Surge Copper Corp. · TSXV:SURG

Surge Copper — Investor Presentation (June 2023)

34 slides from Surge Copper's investor presentation, Jun 13, 2023

  1. Slide 1: Copper Discovery & Development in British Columbia

    TSXV:SURG | OTCQX:SRGXF | FRA:G6D2 Copper Discovery & Development in British Columbia June0 2023

  2. Slide 2: Disclaimer

    Disclaimer This presentation (“Presentation”) is being issued by Surge Copper Corp. (the “Company” or “Surge Copper”) for information purposes only. Cautionary Statements Concerning Forward-Looking Statements This Presentation contains "forward-looking information" within the meaning of applicable C

  3. Slide 3: District Overview

    District Overview S URGE CONTROLS A DOMINANT LAND POSITION IN THE B ERG -H UCKLEBERRY -O OTSA DISTRICT Competitive Advantages ✓Over 1.4 Bt of combined M+I resources1 at Berg & Ootsa ✓Deposits accessible by road, off Trans-Canada Highway ✓Abundant fresh water resources ✓Multiple nearby port options ✓

  4. Slide 4: Maiden Berg PEA Highlights

    Maiden Berg PEA Highlights R OBUST BASE CASE ECONOMICS WITH SIGNIFICANT LOW - COST PRODUCTION OVER A LONG MINE LIFE C$2.1B Base Case NPV8% 5.8Blbs Life-of-Mine Payable CuEq1 Production 30 Year Mine Life Annual Payable CuEq 20% Base Case IRR 191Mlbs Production C$348m Life-of-Mine Avg. Annual FCF $1,0

  5. Slide 5: Strategically Significant Project

    Strategically Significant Project S IGNIFICANT VOLUMES OF CRITICAL MINERALS C U & M O OVER 30- YEAR MINE LIFE Breakdown Production Profile 3.7 Blbs LOM 350 $3.00 121 Mlbs/yr Cu 64% of Revenue Co-Product Cash Costs (US$/lb CuEq) 281 300 279 $2.50 267 264 263 399 Mlbs LOM Payable Copper Eq. (Mlbs CuEq

  6. Slide 6: Metal Price Sensitivity

    Metal Price Sensitivity B ERG PEA ECONOMICS SHOW STRONG LEVERAGE TO COPPER PRICE UPSIDE UNDER A RANGE OF MOLYBDENUM PRICES $4,000 30% - Base Case Numbers 27% $3,500 25% 25% 25% $3,000 22% 23% 20% 20% 20% NPV8% (C$ million) $2,500 18% IRR (%) $2,000 15% $3,443 $1,500 $2,990 $2,979 10% $2,537 $2,526 $

  7. Slide 7: Simple Project Design

    Simple Project Design L OW COMPLEXITY CONFIGURATION DESIGNED TO MINIMIZE ENVIRONMENTAL FOOTPRINT & CARBON EMISSIONS Highlights ✓Single, long-life open pit mine ✓Use of downhill, electric- powered overland conveyors ✓Conventional flowsheet to produce copper concentrate (with PM by- products) plus mol

  8. Slide 8: One of the Largest Resource Bases in Western Canada

    One of the Largest Resource Bases in Western Canada G LOBAL M&I RESOURCE TONNES 1 3,000 - Development Projects - Mines 2,500 Global M&I Resource (Mt) 2,000 1,500 1,000 500 0 Huckleberry Casino Gibraltar Kwanika Highland Valley Copper Mountain Red Chris North Island Saddle Mt Polley Mt Milligan Berg

  9. Slide 9: What is the opportunity in copper?

    What is the opportunity in copper? B IG M ARKET + S TRONG F UNDAMENTALS = A TTRACTIVE TO M AJORS Copper is the quintessential electric metal • Demand growth exposure to three “megatrends”: Renewables 1 Lower energy Urbanization and infrastructure investment denisity  higher metal utilization 2 Grow

  10. Slide 10: Why BC?

    Why BC? T OP MINING JURISDICTION WITH THE RIGHT INGREDIENTS FOR AN ESG FOCUSED FUTURE • British Columbia is a top mining jurisdiction that is well positioned for an ESG focused future ✓Stable jurisdiction and fiscal regime ✓Clear and thorough environmental permitting process ✓Strong opportunities to

  11. Slide 11: Advancing a Canadian Critical Metals District

    Advancing a Canadian Critical Metals District T HREE BUCKETS OF VALUE CREATION POTENTIAL Berg Project Ootsa Project Regional Exploration • Successfully delivered a robust • The Ootsa project (Seel and Ox • Surge has made significant maiden PEA1 with base case porphyry deposits plus Seel Breccia inve

  12. Slide 12: Ootsa Project

    7 COPPER CORP Ootsa Project

  13. Slide 13: Ootsa Project

    Ootsa Project T WO PORPHYRY COPPER DEPOSITS | T OTAL M&I R ESOURCES OF 439M T 1 Favourable Location – Central B.C. Interior • The deposits at Ootsa are favourably located adjacent to Imperial Metals’ Huckleberry Mine & Mill complex • The project area has gentle rolling topography, a mild climate, an

  14. Slide 14: Significant Increase in Resources

    Significant Increase in Resources I NCREASE OF 96% IN M&I RESOURCE 1 Highlights • Approximately 50,000 metres of drilling completed since 2018 at Seel has significantly expanded mineralization in key areas, relative to the prior 2016 resource estimate • New drilling helped support a 96% increase in

  15. Slide 15: Regional Exploration

    Regional Exploration 14

  16. Slide 16: District Scale Exploration Opportunity

    District Scale Exploration Opportunity L ARGE PIPELINE OF TARGETS IN ONE OF BC’ S MOST PROSPECTIVE COPPER DISTRICTS ✓2022 field program screened and advanced over 20 regional targets ✓Included approximately 15,300 metres of drill testing, ground geophysics, and surface mapping & sampling 0.40% West

  17. Slide 17: 2022 Regional Reconnaissance Program

    2022 Regional Reconnaissance Program W IDESPREAD SURFACE EXPLORATION COMPLETED ACROSS COMBINED O OTSA & B ERG PROPERTIES Highlights • 23 IP lines in 5 grids • 4,481 soil samples and 337 rock samples plus extensive surface mapping • Selected results: − Expension of Bergette Cu-Mo-in-soil anomaly to 2

  18. Slide 18: Recent Results: New Cu-Au Porphyry Potential at Seel

    Recent Results: New Cu-Au Porphyry Potential at Seel R ECENT DRILLING IDENTIFIED A NEW NEAR - SURFACE C U -A U TARGET JUST TO THE NORTH OF E AST S EEL Highlights • Holes S22-328 and 330 were drilled along the northern margins of the Seel Breccia East Zone (angled south) and encountered >100m interva

  19. Slide 19: Recent Results: New Silver Discovery at Blackjack

    Recent Results: New Silver Discovery at Blackjack V ERY LARGE AND HIGHLY ALTERED INTRUSTIVE CENTRE PROSPECTIVE FOR PM’ S AND WIDE OPEN FOR FURTHER DISCOVERY Highlights • Holes BJ22-01 was testing a large ZTEM anomaly and encountered a wide zone of Ag- Au-Pb-Zn mineralization in addition to 3 individ

  20. Slide 20: Recent Results: Bergette Porphyry Target

    Recent Results: Bergette Porphyry Target L ARGE - SCALE COPPER PORPHYRY TARGET APPROXIM ATELY 10 KM EAST OF THE B ERG DEPOSIT Highlights • Holes BTG22-01 (vertical) and 02 (angled to the northeast) were drilled from the same pad at Bergette, targeting updated geochemical, magnetic, and chargeability

  21. Slide 21: Corporate Info

    Corporate Info 20

  22. Slide 22: Capitalization

    Capitalization A LL - EQUITY CAP STRUCTURE Equity Capitalization1 Key Announcements over Last Twelve Months $0.25 Receipt of 2.5 Ootsa Berg Permit Basic Shares Outstanding 196.4M Resource and Start of Update M&I: Phase 2 Seel Breccia 439 Mt Exploration East 138m Market Cap $28.5M Program @ 0.94% Zn,

  23. Slide 23: Surge Team

    Surge Team C OMMITTED PROFESSIONALS WITH SIGNIFICANT EXPERIENCE IN OPERATIONS , EXPLORATION , AND M&A Management Team Board of Directors & Special Advisors Leif Nilsson | Chief Executive Officer & Director Christian Kargl-Simard | Non-Exec Board Chair Metallurgical engineer, mining executive and for

  24. Slide 24: Contact Info

    www.surgecopper.com TSXV:SURG LinkedIn: Surge Copper Corp +1 604 718 5454 info@surgecopper.com OTCQX:SRGXF Frankfurt: G6D2 Twitter: @SurgeCopper Contact Info 23

  25. Slide 25: First Nation Involvement

    First Nation Involvement S URGE ’ S EXPLORATION PROGRAMS AND WORK FORCE HAVE BENEFITED IMMENSELY FROM F IRST N ATION SUPPORT & PARTICIPATION Our Approach Cheslatta Carrier Nation members have been regularly employed at the Ootsa Project, providing exploration • Open communication and engagement rega

  26. Slide 26: ESG a Driver of Long-Term Value Creation

    ESG a Driver of Long-Term Value Creation I NCREASED FOCUS ON ESG RESPONSIBILITIES , OPPORTUNITIES , AND BEST PRACTICES Environmental Social Governance • Focused on project design • Field operations governed by up-to- • Oversight responsibility from opportunities to minimize carbon date policies incl

  27. Slide 27: Berg PEA Mine Plan

    Berg PEA Mine Plan S IMPLE , SIX - PHASE OPEN PIT PLAN USING OWNER OPERATED FLEET Overview Mine Plan Physicals • Conventional drill-blast-load-haul open pit 120 100 Mined Material (Mt) • Six engineered phases based on LG shells to ultimate pit 80 allows better access to high grade material and low g

  28. Slide 28: Process Flowsheet

    Process Flowsheet C ONVENTIONAL SULPHIDE FLOTATION AND MOLYBDENUM SEPARATION FLOWSHEET Cu-Mo ROUGHER FLOTATION DUMP POCKET Cu-Mo REGRIND Cu-Mo CLEANER CYCLONE TAILINGS FLOTATION PRIMARY CRUSHER Cu CONCENTRATE OVERLAND THICKENER CONVEYOR Mo ROUGHER Cu-Mo SCAVENGER FLOTATION CONCENTRATE STOCKPILE Cu C

  29. Slide 29: Opex Buildup

    Opex Buildup T OTAL ON - SITE UNIT OPERATING COSTS OF C$10.66/ T MILLED Overview Operating Cost Esimates On-site Unit Operating Costs • Processing, mining, and G&A operating costs built up from first principles basis using recent benchmark data with Mining* C$/t mined $2.40 certain items having quot

  30. Slide 30: Capex Buildup

    Capex Buildup T OTAL PRE - PRODUCTION CAPEX OF C$2.0 BILLION Overview Capital Cost Esimates • Capital cost estimate developed by Ausenco based on EPCM Initial Capital (C$mm) approach to development Mine Pre-stripping $143 • Approach makes maximum use of in place infrastructure Mining Equipment Down

  31. Slide 31: Berg Option Agreement

    Berg Option Agreement S UMMARY OF KEY TERMS • Definitive Option Agreement with Thompson Creek Metals Company Inc., a subsidiary of Centerra Gold Inc. Option Agreement • Option to acquire a 70% interest in the Berg property • Five year option period ending December 2025 • Initial grant to Centerra of

  32. Slide 32: Berg Mineral Resources (2023)

    Berg Mineral Resources (2023)1 P IT - CONSTRAINED USING C$8.50/ T NSR CUT - OFF Grade Gross Contained Metal C$8.50/t NSR Cut-off Tonnage NSR/t Cu Mo Ag Au Cu Mo Ag Au (Mt) (C$/t) (%) (%) (g/t) (g/t) (Mlbs) (Mlbs) (Moz) (koz) Supergene Measured 14 $43.03 0.39 0.03 5.6 0.04 120 8 3 18 Indicated 227 $3

  33. Slide 33: Ootsa Mineral Resources (2022)

    Ootsa Mineral Resources (2022)1 P IT - CONSTRAINED USING C$8.27/ T NSR CUT - OFF Grade Gross Contained Metal Tonnage Cu Mo Au Ag Cu Mo Au Ag (Mt) (%) (%) (g/t) (g/t) (Mlbs) (Mlbs) (Moz) (Moz) Seel Measured 103.7 0.19 0.014 0.15 2.6 440 32 0.5 8.7 Indicated 276.1 0.16 0.017 0.12 2.0 974 105 1.1 18.2

  34. Slide 34: End Notes

    End Notes ✦ All references to copper equivalent (“CuEq”) are on the basis of recovered or payable metals, as indicated, with such recovered or payable metals converted into copper equivalent based on their respective price ratios using long-term metal prices assumptions of US$4.00/lb Cu, US$15.00/lb

Surge Copper — Investor Presentation (June 2023) on 6ix