Copper Corp.
Investor Presentation (November 2026)42 slides · Nov 24, 2026
Investor Presentation (November 2026)51 slides · Nov 7, 2026
Investor Presentation (June 2026)52 slides · June 2026
Investor Presentation (January 2026)51 slides · Jan 5, 2026
Investor Presentation (January 2026)51 slides · January 2026
Investor Presentation (2026)51 slides · 2026