Tasman Resources Ltd · ASX:TAS
Tasman Resources — Tasman Resources NL — Shareholder Meeting (2004)
23 slides from Tasman Resources's shareholder meeting presentation, 2004

Slide 1: Tasman Resources NL
Tasman Resources NL Tasman Resources NL Presentation by: Robert N Smith BSc (Hons), MSc

Slide 2: Schematic Summary of Fe-Oxide and Metal Zoning Patterns
Tasman Resources NL Schematic Summary of Fe-Oxide and Metal Zoning Patterns Olympic Dam Prominent Hill Titan

Slide 3: Primary Mineral Targets
Tasman Resources NL Primary Mineral Targets

Slide 4: Marathon South: Residual Gravity
Tasman Resources NL Marathon South: Residual Gravity

Slide 5: Marathon South Location
Tasman Resources NL Marathon South Location Old Old J Waterman's Waterman's Titan Titan$ $ $ $ Shaft Shaft Marathon Marathon South South $ $ LLLLLLaaaaaakkk kkkeeeeTTT TTToooooorrr # # rrrreeeeeennn nnnssssss Roxby Downs Roxby Downs $ $ $ MS1 AAM M TT L Liinn ee 11 $ $ Proposed Drill Hole J Old Wate

Slide 6: Marathon South AMT
Tasman Resources NL Marathon South AMT

Slide 7: Marathon South Interpretation
Tasman Resources NL Marathon South Interpretation

Slide 8: Marathon South: View from West
Tasman Resources NL Marathon South View from West

Slide 9: Marathon South: View from East
Tasman Resources NL Marathon South View from East

Slide 10: Drillhole MS 1: 581m to 587m
Tasman Resources NL Drillhole MS 1: 581m to 587m

Slide 11: Drillhole MS 1: 701.5m
Tasman Resources NL Drillhole MS 1: 701.5m

Slide 12: Drillhole MS 1: 701.75m
Tasman Resources NL Drillhole MS 1: 701.75m

Slide 13: Drillhole MS 1: 676.6m
Tasman Resources NL Drillhole MS 1: 676.6m

Slide 14: Drillhole MS 1: 706m
Tasman Resources NL Drillhole MS 1: 706m

Slide 15: Drillhole MS 1: 670m
Tasman Resources NL Drillhole MS 1: 670m

Slide 16: Cross Section A-B – EL 3209
Tasman Resources NL Cross Section A-B – EL 3209

Slide 17: Greater Titan Map
Tasman Resources NL Greater Titan Map

Slide 18: Titan Summary Geophysical Interpretation
Tasman Resources NL Titan Summary Geophysical Interpretation

Slide 19: Titan AMT Line 2 - Resistivity Inversion
Tasman Resources NL Titan AMT Line 2 - Resistivity Inversion BD1 TI2 TI6 TI7 TI3

Slide 20: Titan Cross Section (TI7)
Tasman Resources NL Titan Cross Section (TI7)

Slide 21: Titan Line 4 - Resistivity Inversion
Tasman Resources NL Titan Line 4 - Resistivity Inversion

Slide 22: Titan Cross Section (TI8)
Tasman Resources NL Titan Cross Section (TI8)

Slide 23: Base Case Results
Tasman Resources NL Indicative Economic Modeling Base Case • 20Mt at 3% Cu, 1g/t Au • 20 year project; CapEx approx. $ 91M • Cu $US 3150/t; Au $US 447/oz • $A/$US exchange rate 0.78, discount rate 10% Results • NPV ~$ 230M; IRR ~47% • Highly grade sensitive - NPV ~$ 318M @ 3.5%Cu
Source: Internet Archive copy of tasmanresources.com.au