Surge Copper Corp. · TSXV:SURG

Surge Copper — Investor Presentation (November 2026)

42 slides from Surge Copper's investor presentation, Nov 24, 2026

  1. Slide 1: Advancing one of Canada's next major copper mines

    Slide 1: Advancing one of Canada's next major copper mines

    0 Q4 2026 CORPORATE PRESENTATION Advancing one of Canada’s next major copper mines Berg Copper Project | British Columbia C$4.6B 24% 28 yrs A FTE R -TA X NP V 8 % A FTE R -TA X I RR MI NE L I FE TSXV: SURG | OTCQB: SRGXF | FRA: G6D2

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    1 Disclaimer This presentation (“Presentation”) is being issued by Surge Copper Corp. (the “Company” or “Surge Copper”) for information purposes only. Cautionary Statements Concerning Forward-Looking Statements This Presentation contains "forward-looking information" within the meaning of applicable

  3. Slide 3: Investment Highlights

    Slide 3: Investment Highlights

    2 INVESTMENT HIGHLIGHTS A large, long-life copper-molybdenum project in one of the world’s premier mining jurisdictions 01 The right metals Copper and molybdenum — both on Canada’s critical minerals list — plus silver and gold credits, with favourable long-term supply and demand dynamics 02 A premiu

  4. Slide 4: C$4.6B after-tax NPV8%, 24% IRR and 2.9-year payback

    Slide 4: C$4.6B after-tax NPV8%, 24% IRR and 2.9-year payback

    3 PRE - FEASIBILITY STUDY C$4.6B after-tax NPV8%, 24% IRR and a 2.9-year payback at base case prices BASE CASE AFTER-TAX FREE CASH FLOW (C$M) BASE CASE JUNE 2026 SPOT $1,500 After-tax NPV8% C$4.6B C$9.4B C$735M average $1,000 (over C$6B in first-five years) After-tax IRR 24% 36% $500 After-tax payba

  5. Slide 5: Production Profile

    Slide 5: Production Profile

    4 PRODUCTION PROFILE 140 kt of copper equivalent for 28 years, 189 kt in the first five RECOVERED CuEq (kt) ANNUAL Copper ANNUAL FIRST FIVE Mo, Ag, and Au as CuEq METAL LOM AVG. YEARS TOTAL LOM LOM Average: 140 kt 250 First Five Years: 189 kt Copper Equivalent 140 kt 189 kt 3.9 Mt 200 Copper 80 kt 1

  6. Slide 6: By-product credits support negative C1 copper cash costs

    Slide 6: By-product credits support negative C1 copper cash costs

    5 METAL MIX Molybdenum, silver, and gold by-product credits support negative C1 copper cash costs SHARE OF PAYABLE METAL 4% Gold 9% C1 cash cost per lb payable copper, net of by- Silver US$(0.17) product credits Molybdenum 30% Copper C1 cash cost per lb payable copper, co-product US$1.95 basis C3 ca

  7. Slide 7: Mineral Reserve and Resources

    Slide 7: Mineral Reserve and Resources

    6 MINERAL RESERVE AND RESOURCES A 1.2 Bt reserve supports a 28-year mine life, with a further 1.2 Bt of resources for potential mine life extension Reserves 5.8 Blbs Cu 687 Mlbs Mo 160 Moz Ag 1.2 Bt 844 koz Au M&I Resources 6.5 Blbs Cu 791 Mlbs Mo 181 Moz Ag 1.4 Bt 963 koz Au Inf. Resources 3.6 Blbs

  8. Slide 8: Project Design

    Slide 8: Project Design

    7 PROJECT DESIGN One open pit, a conventional flowsheet, grid power and downhill conveyors keep the design simple Single, long-life open pit • Conventional drill, blast, load and haul in six phases • LOM strip ratio of 2.0 to 1 • No complex sequencing or block cave Concentrator • Downhill, electric

  9. Slide 9: Price Sensitivity

    Slide 9: Price Sensitivity

    8 PRICE SENSITIVITY Berg demonstrates significant leverage to higher copper prices and strong resiliency to variable molybdenum price environments AFTER-TAX NPV8% AND IRR BY COPPER PRICE MOLYBDENUM AT US$12/LB $10,000 NPV 40% (stress test) IRR $9,000 35% 35% $8,000 32% C$3,284M | 20% 30% $7,000 28%

  10. Slide 10: Recent Investment Sanctioning Decisions

    Slide 10: Recent Investment Sanctioning Decisions

    9 RECENT INVESTMENT SANCTIONING DECISIONS Producers are approving copper projects at 11–17% IRRs. Berg’s PFS outlines a 24% IRR, at similar capital intensity APPROVED NOVEMBER 2025 APPROVED OCTOBER 2026 APPROVED NOVEMBER 2026 PFS JUNE 2026 Eva Copper World Bagdad expansion Berg Harmony Gold – Queens

  11. Slide 11: Scale in Context: Canadian porphyry copper resources

    Slide 11: Scale in Context: Canadian porphyry copper resources

    10 SCALE IN CONTEXT One of the largest porphyry copper resource bases in Canada… ALL CATEGORIES CONTAINED CUEQ (MLBS) 35,000 - Development Projects 30,000 - Mines 25,000 20,000 15,000 10,000 5,000 0 Schaft Creek Saddle Casino Gibraltar Kwanika Huckleberry Mountain Red Chris North Island Highland Val

  12. Slide 12: Scale in Context: top-five copper mine, largest moly producer

    Slide 12: Scale in Context: top-five copper mine, largest moly producer

    11 SCALE IN CONTEXT …if developed, it would be a top-five copper mine in Canada and its largest molybdenum producer… 308 Canadian Moly Producers Selected Primary Moly Comparables 294 - By-products as CuEq 24 21 16 161 159 Copper Production (Mlbs) 13 13 280 Moly Production (Mlbs) 104 176 70 96 93 3 5

  13. Slide 13: Global Significance: silver production

    Slide 13: Global Significance: silver production

    12 GLOBAL SIGNIFICANCE …among the top 15 silver producers of the world’s copper mines… 18 Operating Copper Mines 16 Berg PFS Life of Mine 14 Berg PFS First 5 Years Annual Silver Production (Moz Ag) 12 10 8 6 4 2 0 Notes: Ranking based on operating primary copper mines with 2025 silver production exc

  14. Slide 14: Global Significance: molybdenum production

    Slide 14: Global Significance: molybdenum production

    13 GLOBAL SIGNIFICANCE …and a top 10 producer of moly globally 40 Global Moly Producers 35 Berg PFS Life of Mine Annual Molybdenum Production (Mlbs Mo) Berg PFS First 5 Years 30 25 20 15 10 5 0 Notes: Ranking based on mines with 2025 moly production exceeding 1 kt Mo. Berg first 5 years and life-of-

  15. Slide 15: Valuation in Context: EV / NPV

    Slide 15: Valuation in Context: EV / NPV

    14 VALUATION IN CONTEXT Surge trades at 0.03x EV / NPV – a fraction of the 0.10x peer median Enterprise Company and Project Location Study / Year Cu Price Discount Rate Currency After-Tax NPV EV / NPV Value (C$M) Surge Copper, Berg BC, Canada PFS / 2026 US$4.75 8% CAD $4,592.0 M $119 M 0.03 x Berg a

  16. Slide 16: Policy Momentum

    Slide 16: Policy Momentum

    15 POLICY MOMENTUM Canada and BC are prioritizing critical-minerals development and accelerating major projects Federal Policy Momentum • Major Projects Office advancing a more coordinated, streamlined approach to project approvals • Budget 2026 reinforces critical-minerals investment, project finan

  17. Slide 17: Property: clean, 100%-owned, district-scale package

    Slide 17: Property: clean, 100%-owned, district-scale package

    16 PROPERTY A clean, 100%-owned, district-scale package in an established copper camp with significant discovery and development optionality 1 Clean, 100% ownership The only major encumbrance on 141,699 ha is a 1% NSR on Berg, held by Royal Gold. No streams, minority interests, or spending obligatio

  18. Slide 18: First Nations Engagement

    Slide 18: First Nations Engagement

    17 FIRST NATIONS ENGAGEMENT Working with the Wet’suwet’en and Cheslatta Carrier Nations as Berg enters environmental assessment • Territory: Berg is located within the Wet’suwet’en Yintah (traditional territory) and the asserted traditional territory of the Cheslatta Carrier Nation. • Engagement: Su

  19. Slide 19: The Path Ahead

    Slide 19: The Path Ahead

    18 THE PATH AHEAD The next few years: three main workstreams building towards FID 01 02 03 Advance to feasibility Assessment, permits & Commercial envelope Data acquisition and engineering Financing, offtake, and strategy design First Nations TOGETHER, THESE BUILD TOWARDS The main timeline driver: 3

  20. Slide 20: Capital Structure

    Slide 20: Capital Structure

    19 CAPITAL STRUCTURE No debt, C$13.3M of cash at September 30, strategic investor African Rainbow Minerals holds 19.9% $1.00 14.0 Basic Shares Outstanding 391.2M Market Cap $117.4M $0.90 12.0 Cash $13.3M $0.80 Enterprise Value $104.1M 10.0 $0.70 Warrants, Options, RSUs & DSUs 71.6M $0.60 8.0 Volume

  21. Slide 21: Thank you

    Slide 21: Thank you

    20 Thank you Surge Copper Corp. 888 – 700 West Georgia Street, Vancouver, BC V7Y 1G5 +1 604 718 5454 | info@surgecopper.com www.surgecopper.com TSXV: SURG | OTCQB: SRGXF | FRA: G6D2 LinkedIn: Surge Copper Corp | X: @SurgeCopper

  22. Slide 22: Our Strategic Partner: African Rainbow Minerals

    Slide 22: Our Strategic Partner: African Rainbow Minerals

    21 OUR STRATEGIC PARTNER African Rainbow Minerals: an operator of large mines, with Surge as its only copper investment A diversified South African miner, JSE-listed since 2003 – FY2026 production (100% basis) IMPACT FOR SURGE 19.9% COMMODITY OPERATIONS AND PARTERS FY2026 Iron ore Khumani, Beeshoek

  23. Slide 23: Leadership

    Slide 23: Leadership

    22 LEADERSHIP A team with development, permitting, finance, and M&A depth Management Team Board of Directors Leif Nilsson | Chief Executive Officer & Director Christian Kargl-Simard | Non-Exec Board Chair Experienced mining executive and former investment banker. Currently serves as President and CE

  24. Slide 24: Ootsa Project

    Slide 24: Ootsa Project

    23 OOTSA PROJECT Ootsa adds two more porphyry deposits with 576 Mt of all category resources close to an idled mill Looking NW Berg Deposit M&I: 1,413 Mt @ 0.21% Cu, 0.025% Mo, 4.0 g/t Ag, 0.02 g/t Au Inf: 1,004 Mt @ 0.16% Cu, 0.027% Mo, 4.3 g/t Ag, 0.01 g/t Au Huckleberry Mine & Mill Complex - 20kt

  25. Slide 25: Berg PFS Highlights

    Slide 25: Berg PFS Highlights

    24 BERG PFS HIGHLIGHTS Robust base case economics with long-life low-cost production C$4.6B Base Case After-Tax NPV8% 8.6Blbs Life-of-Mine CuEq1 Production 28 Year Mine Life 24% Base Case After-Tax IRR 308Mlbs Annual CuEq Production C$735m Life-of-Mine Avg. Annual After-Tax FCF Reserves & Resources

  26. Slide 26: Grade Comparison

    Slide 26: Grade Comparison

    25 GRADE COMPARISON Berg’s CuEq grade compares favourably to a wide range of global projects BC Development BC Operating Mines Selected Other Development Projects Projects 1.00% 0.92% M&I CuEq Grade Buildup (% CuEq) 0.90% 0.85% 0.79% 0.80% 0.70% 0.68% 0.61% 0.57% 0.58% 0.60% 0.53% 0.52% 0.52% 0.52%

  27. Slide 27: Grade-Tonnage Curves

    Slide 27: Grade-Tonnage Curves

    26 GRADE – TONNAGE CURVES The Berg-Ootsa district contains 16 Blbs CuEq in M&I and 25 Blbs in all categories 1.00% AntaKori Filo del Sol - BC Mines - BC Development Projects Winu 0.80% Galore Creek - Other Development Projects Red Chris (OP) New Prosperity 0.60% Mount Polley Saddle (OP) Costa Fuego

  28. Slide 28: Metal Price Sensitivity

    Slide 28: Metal Price Sensitivity

    27 METAL PRICE SENSITIVITY Berg PFS economics are robust under a wide range of long-term commodity price assumptions After-Tax NPV8% (C$mm) After-Tax IRR (%) - Base case Copper Price (US$/lb) Copper Price (US$/lb) - Moly stress test - Spot range $1.90 $2.85 $3.80 $4.75 $5.70 $6.65 $7.60 $1.90 $2.85

  29. Slide 29: Peer Group Comparison

    Slide 29: Peer Group Comparison

    28 PEER GROUP COMPARISON Porphyry peers with recent economic studies After- LOM Enterprise Study / Mine LOM Tax After- NPV / Capex / EV / EV / lb Project Location Capex Value3 Year Life CuEq1 (US$ NPV2 Tax IRR2 Capex lb CuEq NPV CuEq (US$ (US$ millions) billions) billions) Opemiska PEA / 2025 Quebec

  30. Slide 30: Benchmarking: peers with large open pit projects

    Slide 30: Benchmarking: peers with large open pit projects

    29 BENCHMARKING Benchmarking: peers with large open pit projects and recent studies LOM CUEQ (BLBS) NPV8% AT $4.75 CU (US$B) EV (US$M) EV / NPV Western 11.8 Solaris $5.1 Solaris $1,084 Faraday 0.45 x Aldebaran 10.6 Los Andes $5.0 Faraday $726 Northisle 0.22 x Los Andes 10.2 Western $3.6 Northisle $5

  31. Slide 31: What is the opportunity in copper?

    Slide 31: What is the opportunity in copper?

    30 B IG M ARKET + S TRONG F UNDAMENTALS = A TTRACTIVE TO M AJORS What is the opportunity in copper? • Copper is the quintessential electric metal • Demand growth exposure to three “megatrends”: Renewables Lower energy 1 Urbanization, AI and infrastructure investment denisity  higher metal utilizati

  32. Slide 32: Why BC?

    Slide 32: Why BC?

    31 T OP MINING JURISDICTION WITH THE RIGHT INGREDIENTS FOR AN ESG FOCUSED FUTURE Why BC? • British Columbia is a top mining jurisdiction that is well positioned for an ESG focused future ✓Stable jurisdiction and fiscal regime ✓Clear and thorough environmental permitting process experienced with majo

  33. Slide 33: Mine Plan

    Slide 33: Mine Plan

    32 MINE PLAN Simple, six-phase open pit plan using owner operated fleet Overview Mine Plan Physicals 250 • Conventional drill-blast-load-haul open pit 200 Mined Material (Mt) • Six engineered phases based on LG shells to ultimate pit 150 allows better access to high grade material and low grade 100

  34. Slide 34: Process Flowsheet

    Slide 34: Process Flowsheet

    33 PROCESS FLOWSHEET Conventional sulphide flotation and molybdenum separation

  35. Slide 35: Operating Costs

    Slide 35: Operating Costs

    34 OPERATING COSTS Total unit opex of C$17.84/t milled Overview Operating Cost Esimate On-site Unit Operating Costs • Processing, mining, and G&A operating costs built up from first principles basis using recent benchmark data with Mining C$/t mined $2.51 certain items having quoted and available un

  36. Slide 36: Initial Capital

    Slide 36: Initial Capital

    35 INITIAL CAPITAL C$4.7B initial capital, including C$574M of contingency Overview Capital Cost Esimate • Capital cost estimate developed by Ausenco and Moose Mountain Initial Capital (C$mm) based on EPCM approach to development Mine • Approach makes maximum use of in place infrastructure including

  37. Slide 37: Opex & Capex Benchmarking: Recent Studies

    Slide 37: Opex & Capex Benchmarking: Recent Studies

    36 S ELECTED LARGE THROUGHPUT PROJECTS WITH PFS/FS STUDIES 2025 TO PRESENT Opex & Capex Benchmarking: Recent Studies Surge FQM Solaris AZ Sonoran Taseko Canada Ni Berg Taca Taca Warintza Cactus Yellowhead Crawford PFS FS PFS PFS PFS FEED Jun-26 Feb-26 Nov-25 Oct-25 Jul-25 Mar-25 Throughput Mtpa 44 6

  38. Slide 38: Advancing a Canadian Critical Metals District

    Slide 38: Advancing a Canadian Critical Metals District

    37 THREE BUCKETS OF VALUE Advancing a Canadian Critical Metals District Berg Project Regional Exploration Ootsa Project • Successfully delivered a robust Pre- • Surge has made significant • The Ootsa project (Seel and Ox Feasibility Study1 with base case investments in recent years to porphyry depos

  39. Slide 39: Berg Mineral Resources (2026)

    Slide 39: Berg Mineral Resources (2026)

    38 P IT - CONSTRAINED USING C$8.00/ T NSR CUT - OFF Berg Mineral Resources (2026)1 Grade Gross Contained Metal C$8.00/t NSR Cut-off Tonnage NSR/t Cu Mo Ag Au Cu Mo Ag Au (Mt) (C$/t) (%) (%) (g/t) (g/t) (Mlbs) (Mlbs) (Moz) (koz) Supergene Measured 10 $61.75 0.44 0.025 4.6 0.04 94 5 1 12 Indicated 162

  40. Slide 40: Berg Mineral Reserves (2026)

    Slide 40: Berg Mineral Reserves (2026)

    39 P IT - CONSTRAINED USING C$9.25/ T NSR CUT - OFF Berg Mineral Reserves (2026)1 Grade Gross Contained Metal Tonnage Cu Mo Ag Au Cu Mo Ag Au (Mt) (%) (%) (g/t) (g/t) (Mlbs) (Mlbs) (Moz) (koz) Reserve Class Proven 35 0.30 0.033 4.8 0.03 231 25 5 34 Probable 1,174 0.21 0.026 4.1 0.02 5,565 662 154 81

  41. Slide 41: Ootsa Mineral Resources (2022)

    Slide 41: Ootsa Mineral Resources (2022)

    40 P IT - CONSTRAINED USING C$8.27/ T NSR CUT - OFF Ootsa Mineral Resources (2022)1 Grade Gross Contained Metal Tonnage Cu Mo Au Ag Cu Mo Au Ag (Mt) (%) (%) (g/t) (g/t) (Mlbs) (Mlbs) (Moz) (Moz) Seel Measured 103.7 0.19 0.014 0.15 2.6 440 32 0.5 8.7 Indicated 276.1 0.16 0.017 0.12 2.0 974 105 1.1 18

  42. Slide 42: End Notes

    Slide 42: End Notes

    41 End Notes ✦ All references to copper equivalent (“CuEq”) unless otherwise stated are on the basis of recovered or payable metals, as indicated, with such recovered or payable metals converted into copper equivalent based on their respective price ratios using long-term metal prices assumptions of

Source: company website