Royal Bafokeng Platinum Ltd

Royal Bafokeng Platinum — RMB Morgan Stanley Off Piste Conference 2013

24 slides from Royal Bafokeng Platinum's conference presentation, October 2013

  1. Slide 1: RMB Morgan Stanley Off Piste Conference – Cape Town

    Slide 1: RMB Morgan Stanley Off Piste Conference – Cape Town

    RMB Morgan Stanley Off Piste Conference – Cape Town October 2013

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer The information presented in this presentation is of a general nature and the forward looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im

  3. Slide 3: About RBPlat

    Slide 3: About RBPlat

    About RBPlat RBPlat Investor presentation – October 2013 > PAGE 3

  4. Slide 4: About Royal Bafokeng Platinum (RBPlat)

    Slide 4: About Royal Bafokeng Platinum (RBPlat)

    About Royal Bafokeng Platinum (RBPlat) > Black-owned and controlled, mid-tier PGMs producer • Compliant with and exceeds the 2014 BEE Mining Charter requirements • Community owned at 56.6% by Royal Bafokeng Nation (RBN) • Supportive and well capitalised shareholders • SLP projects aligned with devel

  5. Slide 5: Quality resource with attractive prill splits

    Slide 5: Quality resource with attractive prill splits

    Quality resource with attractive prill splits 100% Inclusive Resource RBPlat 67% Description Mt 4E g/t 4E Moz Mt 4E g/t 4E Moz BRPM Merensky Merensky 4.23% 4.32% Measured 14.96 7.58 3.64 10.02 7.58 2.44 Indicated 7.66 6.97 1.72 5.13 6.97 1.15 Pt% Inferred 7.81 8.03 2.02 5.23 8.03 1.35 Pd% Merensky T

  6. Slide 6: Quality high-grade resource

    Slide 6: Quality high-grade resource

    Quality high-grade resource 300 Resource versus production Bubble size = 4E PGM production 250 Zimplats Lonmin 200 Resource size (Moz 4E) Impala LA Amandelbult 150 Rustenburg Zondereinde 100 Bokoni Modikwa BRPM JV 50 (pre and post Union Styldrift I) Marula 0 2 3 4 5 6 7 BRPM JV – Pre Styldrift I Sou

  7. Slide 7: Long-term shallow depth mining

    Slide 7: Long-term shallow depth mining

    Long-term shallow depth mining 0 Metres below surface (mbs) 500 1 000 1 500 2 000 Source : SFA Oxford 2 500 South Africa: 2020 South Africa: 2010 > RBPlat has high quality Merensky assets at shallow 13% depth 31% 33% • BRPM – 500m 18% 35% • Styldrift I – 740m 19% Styldrift I • Industry new shafts av

  8. Slide 8: Long-term Merensky bias

    Slide 8: Long-term Merensky bias

    Long-term Merensky bias > Industry : 2000 vs 2012 • Merensky resource depletion - contribution declined from 70% to 30% • Average head grade reduced by ±40% • Platinum production per employee reduced by ±40% 2000 MERENSKY (70%) UG2 (30%) 2012 MERENSKY (30%) UG2 (70%) Source : Chamber of Mines – 21 J

  9. Slide 9: Competitive position on the industry cost curve

    Slide 9: Competitive position on the industry cost curve

    Competitive position on the industry cost curve J.P. Morgan Cazenove Platinum Industry Break-even Analyser (cash cost + SIB) Mechanised operations Source: J.P. Morgan Cazenove – 25 September 2013 RBPlat Investor presentation – October 2013 > PAGE 9

  10. Slide 10: Broad business strategy

    Slide 10: Broad business strategy

    Broad business strategy > Maximise existing assets • Operational flexibility • Cost management • Sustainability and continuity > Grow organically • Styldrift I – Steady state production 2019 • Styldrift II – Complete study program by 2016 > Opportunistically pursuing value-enhancing opportunities •

  11. Slide 11: Our operations

    Slide 11: Our operations

    Our operations RBPlat Investor presentation – October 2013 > PAGE 11

  12. Slide 12: Well-established shallow Merensky producer

    Slide 12: Well-established shallow Merensky producer

    Well-established shallow Merensky producer on Western Limb with well-developed infrastructure > 14 years of operation • Well-understood, defined geology • Well-established mining platform • Experienced management team • Full mining and concentrating infrastructure on BRPM site (200ktpm) > Shallow de

  13. Slide 13: RBPlat H1 2013 performance

    Slide 13: RBPlat H1 2013 performance

    RBPlat H1 2013 performance Safety Description Units 2013 2012 Var Var % • LTIFR and SIFR improved by 8% and 2% respectively Fatal injuries No 1 1 0 - • 2.0 million fatality-free shifts achieved 2nd April Safety - LTIFR /200 000 0.61 0.67 0.06 8% Safety – SIFR /200 000 0.32 0.32 0.05 2% Production To

  14. Slide 14: Styldrift I Project progress

    Slide 14: Styldrift I Project progress

    Styldrift I Project progress Progress Description Unit Plan Actual Var Progress > Service shaft sink to 642 level Overall progress % 31.2 32.2 1.0 > Main shaft sink to 708 level Main shaft sinking m 708 708 - Service shaft sinking m 642 642 - > 603m of lateral development completed in H1 2013 Expend

  15. Slide 15: Styldrift project progressing to plan

    Slide 15: Styldrift project progressing to plan

    Styldrift project progressing to plan Main shaft rock winder: Service Shaft Main Shaft 600 Level – Reef Level 642 Level – Top of Silo Silo no. 1 708 Level – Loading Level Station cutting: 708 level Shaft bottom ramp Progress PTD # Sinking and raise-boring H2-2013 600L Development H2-2013 642L Develo

  16. Slide 16: Styldrift concentrator options being investigated

    Slide 16: Styldrift concentrator options being investigated

    Styldrift concentrator options being investigated Styldrift standalone concentrator > RBPlat internal ore processing: • Standalone 230ktpm concentrator plant at Styldrift • Feasibility study completed in August 2013 • Investigate upgrading the existing BRPM concentrator to accommodate Styldrift Mere

  17. Slide 17: Styldrift II study work progressing well

    Slide 17: Styldrift II study work progressing well

    Styldrift II study work progressing well Key facts > Resource area ± 24 million m2 > 40% of BRPM JV resource base > Average depth 1,150m @ ave. 90 dip > Underlain by the Swartklip Facies Studies > Concept study completed in May 2012 Approximate SD II # > Pre-feasibility study in progress (completion

  18. Slide 18: Funding requirements

    Slide 18: Funding requirements

    Funding requirements RBPlat Investor presentation – October 2013 > PAGE 18

  19. Slide 19: Spending to grow

    Slide 19: Spending to grow

    Spending to grow BRPM JV capital cashflow 3 500 200 225 3 000 192 214 2 500 175 2 000 R’million 228 1 500 238 201 2 843 2 915 146 98 1 000 229 379 308 1 655 378 500 728 490 638 646 0 Expansion Replacement SIB Expansion capital > Styldrift I expenditure for 2013 is forecast at R728 million > R300 mil

  20. Slide 20: Strong cash flow generation

    Slide 20: Strong cash flow generation

    Strong cash flow generation Surplus cash flow of R88 million after all capital expenditure 1600 535.4 (49.0) (85.0) 1400 (311.9) 1200 0.4 (1.5) (6.8) 992.1 1000 910.5 R’million 800 RBPlat 622.2 RBPlat 600 599.4 400 200 BRPM JV BRPM JV 311.1 369.9 0 Cash and cash Cash generated SIB Capex Replacement

  21. Slide 21: Funding of Styldrift I

    Slide 21: Funding of Styldrift I

    Funding of Styldrift I > R992.1 million cash on hand (BRPM JV R369 million – 67% attributable to RBPlat) > R1 billion unutilised Revolving Credit Facility > R458 million Working Capital Facilities • R152.5m utilised for Eskom, Rehab & Rental Guarantees • R200m utilised for Employee Housing Project •

  22. Slide 22: Investment case

    Slide 22: Investment case

    Investment case RBPlat Investor presentation – October 2013 > PAGE 22

  23. Slide 23: A compelling investment

    Slide 23: A compelling investment

    A compelling investment > Long-term Merensky bias production • In excess of 60 years life-of-mine > Shallow mines, average mining depth • 400m at BRPM • 661m at Styldrift > Attractive margin operations with scope for cost reduction > Competitive position on industry cost curve > Focused stakeholder

  24. Slide 24: Contact details

    Slide 24: Contact details

    Contact details Lindiwe Montshiwagae Investor Relations Manager Royal Bafokeng Platinum The Pivot, No 1 Monte Casino Boulevard, Block C, Floor 4, Fourways, 2021 Tel: +27 (0) 10 590 4517 Fax: +27 (0) 86 219 5131 Mobile: +27 (0) 82 920 7803 Email: lindiwe@bafokengplatinum.co.za www.bafokengplatinum.co