Ptr Minerals Limited · ASX:PTR

Ptr Minerals — Petratherm — Corporate Update (October 2012)

24 slides from Ptr Minerals's corporate update, Oct 23, 2012

  1. Slide 1: Company Update Presentation

    ASX Release PETRATHERM LIMITED ABN 17 106 806 884 For personal use only Company Update Presentation The attached power point presentation provides an update on the Company’s activities and projects. The presentation covers the Company’s flagship Paralana project, its Tenerife project and the new Cle

  2. Slide 2: Exploring for Geothermal Energy

    Company Update For personal use only Exploring for Geothermal Energy October 2012

  3. Slide 3: Disclaimer and competent persons statement

    Disclaimer and competent persons statement For personal use only Disclaimer In particular, they speak only as of the date of this To the extent permitted by law, Petratherm and its This presentation has been prepared by Petratherm document, they assume the success of officers, employees, related bod

  4. Slide 4: Petratherm overview – leading explorer/developer

    Petratherm overview – leading explorer/developer For personal use only Listed ASX : PTR MADRID & BARCELONA › Shares on Issue: 148.8 million Direct use heat, EGS & › Share Price: $0.029 (October 22) hydrothermal › Market Cap: $4.31 million › Cash Position:$1.3 million (June 30) CHINA › Shareholders:

  5. Slide 5: Our business model – consistent and robust

    Our business model – consistent and robust “To explore for and develop low emission energy For personal use only projects that are commercially attractive” › Unlock Paralana’s vast geothermal resources value through demonstration of viable power production. › Develop a portfolio of quality geotherma

  6. Slide 6: Our board – track record of success

    Our board – track record of success For personal use only Board Skills and capabilities to achieve our objectives › Financial Management › Legal › Marketing Derek Carter Simon O’Loughlin Richard Hillis › Project Management Chairman Director Director › Corporate Governance › Exploration and Developme

  7. Slide 7: Resource Development Model – HEWI and FABBI

    Resource Development Model – Heat Exchanger Within Insulator (HEWI), and Fractures at Basin-Basement Interface (FABBI) For personal use only Targeting Fracture Permeability in › Mesoproterozoic metasediments - bedding / joint surfaces (HEWI model) › Fracture Permeability at Basin / Basement Interfac

  8. Slide 8: Petratherm Project Areas

    Petratherm Project Areas For personal use only (JV with Beach Energy)

  9. Slide 9: Project Milestones

    Project Milestones › For personal use only Drilled Paralana 2 to depth 4003m (G.L. A.H.D.)  › Confirmed optimum bottom hole temperatures ~ 190oC at 4000m  › High pressure geothermal brines intersected and natural fractures intersected from 3680m – may assist flows  › Fracture stimulation produced

  10. Slide 10: Paralana Independent Resources Statement – Nov 2011

    Paralana Independent Resources Statement – Nov 2011 For personal use only Depth Interval Inferred (PJth) Indicated (PJth) Measured (PJth) Total (PJth) (metres) <3,500 2,400 1,100 3,500 3,500 - 4,000 4,900 4,400 41 9,300 4,000 - 4,500 5,900 5,700 12,000 4,500 - 5,000 6,900 6,700 14,000 Total (PJth) 2

  11. Slide 11: Paralana Project Next Steps

    Paralana Project Next Steps For personal use only › Project has followed clear plans and milestones with N spend tightly managed by JV to ensure value for partners, government and PTR shareholders. › Next step is to drill Paralana 3 deep producer well, perform large scale fracture stimulation works,

  12. Slide 12: Commercialization Path

    Commercialization Path For personal use only › Initial 3.5MW off-grid pilot plant to Beverley Mine (11 kms away). › Growing up to 30 MW to meet off- grid needs. › Long term path for large scale geothermal (300MW+) via the Clean Energy Precinct (gas, wind and solar), that aims to secure the large gro

  13. Slide 13: HEWI and FABBI Resource Development Models

    HEWI and FABBI Resource Development Models – Optimizing Temperature, Drilling Costs and Flow! For personal use only  HEWI Targets Working in Sediment rather than Granite:  Lower drilling costs (depth and rock hardness)  Shallower depth (temperature gradients normally higher in sediment than grani

  14. Slide 14: Extraction model for a pumped EGS well

    Extraction model for a pumped EGS well Sanyal (Geothermex) et. al. 2007* Net MW Capacity of a Pumped Well vs Temperature For personal use only independent expert paper reports : (Binary Cycle Power Generation)  Standard industry pump operating Source: Sanyal et. al. (2007) temperature limit is ~ 19

  15. Slide 15: Paralana - Project Funding

    Paralana - Project Funding › Next stage of works budgeted at around $26 million For personal use only › Covers drilling Paralana 3, fracture stimulation and demonstration of commercial flows. This work is the immediate precursor to building a 3.5 MW pilot plant. › Petratherm has lodged a $13 million

  16. Slide 16: Key Milestones for the Paralana Geothermal Project

    Key Milestones for the Paralana Geothermal Project For personal use only Paralana JV project planned milestones  1st Qtr 2011: Main fracture stimulation   3rd Qtr 2011 : Flow test   2nd half 2013: drilling of the Paralana 3 deep producer well  Early 2014: Large scale hydraulic stimulation work

  17. Slide 17: Clean Energy Precinct

    Clean Energy Precinct For personal use only  Plan to deliver 600 MW into a large growth market driven by Mining Developments  It is the only site where Gas, Wind, Solar and Geothermal Converge  Key enabler for delivery of large scale geothermal energy into the SA Power Grid  Exclusive access to

  18. Slide 18: Preliminary Resource Assessment Summary for Precinct

    Preliminary Resource Assessment Summary for Precinct › For personal use only BOM data suggests solar resource 20 MJ/m²/day or (5kWh/m²/day). GH confirms it as an excellent solar resource  › Expect competitive gas supply contract availability from Moomba producers  › Expect sufficient gas pipeline

  19. Slide 19: Clean Energy Precinct - Preliminary Wind Assessment

    Clean Energy Precinct - Preliminary Wind Assessment For personal use only  Preliminary wind assessment for a 150MW and 300MW wind farm by Garrad Hassan (GH) – world’s leading wind consultants  Wind speeds in northwest area is assessed as being 7 x to 8 metres/sec at 100 metre height  Capacity fac

  20. Slide 20: Canary Islands Projects

    Canary Islands Projects For personal use only Tenerife and Gran Canaria – licences awarded La Palma – licence application being assessed

  21. Slide 21: Tenerife - Primary drill target

    Tenerife - Primary drill target For personal use only Possible Drill site Schematic of the Geothermal System  Geochemistry suggests a liquid dominated system and temperatures up to 240 oC beneath the volcanic dome  Proposed test well to the base of the conductive layer – “the clay cap” at approxim

  22. Slide 22: Petratherm's Five Key Areas of Differentiation

    Petratherm’s Five Key Areas of Differentiation For personal use only 1. Business model  Project selection – clearly filtered through resource, market and permitting  JV partners with complementary skills/capabilities, funding capacity and risk appetite  Project viability is project specific and a

  23. Slide 23: Petratherm's Five Key Areas of Differentiation

    Petratherm’s Five Key Areas of Differentiation For personal use only 4. Extraction model for EGS  Optimization of key parameters for a pumped EGS geothermal well – drill depth/cost, temperature and target flow (HEWI) – technically valid/optimal approach*  Focus on utilizing known and standard tech

  24. Slide 24: For personal use only

    For personal use only

Petratherm — Corporate Update (October 2012) on 6ix