Tasman Resources Ltd · ASX:TAS

Tasman Resources — Tasman Resources NL — Investor Presentation (May 2004)

20 slides from Tasman Resources's investor presentation, May 2004

  1. Slide 1: Finding major Cu-Au resources in the Olympic Province

    Slide 1: Finding major Cu-Au resources in the Olympic Province

    Tasman Resources NL Finding major Cu-Au resources in the Olympic Province Presentation by: Greg Solomon, LLB Executive Chairman May 2004

  2. Slide 2: SA Copper Occurrences and Project Location

    Slide 2: SA Copper Occurrences and Project Location

    Tasman Resources NL SA Copper Occurrences and Project Location •South Australia is richly endowed with copper mineralisation, mostly sub-economic occurrences and small mines in the Neoproterozoic (yellow dots); by far the most important deposits are the iron oxide copper gold systems (shown as red d

  3. Slide 3: Project Area and Regional Magnetics

    Slide 3: Project Area and Regional Magnetics

    Tasman Resources NL Project Area and Regional Magnetics •Regional magnetic image (1VD TMI) of the northern Olympic Province, showing Tasman’s Lake Torrens Project tenement area and deposits. •The principal iron oxide copper gold (IOCG) deposits in the region: Olympic Dam, Prominent Hill, Acropolis a

  4. Slide 4: Project Area and Regional Gravity

    Slide 4: Project Area and Regional Gravity

    Tasman Resources NL Project Area and Regional Gravity •Regional gravity image of the northern Olympic Province , showing Tasman’s Lake Torrens Project tenement area and deposits. •The principal iron oxide copper gold (IOCG) deposits in the region: Olympic Dam, Prominent Hill, Acropolis and Wirrda We

  5. Slide 5: Exploration Target Models

    Slide 5: Exploration Target Models

    Tasman Resources NL Exploration Target Models Cambrian carbonates MVT Zn/Pb/Ag/Cu sulphides or silicates Neoproterozoic sediments Stratiform Cu/Co (“Zambian-style”) deposits Sediment hosted (“Mt Gunson-style”) deposits Meso- and Palaeoproterozoic basement Fe–oxide Cu/Au deposits, and higher level eq

  6. Slide 6: Current Technical Advisors

    Slide 6: Current Technical Advisors

    Tasman Resources NL Current Technical Advisors Tasman Resources Graham Jeffress Consulting Geologists: Robert Smith David Edgecombe Consulting Geophysicists: Dr. James Hanneson, Adelaide Mining Geophysics Dr. Jayson Meyers, Resource Potentials William Robertson, Value Adding Geophysics John Bishop,

  7. Slide 7: Titan - May 2004

    Slide 7: Titan - May 2004

    Tasman Resources NL Titan - May 2004 • Small portion tested by 5 diamond drillholes • BD 1: 334m @ 0.1% Cu (1976) • TI 6: 47m @ 0.3% Cu (2003) • Robust vectors to higher grades • Strong mag-hem-seri-chl-sulphide alteration • Geophysics: gravity – key technique electrical - strong basement conductors

  8. Slide 8: Titan Prospect

    Slide 8: Titan Prospect

    Tasman Resources NL Titan Prospect TI3 TI4 TI2 TI6 BD1 Panoramic View over part of the Titan Prospect Looking southeast over the drill section, with approximate hole positions shown

  9. Slide 9: Greater Titan Map

    Slide 9: Greater Titan Map

    Tasman Resources NL Greater Titan Map •Interpreted structures in Greater Titan area and Zeus, overlain on first vertical derivative of the Bouguer gravity (2.00g/cc) •Existing drill holes and EM lines (CSAMT and AMT) shown •Note small portion of anomalies actually tested by drilling

  10. Slide 10: Schematic Summary of Fe-Oxide & Metal Zoning Patterns

    Slide 10: Schematic Summary of Fe-Oxide & Metal Zoning Patterns

    Tasman Resources NL Schematic Summary of Fe-Oxide & Metal Zoning Patterns Olympic Dam Prominent Hill Titan Schematic Summary of Fe-Oxide and Metal Zoning Patterns At Titan, a key component of the exploration strategy for high grade mineralisation is the use of mineralogical and chemical zonation pat

  11. Slide 11: TI6 and TI2 core

    Slide 11: TI6 and TI2 core

    Tasman Resources NL TI6 TI2 TI6 core : 620.5m depth Magnetite-sulphide breccia (vein); pyrite, chalcopyrite 1.8% Cu and 0.3ppm Au (for 620-621m interval) TI2 core: 744.7m depth Haematite altered metarentite clasts in haematite matrix supported breccia

  12. Slide 12: Titan Prospect Summary and Exploration Persistence

    Slide 12: Titan Prospect Summary and Exploration Persistence

    Tasman Resources NL Titan •Titan Prospect Summary, showing drill holes, geophysical lines and drill section location superimposed on residual gravity image (128pass hanning). Exploration Persistence At Olympic Dam, despite encouraging grades in earlier holes it was not until the 16th hole that econo

  13. Slide 13: Titan AMT Line 2 - Resistivity Inversion

    Slide 13: Titan AMT Line 2 - Resistivity Inversion

    Tasman Resources NL Titan AMT Line 2 - Resistivity Inversion BD1 TI2 TI6 TI7 TI3 AMT Inversion for Line 2 Scalar AMT data 1D smooth model inversion ExHy •The inversion clearly shows the horizontal stratigraphy of the Neoproterozoic cover sequence above the basement unconformity at 600m depth. The st

  14. Slide 14: Titan Line 4 - Resistivity Inversion

    Slide 14: Titan Line 4 - Resistivity Inversion

    Tasman Resources NL Titan Line 4 - Resistivity Inversion AMT Inversion for Line 4 Scalar AMT data 1D smooth model inversion EyHx •The inversion clearly shows the horizontal stratigraphy of the Neoproterozoic cover sequence above the basement unconformity at 600m depth. The strongly conductive zone a

  15. Slide 15: Titan Cross Section

    Slide 15: Titan Cross Section

    Tasman Resources NL Titan Cross Section TI7 •Simplified diagrammatic drill section from BD1 in the northwest to TI3 in the southeast. •The section presents the basement geological interpretation based on all available data. •Two untested drill targets are highlighted. •Note the 300m plus throw on th

  16. Slide 16: Base Case Results - Indicative Economic Modeling

    Slide 16: Base Case Results - Indicative Economic Modeling

    Tasman Resources NL Titan – Indicative Economic Modeling Base Case • 20Mt at 3% Cu, 1g/t Au • 20 year project; CapEx approx. $ 91M • Cu $US 2807/t; Au $US 395/oz • $A/$US exchange rate 0.73, discount rate 10% Results • NPV ~$ 202M; IRR ~44% • Highly grade sensitive - NPV ~$ 285M @ 3.5%Cu •Preliminar

  17. Slide 17: Other targets identified

    Slide 17: Other targets identified

    Tasman Resources NL Other targets identified •Residual gravity image (128pass hanning residual of variable density Bouguer gravity) •Assessment of the regional geophysical data together with a new interpretation of cover thickness in the Tasman project area has lead to the selection of a number of t

  18. Slide 18: Basement Geology - EL2594

    Slide 18: Basement Geology - EL2594

    Tasman Resources NL Basement Geology – EL2594 A C B •Tasman’s interpretation of basement geology, based on all available drilling, the most recent geophysics including Tasman gravity data and published solid geology maps (PIRSA and GA). •Location of regional sections A-B and A-C are shown. •Note the

  19. Slide 19: Cross Section A-B

    Slide 19: Cross Section A-B

    Tasman Resources NL Cross Section A-B •Tasman Regional Cross section A-B – Titan to Lake Torrens •The section shows postulated fault disrupted extensions of the Titan IOCG system at depth below Pandurra Formation (Zeus prospect). •The interpretation above does not show the possibility of up-faulted

  20. Slide 20: Future directions for the Lake Torrens Project

    Slide 20: Future directions for the Lake Torrens Project

    Tasman Resources NL Future directions for the Lake Torrens Project Titan and Zeus • Process AMT and MALM • Drilling up to 6 targets Marathon South, Vulcan • More AMT surveys and Atlas • Infill gravity at Zeus • AMT surveys • Define and drill targets Strategy: May – December 2004 Titan 1. Electrical

Source: Internet Archive copy of tasmanresources.com.au

More decks from Tasman Resources Ltd

All 44 Tasman Resources decks