Royal Bafokeng Platinum — Merrill Lynch Sun City Conference 2011
44 slides from Royal Bafokeng Platinum's conference presentation, March 2011

Slide 1: A compelling platinum story
A compelling platinum story Merrill Lynch Sun City Conference March 2011

Slide 2: Disclaimer
Disclaimer The information presented in this presentation is of a general nature and the forward looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im

Slide 3: About RBPlat
~ SS a. co ~ ad 5 o a 4 za gplatinum.co. yw.bafoken

Slide 4: About Royal Bafokeng Platinum (RBPlat)
About Royal Bafokeng Platinum (RBPlat) • Black-owned and controlled, mid-tier PGMs producer • Assets located on Western Limb of Bushveld Complex, South Africa • 67% interest in Bafokeng Rasimone Platinum Mine (BRPM), unincorporated JV with Anglo Platinum • Boschkoppie mine (operating since 1998), St

Slide 5: Prime location on the Western Limb
Prime location on the Western Limb 5

Slide 6: A long and proud history
A long and proud history Royal Bafokeng Discussions between Merensky opencast BRPM JV restructuring; JSE listing completed Nation purchases RBN and AngloPlat to commences RBPlat obtains 67% interest land form JV 1860s 1925 1990s 1997 1998 2002 Dec 2009 Jan 2010 Nov 2010 Platinum discovered in Site e

Slide 7: Ownership structure
Ownership structure i ah RBPlat (listed company) aa Rg BRPM Unincorporated 71 Anglo Platinum Ltd 2 Royal Bafokeng Holdings (Pty) Ltd 3 Rustenburg Platinum Mines Ltd’ 4 Royal Bafokeng Platinum Holdings (Pty) Ltd 5 Royal Bafokeng Resources (Pty) Ltd www.bafokengplatinum.co.za 7 —_—=_=_

Slide 8: Our strategy
Our strategy • Achieve operational excellence at BRPM (optimising volumes and reducing costs) • Grow organically through Styldrift • Bring Styldrift II forward as an expansion project • Build flexibility in the business with co-extraction • Pursue value enhancing acquisitions and synergies 8

Slide 9: Experienced and independent board
Experienced and independent board Non-executive Directors Advocate Kgomotso Moroka, Independent Non-executive Chairman Executive Directors BProc, LLB • Practising advocate n at Johannesburg Bar since 1989 and businesswoma Steve Phiri, CEO • Directorships at Standard Bank, SAB, Netcare, Multichoice S

Slide 10: Focused and experienced management
Focused and experienced management Steve Phiri, CEO Glenn Harris, GM: BRPM JV BJuris, LLB, LLM, Dip. Corp. Law NHD (Metals) , MDP, Cert. Min. Man. • Joined RBPlat in April 2010 • Manager of BRPM JV since 2006 • Non-executive Director of RBH • Over 26 years’ mining experience, 17 years in platinum mi

Slide 11: Successful IPO
Successful IPO • JSE listing completed November 2010 Geographical spread of public investors • share code: RBP • R2.98 billion raised (R1bn attributable to RBPlat) 4% 1% 1% 5% • significantly oversubscribed • strong offshore support 12% • 164,095,215 shares in issue • 5 343 shareholders at 31 Decemb

Slide 12: Our business
7) % J) = a =) a L =) e) www.bafokengplatinum.co.za

Slide 13: Well-established shallow Merensky producer on Western Limb
Well-established shallow Merensky producer on Western Limb, well-developed infrastructure • 12 years of operation • well-understood, defined geology • sophisticated 3D seismic exploration • Shallow depth • Boschkoppie mine: twin decline shaft complex at 500m • Styldrift I project: new twin vertical

Slide 14: Well-established shallow Merensky producer: total production overview
Well-established shallow Merensky producer on Western Limb, well-developed infrastructure • Focus on Merensky, with significant quality UG2 • Merensky production growth at Styldrift from 2017 • UG2 to gradually replace Merensky production from 2014 at Boschkoppie south shaft, and from 2025 at north

Slide 15: Attractive margins with scope for cost reduction
Attractive margins with scope for cost reduction • High grade, attractive prill split (base metals also contribute significantly towards revenue with nickel at 11% of revenue) • Improvement opportunities • continued optimisation of production volumes • cost optimisation through expenditure review an

Slide 16: Poised to grow organically and through consolidation
Poised to grow organically and through consolidation • High-grade resource base with organic growth potential • Supportive, well capitalised shareholders • Leading internal growth projects on last remaining shallow Merensky reef • increase in production planned with Styldrift 1 project (2.7mtpa) • o

Slide 17: Poised to grow organically and through consolidation (continued)
Poised to grow organically and through consolidation (continued) • Boschkoppie, based on current LOF plans • production expected to be maintained at 2.4mtpa until 2033 • UG2 to be introduced from 2014 • Styldrift 1, based on current approved plans • R11.8 billion expansion project • R9.4 billion for

Slide 18: Poised to grow organically and through consolidation (continued)
Poised to grow organically and through consolidation (continued) Value-enhancing transactions with Impala • Key commercial terms agreed on: • 7-year mining arrangement with Impala via Impala’s #6 & 8 shafts • Resource of 780 000 tonnes of UG2 Wesizwe Wesizwe Project 2 Project 2 • 30-year mining arra

Slide 19: Our operations
2) Cc ie) B © i o a ° = =) 12) www.bafokengplatinum.co.za

Slide 20: Geology, layout and access
Geology, layout and access BRPM layout Shaft layout Vent shaft (surface to level 9) Chairlift decline Belt decline Material decline Level 9 Vertical dams Level 10 Source: Company Orebody access North Shaft South Shaft Sample prep Ore conveyed to plant Belt riding 20

Slide 21: Well-developed infrastructure
Well-developed infrastructure North Shaft South Shaft Concentrator Plant ISA Mill ISA mill position CCO 21

Slide 22: Resource optimisation strategy and exploration
Resource optimisation strategy and exploration • Geology 3D seismic survey • well-understood, high-quality orebody • total drillholes: 5,327 • intersection points: 7,787 • total drilled metres: 1,200km • aeromagnetic and 3D seismic surveys Exploration drilling Aeromagnetic survey 22

Slide 23: Production
Production • Smooth operational handover from 4 January 2010 • Operational strategy aimed at optimising throughput, revenue • tonnes milled — increased by 12% to 2.41Mt • improved stoping crew efficiency, introduction of UG2, plant maintenance • Head grade dropped 5% to 4.31g/t Description Unit 2010

Slide 24: On-mine cash costs
On-mine cash costs • On-mine cash costs steady at R707/t milled • Lower grade negatively affected per ounce costs • Business improvement strategy implemented in Q3 2010 2010 2009 % change Labour Employees 6 793 6 605 3 On-mine cash cost/tonne milled R/t 707 704 — On-mine cash cost/PGM oz delivered R

Slide 25: BRPM replacement projects
BRPM replacement projects • Boschkoppie Phase II • R2.43 billion Merensky replacement project, extension of the Phase 1 north and south shaft complexes • started 2005, nearing completion • North shaft scheduled for completion May 2011 • South shaft scheduled for completion July 2012 • Boschkoppie Ph

Slide 26: Boschkoppie production profile
Boschkoppie production profile Revised Boschkoppie Production 3,000 2,500 2,000 1,500 kt 1,000 500 - 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Boschkoppie South - Merensky Boschkoppie South - UG2 Boschkoppie North - Merensky Boschkoppie North - UG2 26

Slide 27: Styldrift production profile
Styldrift production profile Styldrift Production 3,000 2,500 2,000 1,500 kt 1,000 500 - 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Styldrift 1 - UG2 Styldrift1 - Merensky 27

Slide 28: Progress at Styldrift
@ ROYAL BAFOKENG Progress at Styldrift PLATINUM www.bafokengplatinum.co.za 28 ———————

Slide 29: Financial Performance
Financial Performance www.bafokengplatinum.co.za EE

Slide 30: Key financial performance indicators
Key financial performance indicators FY10 FY09 % change Average basket price (R/Pt oz) 15 555 12 894 21 Revenue (Rm) 2 107 1 155 82 Cost of sales (Rm) 1 606 939 71 Gross profit (Rm) 501 216 132 Operating profit (Rm) 442 185 139 Normalised EBITDA* (Rm) 815 330 147 Net profit/(loss) after tax (Rm) 3 1

Slide 31: Key financial performance indicators (cont)
Key financial performance indicators (cont) FY10 FY09 % change Cash generated by operations (Rm) 777.0 257.3 202 Cash, net of debt (incl pref share investment) (Rm) 1 150 52 2 111 Capex (100% BRPM JV) (Rm) 967 754 28 Gross profit margin (%) 23.8 18.7 27 EBITDA (%) 38.7 28.6 35 NAV (Rand per share) 6

Slide 32: Sales volumes by metal and average prices achieved
Sales volumes by metal and average prices achieved Sales volume Average price achieved* Metals contribution to revenue ($) 2.3% 0.5% 10.8% Platinum (oz) 187 360 1 626/oz 0.9% 0.6% Palladium (oz) 76 937 531/oz 6.9% Gold (oz) 10 416 1 239/oz 2.8% Rhodium (oz) 13 423 2 357/oz 8.9% 66.3% Iridium (oz) 4

Slide 33: Headline earnings
Headline earnings 1,000 468.5 168.8 136.1 0.8 283.3 800 600 92.1 96.6 306.2 12.1 166.4 380.5 R million 400 46.4 149 1.9 271.7 200 28 -123.4 0 -200 33

Slide 34: Breakdown of cost of sales
Breakdown of cost of sales Breakdown of costs (%) FY10 FY09 R million R million 32.7% Labour 490 323 39.6% Utilities 88 44 Contractor costs 264 158 Materials and other mining 363 266 20.7% 6.9% costs Labour Other 29 4 Utilities Contractors Cost of sales 1 233 794 Materials and other costs 34

Slide 35: Capital expenditure
. . re) ROYAL BAFOKENG Capital expenditure PLATINUM Capital expenditure R(miltion) 1.000 800 600 FY 2010 FY 2009 FY 2008 m Boschkoppie Phase |/ Boschkoppie Phase Ill tw UG2 Feasibility mMiGplant w Styldrift! 2 SIB* @ Other *SIB is stay-in-business expenditure, equivalent to sustaining capital expend

Slide 36: Cash flow
Cash flow 2,000 942.4 0.2 718.5 1,800 1,600 1,400 250.9 1 150.3 R million 1,200 161.5 1,000 899.4 785.3 800 600 400 200 51.5 0 Cash and cash Cash flow from Net Proceeds Related party Capex Cash flow Cash and cash Near cash Cash and cash equivalents 1 operations from IPO loans received utilised for e

Slide 37: Funding
Funding • R250 million facility for funding of intra-month working capital • Unused R500 million revolving credit facility • Policy not to hedge Funding of Styldrift capital Cash from Equity Operations 22% 50% Debt 28% 37

Slide 38: Our investment case
Our investment case www.bafokengplatinum.co.za =

Slide 39: Market fundamentals
Market fundamentals • Encouraging price performance across PGM metals • Driven by market deficit, mine reserve depletion in medium to longer term • ETF demand remains steady • Physical demand recovery anticipated for 2012 PGM prices Jan 2008 — Feb 2011 ($/oz) 2,500 12,000 10,000 2,000 8,000 1,500 6,

Slide 40: A compelling story
A compelling story • Compelling sector with strong demand and supply fundamentals • Well-established, shallow, Western Limb Merensky producer with well-developed infrastructure • Attractive margin operations with scope for cost reduction • Experienced management team with clear focus and operating f

Slide 41: Appendices
Appendices www.bafokengplatinum.co.za

Slide 42: Safety and health (Appendix I)
Safety and health (Appendix I) • Challenges • improvement: LTIFR (15%), injury-free days (15%), 111 fewer injuries • deterioration: SIFR (29%), three fatalities • Safety management programme • OSHAS 18001 • holistic approach to reduce risk exposure • Serious injury intervention • key risk areas • FO

Slide 43: Optimisation (Appendix II)
Optimisation (Appendix II) • Early UG2 extraction • Agreement with Impala to mine, over seven years, around 780 00oz (4E) in areas contiguous to Impala’s #6 and #8 shafts • Programme to optimise grade of ore delivered to concentrators • Business optimisation intervention from Q3 aimed at productivit

Slide 44: ngplatinum.co
za ngplatinum.co ww. bafoke!
Source: company website
More decks from Royal Bafokeng Platinum Ltd
Renaissance Capital Metals & Mining Conference 202118 slides · May 2021
H1 2020 Earnings Presentation39 slides · 2020
Merger or Acquisition (October 2019)11 slides · Oct 16, 2019
RBPlat Analyst Roundtable 201910 slides · Aug 6, 2019
Technical Presentation (February 2019)34 slides · Feb 1, 2019
Fact Sheet (2019)11 slides · 2019