Camino Minerals Corporation · TSXV:COR

Camino Minerals — Investor Presentation (July 2024)

39 slides from Camino Minerals's investor presentation, July 2024

  1. Slide 1: Camino Minerals Corporation July 2024

    CAMINOCORP.COM TSX.V : COR | OTCQB : CAMZF | WKN: A116E1 JULY 2024 1

  2. Slide 2: Cautionary Notes and Forward-Looking Statements

    Cautionary Notes and Forward-Looking Statements This document has been prepared by Camino Minerals Corporation (the “Company”) for evaluation of the Company by the recipient. The information contained in this presentation is derived from estimates made by the Company, information that has been provi

  3. Slide 3: Exclusivity to Acquire Construction-Ready Puquios Project in Chile

    CAMINO AWARDED EXCLUSIVITY TO COMPLETE DUE DILIGENCE AND FINALIZE THE ACQUISITION OF THE CONSTRUCTION-READY PUQUIOS PROJECT IN CHILE Right Project – Right Location – Right Partner Camino Extending Existing Partnership With Nittetsu Mining To Acquire The Property As A 50:50 Joint Venture Potential Ac

  4. Slide 4: Existing Resource and Discovery Drilling Across Three Projects

    4 New Resource Potential and Existing Resource and Discovery High-Grade Vein System Discovery Drilling in a Major IOCG Drilling in a Major Porphyry System System

  5. Slide 5: Los Chapitos

    LOS CHAPITOS fm

  6. Slide 6: Nittetsu Mining is Camino's New Business Partner for Los Chapitos

    Nittetsu Mining Co., Ltd. is Camino’s new Nittetsu is a Japanese corporation business partner for its Los Chapitos listed on the Tokyo Stock Exchange with 84-year history as a mining copper exploration project. and trading company. Nittetsu is the operator of the Atacama Kozan • Camino to remain the

  7. Slide 7: Copper-Rich Coast of Peru Relatively Unexplored Compared to Chile

    COMPARED TO CHILE, THE COPPER-RICH COAST OF PERU IS RELATIVELY UNEXPLORED The Los Chapitos project represents a style of deposit known as IOCG (Iron Oxide-Copper-Gold) that extends down the Peruvian coast into Chile and includes such deposits as Mina Justa (Peru), Mantos Blancos (Chile), and La Cand

  8. Slide 8: 2024 Exploration and Drilling Campaign

    2024 EXPLORATION AND DRILLING CAMPAIGN In early 2024, Camino’s step-out drilling campaign explored for new zones of oxide copper mineralization with a total of 2,225.7 metres consisting of 15 drillholes to depths of ~150 metres (see news release dated April 11, 2024). Drillholes targeted new areas m

  9. Slide 9: Rio Tinto Claims Ground Next to Los Chapitos

    RIO TINTO CLAIMS GROUND NEXT TO LOS CHAPITOS

  10. Slide 10: Geological Age of Los Chapitos

    GEOLOGICAL AGE OF LOS CHAPITOS SIMILAR TO MARCONA AND MINA-JUSTA MINES Intrusives: 150 – 160 Million years old. Mineralization: 105 Million years old.

  11. Slide 11: Los Chapitos Adriana Zone Drilling Highlights

    LOS CHAPITOS Pad 1 to Pad 4 extend over 350m strike length of Diva Trend. ADRIANA ZONE Diva Trend extends for 7 KM. DRILLING HIGHLIGHTS Significant copper intercept highlights (not true thickness) for Pad 1, Pad 2A and Pad 4 include: DCH-001 (Pad 1) 55.3m @ 0.73% Cu from 7.2m depth AND 33.0 @ 0.40%

  12. Slide 12: Strategy to Connect and Aggregate Additional Copper Oxide Mantos

    STRATEGY TO CONNECT AND AGGREGATE ADDITIONAL COPPER OXIDE MANTOS TBFd

  13. Slide 13: Los Chapitos Preliminary Metallurgical Column Test Results

    LOS CHAPITOS PRELIMINARY Oxide Composites to depths of approximately 300m METALLURGICAL COLUMN • 74% Cu average recoveries for composite head grade of 0.80% Cu from 3 Column Tests • 73% to 76% Cu recoveries from Bottle Roll tests TEST RESULTS • Preliminary acid consumption bottle/column 3.3/9.05 kg

  14. Slide 14: Infrastructure to Build a Mine

    INFRASTRUCTURE TO BUILD A MINE (SIMILAR TO MARCONA AND MINA-JUSTA) 1. Power: 510KV lines over the property 2. Water: seawater processing 15km to project 3. Access: 40 minutes from Pan American Highway (mining and transport Town of Chala) Source: Esri, Garmin, GEBCO, NOAA NGDC, and other contribution

  15. Slide 15: Case Study: Value Creation in a Copper Oxide System – Marimaca Copper

    Case Study: Value creation in a Copper Oxide system – Marimaca Copper Nora Plant Begins Operations, Land positions signed PEA Resource Update Resource Update Marimaca Processing Plant Acquired - 43,000m PEA drill - 70mt M&I @ 0.6% Cu - 140mt M&I @ 0.48% Cu RC @ Marimaca is 16 holes: program commence

  16. Slide 16: Maria Cecilia

  17. Slide 17: Inaugural Drilling Campaign at Maria Cecilia Commenced June 1, 2024

    THE INAUGURAL DRILLING CAMPAIGN AT MARIA CECILIA COMMENCED ON JUNE 1, 2024 The goal of the drilling campaign is to confirm the presence of primary porphyry copper mineralization, along with gold and molybdenum, at depth. In addition, mineralization may be discovered in reactive host rocks, notably t

  18. Slide 18: Maria Cecilia – Major Porphyry System in a Prolific Copper Belt

    MARIA CECILIA – MAJOR PORPHYRY SYSTEM IN A PROLIFIC COPPER BELT The project consists of claims that cover 7,110 hectares, and the Maria Cecilia exploration target is believed to be at the heart of the porphyry complex that includes the Toropunto Epithermal deposit and the Emmanuel Porphyry deposit.

  19. Slide 19: The Maria Cecilia Porphyry Complex

    THE MARIA CECILIA Twin 1 PORPHYRY COMPLEX Twin 2 Se cti on A-B

  20. Slide 20: Geochemical Zonation Around Porphyry Copper Systems

    Geochemical Zonation Around Porphyry Copper Systems Molybdenum, then Copper Source: Halley et al, 2015.

  21. Slide 21: Maria Cecilia – Porphyry Complex

    Maria Cecilia – Porphyry Complex Porphyry Twin 1 t ul Fa a nt pu an An 2 Porphyry 1 Tourmaline breccia, polimicitic, clasts of sandstone and granodiorite porphyry with veinlets, quartz – sericite alteration, Andesitic porphyry with potassic alteration (biotite); quartz, pyrite diss and molybdenum (w

  22. Slide 22: Maria Cecilia Porphyry & Skarn Zone Target

    MARIA CECILIA PORPHYRY & SKARN ZONE TARGET NW-SE 330-340° oriented strip, with an approximate length and width of 2 km by 250m; Zone has copper anomalies that range from 500 ppm up to 6.7% Cu including 110 g/t Ag; Chip sampling of 3 trenches returned grades up to 1.0% copper, including 27.5m @ 0.35%

  23. Slide 23: Mineral Resource Statement for Toropunto and Emmanuel Projects

    Mineral Resource Statement for Toropunto and Emmanuel projects (8.9 US$/t NSR cut-off), Ancash Department, Peru, SRK Consulting (Peru) S.A., December 2020 Project Category Tonnes (Mt) CuEq (%) Cu (%) Au (g/t) Ag (g/t) Mo (ppm) (%) Toropunto Inferred 32.0 0.215 0.14 0.06 5.75 4.7 Emmanuel Inferred 93

  24. Slide 24: Case Study: Value Creation in a Porphyry System - Filo Mining

    Case Study: Value creation in a Porphyry System - Filo Mining Drills 1,025m of 0.30% Copper and Drills 858m at 1.80% Drills 1,224m at 1.26% 0.22 g/t Gold at Filo del Sol - CuEq; Discovers New CuEq, Extends One of Demonstrating the Presence of a High-Grade Feeder the High-Grade Breccias Significant C

  25. Slide 25: Maria Cecilia Project

    tA SS, Oe a MARIA CECILIA PROJECT cHimgoTe “*, f Port " .V INAS D7 \ ye N <2 CHIMBO ty AN

  26. Slide 26: Plata Dorada

    ———_ ~~ —_ PLATA DORADA sa ey

  27. Slide 27: High Grade Copper-Silver Project

    HIGH GRADE COPPER-SILVER PROJECT 100% Ownership; Concessions totaling 3,800 Ha; Located 158 km east of Cuzco from paved highway to Brazil; Accessible all year round by paved highway and all-weather dirt roads.

  28. Slide 28: Copper, Silver, Gold, Zinc and Lead

    COPPER, SILVER, GOLD, ZINC, AND LEAD have rock chip sample grades up to 1,565 g/t silver (Ag), 0.67 g/t gold (Au), 1.19% copper (Cu), 32% zinc (Zn), and 18.25% lead (Pb) Rock chip samples range in width from 0.2 to 2.0 m across the veins

  29. Slide 29: Exploration Work at Plata Dorada Identified New Vein Structures

    Exploration work at Plata Dorada identified new vein structures, with over 70 channel samples tested for metal content. Best Results of the 2020 Geochemical Sampling Campaign included 5.76% Cu and 1,500 g/t Ag. The Company now plans to continue to develop a 1:2000 geological map and model of the vet

  30. Slide 30: Known Veins Well-Exposed; Potential to Discover New Veins

    KNOWN VEINS ARE WELL-EXPOSED. POTENTIAL TO DISCOVER NEW VEINS ON THE PLATA DORADA PROPERTY. PERSON

  31. Slide 31: Environmental and Social Governance

    ENVIRONMENTAL AND | SOCIAL GOVERNANCE

  32. Slide 32: ESG Accountability

    ESG ACCOUNTABILITY In 2021, Camino Corp. has developed its Environmental and Social Governance strategy and completed its ESG disclosure submission with Digbee Ltd.’s inaugural reporting cycle. In 2022, Camino completed its second submission, with an improved grade for it Los Chapitos Project. The a

  33. Slide 33: Maria Cecilia vs Antamina

    MARIA CECILIA VS ANTAMINA 33

  34. Slide 34: Our Commitment to ESG

    OUR COMMITMENT TO ESG Camino Corp. is dedicated to developing our projects to bring sustainable and long-lasting social and economic benefits for the host communities and all stakeholders. We engage in meaningful consultation and honest dialogue with representatives of the communities surrounding ou

  35. Slide 35: Ownership Structure and Share Structure

    SHARE STRUCTURE OWNERSHIP STRUCTURE July 2024 Denham Capital 14% CURRENT SHARES OUTSTANDING 209,251,638 Delbrook Capital MANAGEMENT AND INSIDERS ~8% 8% 60% WARRANTS (@ $0.10 EXERCISE PRICE) 33,333,334 8% ~ Management OPTIONS (@ $0.15 AVERAGE EXERCISE PRICE) 16,225,000 ~10% ~ Other Institutions

  36. Slide 36: Management and Directors

    36 JAY CHMELAUSKAS, BASc Geol. Eng., MBA CHRIS ADAMS CEO, President, Director Director • Former CEO of start-up to production companies Jinshan Goldmines Corp. • Former Senior Managing Director and head of Macquarie’s mining finance (China), now China Gold International; Rheominerals (Nevada); and d

  37. Slide 37: Plan Unidos

    In November of 2023 Peru has called for the implementation of 25 PLAN UNIDOS: measures to reactivate the country’s economy, with a particular focus on the mining, energy, and oil and gas sectors. “When it comes to exploration, the goal is to optimize the environmental requirements and prior consulta

  38. Slide 38: Peru in Top 10 New and Probable Copper Mines

    PERU IN TOP 10 NEW AND PROBABLE COPPER MINES

  39. Slide 39: Jay Chmelauskas, CEO, President & Director

    JAY CHMELAUSKAS BASC, MBA E XECUTIVE O FFICES CEO, PRESIDENT & DIRECTOR S UITE #1780, 555 W H ASTINGS S TREET JAYC @CAMINOCORP . COM V ANCOUVER , BC V6B 4N4, C ANADA 1.604.493.2058 www.caminocorp.com info@caminocorp.com

Camino Minerals — Investor Presentation (July 2024) on 6ix