Freehill Mining Ltd. · ASX:FHS

Freehill Mining — Shareholder Meeting (January 2021)

18 slides from Freehill Mining's shareholder meeting presentation, Jan 28, 2021

  1. Slide 1: Freehill Mining Limited (ASX: FHS) AGM 2020

    Freehill Mining Limited (ASX: FHS) Annual General Meeting of Shareholders - 2020 year Presentation 28 January 2021 Peter Hinner – Chief Executive Officer

  2. Slide 2: Important Information and Disclaimer

    Important Information and Disclaimer The information contained in this Presentation is of a general nature and does not purport to include or summarise all information that an investor should consider when making an investment decision. The Presentation does not contain all the information which wou

  3. Slide 3: Project Highlights

    YB6 magnetite JORC 49Mt 20.4% Fe mineral resource declared June 2020 Total project JORC magnetite resource now 67.7 Mt @ 19.1% Fe Scoping study foundational works underway Project Infill & extensional drilling planned for YB6 subject to completion of environmental approval Highlights El Dorado tenem

  4. Slide 4: Freehill's exploration area increased to 1188 hectares

    Freehill’s exploration area Increased from 390 Hec to 1188 hectares 4

  5. Slide 5: El Dorado

    El Dorado Copper and Gold Exploration  4 IP lines covering 250 hectares completed in SE sector  large IP structure identified with high chargeability core of 1000m x 500m  A number of smaller magnetic structures identified  Several geological surface sampling and structural mapping surveys compl

  6. Slide 6: El Dorado: Geophysics review highlights

    El Dorado : Geophysics review highlights Precis of geophysics findings for El Dorado “Several important NW structures cut through the center of the coincident chargeable-resistive anomaly. Higher grades may be associated with these structures, so central zone is considered a priority exploration tar

  7. Slide 7: El Dorado: Maiden drill hole ES001

    El Dorado Maiden drill hole ES001 A single 400m diamond hole ES-001 was drilled into an Induced Polarisation target at the north eastern corner of the Yerbas Buenas project area prior to acquisition of the El Dorado concessions. Interval 118-119m showing visible chalcopyrite veining and channel samp

  8. Slide 8: El Dorado Next Steps

    El Dorado Next Steps  Drill 2-3 x 400m diamond test holes into primary IP target being planned  2 holes will test main IP target & 1 hole will test an area of intense artisanal mining  If results encouraging then further holes will be drilled to define extent of structure  Drilling contractor an

  9. Slide 9: El Dorado Copper/Gold Exploration – Drill targets

    El Dorado Copper/Gold Exploration – Drill targets 9

  10. Slide 10: El Dorado Copper/Gold Exploration

    El Dorado Copper/Gold Exploration Chargeability and resistivity sections through centre of main IP structure 10

  11. Slide 11: Topography showing new Induced Polarisation target within El Dorado

    Topography at exaggerated scale showing new Induced Polarisation target within El Dorado concession area ( white outlines) and YB1 and YB6 drill holes to south 11

  12. Slide 12: YB6 Magnetite Project Development: Technical and economic studies

    YB6 Magnetite Project Development Technical and economic studies Metallurgical testing on drill core allows plant design parameters to be determined  Iron recovery  Process plant energy requirements  Ore hardness  Suitable Flowsheet  Final product grade for Sinter feed  Potential pellet feed g

  13. Slide 13: YB6 Magnetite Project Development: Test outcomes

    YB6 Magnetite Project Development Test outcomes:  Over 90% recovery of iron at the nominal mineable grade  A quality -3mm concentrate ‘sinter feed’ of +62% Fe able to be produced due to the high quality of the Yerbas Buenas mineralisation with some tests producing over 63% Fe.  Bond Work Index te

  14. Slide 14: YB6 Magnetite Project Development: Other works

    YB6 Magnetite Project Development Other works: • Proposals already received from engineering groups to assist with preparation of a feasibility study • Followup testwork underway to assess economic benefits of finer crushing • Logistics aspects of the study also underway – Port options, transport to

  15. Slide 15: YB6 Magnetite Project & El Dorado Copper-Gold

    YB6 Magnetite Project & El Dorado Copper-Gold Both the YB1, YB6 magnetite projects and El Dorado copper-gold projects are all situated within the same area 15

  16. Slide 16: YB1 & YB6 Drilled areas

    YB1 & YB6 Drilled areas 16

  17. Slide 17: 2021 Objectives

    2021 Objectives YB6 Magnetite Project • Focus on tasks that work toward getting a mine up and running • Continue development of a processing flowsheet & Conceptual mine plan • Application for mining licence • Run Pre-feasibility study in parallel with DIA • Deliver economic model by end of year • Ve

  18. Slide 18: Contact: Freehill Mining Limited (ASX:FHS)

    Contact: Freehill Mining Limited (ASX:FHS) T: 03 8658 5976 E: info@freehillmining.com.au W: www.freehillmining.com.au 18

Freehill Mining — Shareholder Meeting (January 2021) on 6ix