  1. Slide 1: Barruecopardo Tungsten Project

    Slide 1: Barruecopardo Tungsten Project

    ORMONDE MINING ‐ AGM 2015 Presentation BARRUECOPARDO TUNGSTEN PROJECT 31 July 15

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    ORMONDE MINING Disclaimer The content of this document has not been approved by an authorised person within the meaning of the Financial Services and Markets Act 2000 (as amended). Reliance on this document for the purpose of engaging in any investment activity may expose an individual to a signific

  3. Slide 3: Operations – Low risk…

    Slide 3: Operations – Low risk…

    Operations – Low risk…  Simple Mining: Open‐pit, contract mining, utilising and benefiting from experienced mining contractors in the region  Simple Processing: Simple gravity processing provides for a plant (1.1mtpa) that can operate efficiently and with added benefit of ~40% spare capacity  Env

  4. Slide 4: Capex and Opex – Low Cost...

    Slide 4: Capex and Opex – Low Cost...

    Capex and Opex – Low Cost... Barruecopardo Project Capex EURm  DFS (Jacobs, 2012) reported project development Plant Engineering & Construction 32.5 Capex of €48.5M (including contingency) and Opex of €99.2 per mtu Project Services (land, power‐line, fencing, etc..) 4.5  Basic engineering design b

  5. Slide 5: Global production cost curve – Low end…

    Slide 5: Global production cost curve – Low end…

    Global production cost curve – Low end… Global tungsten production cost curve, 2014 ($/mtu WO3) Barruecopardo production cost % of total output - cumulative Source: Argus Media Ltd, February 2015 5

  6. Slide 6: Price trough – Good time to develop

    Slide 6: Price trough – Good time to develop

    Price trough – Good time to develop US$/mtu for European APT $500 $450 $400 $350 Chinese domestic demand increases and Weakening commodity export quotas coming into effect price environment $300 $250 Price rebound after GFC, plus stockpiling $200 $150 $100 $50 * Argus Media Supply Concerns  EU decl

  7. Slide 7: Project preparation

    Slide 7: Project preparation

    ORMONDE Project preparation MINING – Pieces in place Oaktree Funding Package Feasibility Metallurgical Study Mining Testwork Concession Community Environmental Political Permit Reserves Support Support Land Environment Drilling Acquisition Baseline Resources Process Studies 7

  8. Slide 8: Oaktree funding – Comprehensive and flexible

    Slide 8: Oaktree funding – Comprehensive and flexible

    Oaktree funding – Comprehensive and flexible Comprehensive Funding Package  USD 99.7 million package, split favourably ‐ large component of equity USD 44.2 million and project debt USD 55.5 million  Package secures Barruecopardo’s full funding requirement plus a significant budget to conduct the e

  9. Slide 9: Oaktree funding – Dilution minimisation

    Slide 9: Oaktree funding – Dilution minimisation

    Oaktree funding – Dilution minimisation Minority Protection and Management Fee  A number of important decisions requiring the consent of both parties provide minority protections for Ormonde  Ormonde will receive an annual management fee of €1.0 million covering Ormonde’s current working capital r

  10. Slide 10: Project Timeline – Rapid advancement

    Slide 10: Project Timeline – Rapid advancement

    Project Project timeline Outline –Rapid Timeline advancement H2 2015 H1 2016 H2 2016 PLANT ENGINEERING & CONSTRUCTION Detailed Engineering Procurement Construction & Installation Commissioning LAND Rental and Expropriation WATER MANAGEMENT Construction and Pit de‐watering MINING PREPARATION Mining &

  11. Slide 11: 2015 Q3 – Busy time ahead

    Slide 11: 2015 Q3 – Busy time ahead

    2015 Q3 – Busy time ahead  Freeze site layouts and process flow diagrams  Place priority 1 equipment orders  Negotiate construction management contract  Finalise purchase of rented lands  Advance land expropriation  Place first environmental bond  Obtain urban planning license  Obtain water

  12. Slide 12: Mine life – Clear potential to extend

    Slide 12: Mine life – Clear potential to extend

    Mine life – Clear potential to extend  Current open pit captures only ~40% of the current total Resources  Current drilling limited to an average of 250m below surface 12

  13. Slide 13: Value adding

    Slide 13: Value adding

    Value adding  Objective of extending the currently defined 9 year mine life, through drilling programme  Aim to achieve early evaluation of potential Stage 2 underground extension  Thereafter, investigate licence areas in the vicinity of the Barruecopardo Mine  Licences include many areas of his

  14. Slide 14: Ormonde Mining - Focused

    Slide 14: Ormonde Mining - Focused

    Ormonde Mining ‐ Focused Focused on  Shareholder Value  Bringing Barruecopardo Project online on budget and on time  Aggressively growing the value of the Barruecopardo asset 14

  15. Slide 15: Barruecopardo Tungsten Project

    Slide 15: Barruecopardo Tungsten Project

    ORMONDE MINING ‐ AGM 2015 Presentation • Project Permitted • Project Funded • Project Upside BARRUECOPARDO TUNGSTEN PROJECT July 2015 15