Atomic Eagle Ltd · ASX:AEU

Atomic Eagle — Investor Presentation (March 2022)

13 slides from Atomic Eagle's investor presentation, Mar 30, 2022

  1. Slide 1: March 2022 Company Presentation

    Tombador Iron Limited ABN: 20 108 958 274 Suite 5, 85 Forrest Street Cottesloe WA 6011 30 March 2022 ASX ANNOUNCEMENT March 2022 Company Presentation Tombador Iron Limited (ASX:TI1) (the “Company”) is pleased to announce that Executive Director, Stephen Quantrill, will be presenting on behalf of the

  2. Slide 2: Global Iron Ore & Steel Forecast Conference

    Global Iron Ore & Steel Forecast Conference 30 March 2022| ASX: TI1 >65%Fe | Iron Ore Lump and Fines 1

  3. Slide 3: Disclaimer

    Disclaimer These presentation materials have been prepared by the Company ("Tombador Iron Limited”). These Presentation Materials contain descriptive materials and other data relating to future events. These Presentation Materials are being delivered to certain parties with the understanding that th

  4. Slide 4: Brazil's Highest Quality Lump Iron Ore Producer

    Brazil’s Highest Quality Lump Iron Ore Producer 100% project ownership Brazil: low risk mining jurisdiction Exceptional high-grade hematite Ave grade of product sold to date is >65%Fe Price Premium & returns focused Existing road links & port access Local Infrastructure including towns, communicatio

  5. Slide 5: Project Achievements

    Project Achievements Significant achievements made since relisting in October 2020 √ Construction through to Operations March 2022 PFS supports maiden Ore July 2021 √ Fast-tracked production start-up, Reserve Maiden Shipment with construction ahead of time and under-budget May 2021 √ Ramp-up product

  6. Slide 6: ESG

    Premium Grade Mining with Social Responsibility High grade iron ore improves steel mill BF productivity, and reduces energy consumption and carbon emissions Quality of Water Road safety (Dry processing) campaigns Noise Daily safety Monitoring briefings Consistent Air Quality Measurement Local road m

  7. Slide 7: Current Mineral Resource and Ore Reserve

    Current Mineral Resource1 and Ore Reserve4 Combined JORC Resource of 10.05Mt, comprising:  7.99Mt of high-grade hematite, and Classification Tonnes (Mt) Fe (%) SiO2 (%) Al2O3 (%) Measured2 1.94 67.04 1.95 0.47 Mineral Resource Indicated2 3.47 67.30 1.65 0.56 JORC Classification Inferred2 2.58 67.48

  8. Slide 8: Simple Mining Operation

    Simple Mining Operation Production → 345k wmt of lump and 268k wmt of fines produced up to 20 March 2022 → Tombador is an open pit mine with a short down-hill haul → Simple processing: crush and screen (with no tailings) → PFS confirms project strengths1 → Planned production target of 1.2mtpa → Cont

  9. Slide 9: Marketing – World Class Hematite Product

    Marketing – World Class Hematite Product Lump Sinter Fines Sales & Marketing Iron 65-66% 65% → Tombador's lump quality is arguably the finest Silica 2.0% 3.0% in the world Alumina 0.5% 0.6% → Excellent chemistry → Low levels of deleterious minor & trace Phosphorus 0.08% 0.09% elements Sulphur <0.01%

  10. Slide 10: Export Sales and Brazil Domestic Sales

    Export Sales Brazil Domestic Sales July 2021 to February 2022 July 2021 to February 2022 → Six export shipments of high-grade iron → Internal market sales build-out underway ore made to date totaling 224k wmt → Tombador has the right to sell directly to → Average lump grade of Fe 65.60% domestic cus

  11. Slide 11: Board and Management

    Board and Management Proven expertise in Brazil mining, logistics, marketing and finance ANNA NEULING STEPHEN QUANTRILL KEITH LIDDELL DAVID CHAPMAN NON-EXECUTIVE CHAIRMAN EXECUTIVE DIRECTOR NON-EXECUTIVE DIRECTOR NON-EXECUTIVE DIRECTOR 15 years of experience in Chartered engineer with 20+ Experience

  12. Slide 12: Contacts

    Contacts Stephen Quantrill Executive Director Tombador Iron Limited Perth, Western Australia T: +61 (8) 6382 1805 M: +61 (0) 408 924 230 E: stephen.quantrill@tombadoriron.com Bill Moody Marketing & Business Development Tombador Iron Limited Perth, Western Australia M: +61 (0) 417 930 162 E: william.

  13. Slide 13: Thank you

    Thank you >65%Fe | Iron Ore Lump and Fines

Atomic Eagle — Investor Presentation (March 2022) on 6ix