Royal Bafokeng Platinum Ltd

Royal Bafokeng Platinum — Mining Indaba 2016

25 slides from Royal Bafokeng Platinum's conference presentation, February 2016

  1. Slide 1: Mining Indaba 8th-11th February 2016

    Slide 1: Mining Indaba 8th-11th February 2016

    MINING INDABA 8TH – 11TH FEBRUARY 2016

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer The information presented in this presentation is of a general nature and the forward-looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im

  3. Slide 3: BRPM JV location relative to neighbouring mines

    Slide 3: BRPM JV location relative to neighbouring mines

    BRPM JV location relative to neighbouring mines RBPlat - Mining Indaba 3 8th - 11th February 2016

  4. Slide 4: Tailored strategies with inherent flexibility drive efficiencies and create value

    Slide 4: Tailored strategies with inherent flexibility drive efficiencies and create value

    Tailored strategies with inherent flexibility drive efficiencies and create value • Significant reduction in LTIFR and SIFR • Effective operational flexibility › UG2 mining platform established • Strong stakeholder relations › BRPM Merensky Phase III replacement › Limited industrial action project a

  5. Slide 5: Operational overview - 2015

    Slide 5: Operational overview - 2015

    Operational overview - 2015 Description Unit Q1 -2015 Q2 -2015 Q3 -2015 Key challenges in 2015 Safety • Safety performance – specifically fatal accidents SIFR (/200,000 hrs) rate 0.12 0.17 0.13 • Depressed market conditions LTIFR (/200,000 hrs) rate 0.48 0.54 0.26 Q3 focus on reducing non-critical e

  6. Slide 6: Safety, health and environment

    Slide 6: Safety, health and environment

    Safety, health and environment >

  7. Slide 7: Our performance

    Slide 7: Our performance

    Our performance Safety Injury frequency rates • 59% improvement in LTIFR since 2010 1.20 1.00 • 75% improvement in SIFR since 2010 1.00 0.91 • 13 fatalities since 2010 of which 5 were in 2015 0.80 0.68 0.61 0.53 Rate 2010 3 - Loco, winch, loader 0.60 0.41 0.40 2011 No fatalities 0.53 0.47 0.20 0.42

  8. Slide 8: The RBPlat safety strategy – zero harm through resilience

    Slide 8: The RBPlat safety strategy – zero harm through resilience

    The RBPlat safety strategy – zero harm through resilience Compliant Basic Re-active Pro-active Resilient RBPlat maturity • No care culture • Blame culture • Compliance culture • Ownership culture • Way of life • Regressive • Reactive awareness • Acceptable systems • Good systems • Integrated managem

  9. Slide 9: The PGM market and our strategy

    Slide 9: The PGM market and our strategy

    The PGM market and our strategy >

  10. Slide 10: The SA PGM industry – a challenging environment

    Slide 10: The SA PGM industry – a challenging environment

    The SA PGM industry – a challenging environment 1 Protecting asset value and shareholder wealth – Our approach Sovereign Declining debt crisis • Expect medium to longer term rebound Merensky 1 & depressed • Continue to strategically develop Styldrift I with due cognisance of reserves and commodity p

  11. Slide 11: Deteriorating PGM prices – our response

    Slide 11: Deteriorating PGM prices – our response

    Deteriorating PGM prices – our response RBPlat / BRPM JV • $/Pt oz basket price reduced by 30% • Capital deferment from June 2014 to Aug 2015 • Styldrift expenditure “self funding” • R/Pt oz basket price reduced by 18% • Rescheduling and restructuring of mining over the same period activities – maxi

  12. Slide 12: Styldrift I The way forward

    Slide 12: Styldrift I The way forward

    Styldrift I The way forward >

  13. Slide 13: Styldrift Mine – A high grade, shallow, mechanised Merensky mine

    Slide 13: Styldrift Mine – A high grade, shallow, mechanised Merensky mine

    Styldrift Mine – A high grade, shallow, mechanised Merensky mine High quality Shallow Merensky Key operating Production ramp up Merensky mine statistics • Shallow dip 40 - 60 • Twin vertical shaft system: • Mechanised bord and pillar • First ROM production Q3 2015 • Resource grade of 6.94g/t 4E › 10

  14. Slide 14: Styldrift I – a brief history

    Slide 14: Styldrift I – a brief history

    Styldrift I – a brief history…. 2009 2010 2011 2012 2013 2014 2015 • Site establishment • Bulk earthworks • Pre-sink completed • Shaft sinking on- • Sinking progressed • Surface & U/G ore • Sinking contract • Terrace bulk completed April going to 708L on Main handling terminated earthworks • Bulk ci

  15. Slide 15: Revised Styldrift construction programme

    Slide 15: Revised Styldrift construction programme

    Revised Styldrift construction programme Strategically aligning construction and production activities to optimise cashflow whilst maintaining the flexibility to ramp- up as and when conditions permit • Align construction progress/activities with • Optimise timing of processing requirements with mar

  16. Slide 16: Strategically align work with current market conditions and forecast

    Slide 16: Strategically align work with current market conditions and forecast

    Strategically align work with current market conditions and forecast Impact of price on ability to do work Pricing below R17 500 /Pt oz Pricing above R17 500 /Pt oz Ramp-up of project Zone of progression • Sustained basket prices above R18 500/Pt oz • Develop key infrastructure • Positive market sen

  17. Slide 17: Styldrift I revised construction programme

    Slide 17: Styldrift I revised construction programme

    Styldrift I revised construction programme 2015 Mining and construction - R17 000/Pt oz 2016 Mining and construction – R17 500/Pt oz • Development of underground infrastructure on 600 • Complete 250ktpm concentrator upgrade level • 100ktpm module – upfront design work › Workshops • Continue to devel

  18. Slide 18: 600 Level development and construction activities

    Slide 18: 600 Level development and construction activities

    600 Level development and construction activities Two sections LEGEND pre-established West Development focus Current workings – Sept 2015 • Maximise available face-length Infrastructure to be completed end • Access around shaft infrastructure 2016 Service # • Pre-develop footprint Deferred infrastru

  19. Slide 19: 642 Level mining and construction activities

    Slide 19: 642 Level mining and construction activities

    642 Level mining and construction activities LEGEND Service # Current workings – Sept 2015 Development focus Infrastructure to b completed 2016 • Ore handling infrastructure Deferred infrastructure • Access/advance decline north and south Top of Main # Settlers • North 1 and South 1 ore-passes North

  20. Slide 20: Level development and construction activities

    Slide 20: Level development and construction activities

    708 Level development and construction activities LEGEND Current workings – Sept 2015 Development focus Infrastructure to be completed 2016 • Ore handling infrastructure Deferred infrastructure • Water handling infrastructure Service # • Level hand over Main # Settler 1 Silo 1 Silo 2 Settler 2 Silo

  21. Slide 21: “De-risking” the ramp up

    Slide 21: “De-risking” the ramp up

    “De-risking” the ramp up LEGEND Original Revised Current workings – Sept 2015 Description Ramp-up Ramp-up Original ramp-up footprint Revised ramp-up footprint end 2016 Sections pre-established 2 4 Deferred infrastructure Service Two sections pre-established # Stoping face-length 335m 800m West Works

  22. Slide 22: Conclusion

    Slide 22: Conclusion

    CONCLUSION >

  23. Slide 23: Styldrift key outputs

    Slide 23: Styldrift key outputs

    Styldrift key outputs Revised Styldrift ramp-up Recovered ounces (4E) 3000 350.0 2500 300.0 2000 250.0 200.0 ktpm koz 1500 150.0 1000 100.0 500 50.0 0 0.0 2016 2017 2018 2019 2020 2016 2017 2018 2019 2020 • Total cash outflows related to Styldrift construction activities Description Unit H1-2015 H2-

  24. Slide 24: BRPM JV production profile

    Slide 24: BRPM JV production profile

    BRPM JV production profile Merensky contribution RBPlat production plan 4.5 100% 4.0 90% 80% 3.5 70% 3.0 % Contribution 60% 2.5 50% Mt 2.0 40% 1.5 30% 1.0 20% 0.5 10% 0.0 0% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2016 2017 2018 2019 2020 2021 2022 2023 2024 Merensky UG2 SD1 Merensky North Shaf

  25. Slide 25: Royal Bafokeng Platinum: An attractive investment proposition

    Slide 25: Royal Bafokeng Platinum: An attractive investment proposition

    Royal Bafokeng Platinum : An attractive investment proposition Lower political risk Black-owned and controlled - exceeds all statutory BEE requirements Lower labour risk Employees and owners are aligned Merensky biased long life producer Long-life assets Attributable resources of 47.83 Moz 4E; Attri

Source: company website

More decks from Royal Bafokeng Platinum Ltd