Ormonde Mining Plc · AQUIS:ORM

Ormonde Mining — Investor Presentation (March 2017)

21 slides from Ormonde Mining's investor presentation, March 2017

  1. Slide 1: Barruecopardo Tungsten Project

    ORMONDE MINING BARRUECOPARDO TUNGSTEN PROJECT • Project Permitted • Project Funded • Project Upside Mar 2017 1

  2. Slide 2: Disclaimer

    ORMONDE MINING Disclaimer The content of this document has not been approved by an authorised person within the meaning of the Financial Services and Markets Act 2000 (as amended). Reliance on this document for the purpose of engaging in any investment activity may expose an individual to a signific

  3. Slide 3: Company snapshot

    Company snapshot Ormonde in brief Significant shareholders Shareholder % (Mar 2017)  Listed in Dublin (ESM) and London (AIM) with a market M&G Investment Management 8.97% capitalisation of ~ £6.7M* Thomas Anderson 8.68%  Ticker = ORM Rathbone Brothers plc 4.98% Directors & Families 2.88%  Issued

  4. Slide 4: Tungsten

    Tungsten Tungsten (chemical symbol W) is a metal with outstanding properties:  Highest melting point (3,400°C) and tensile strength of all metals  Second strongest material after diamond  Unique properties and limited substitutability makes tungsten critical for many industries (including automot

  5. Slide 5: Price trough – Good time to be developing

    Price trough – Good time to be developing 2 1 3 4 Source: Metal Bulletin 1. Chinese domestic demand increases and export quotas coming into effect 2. Price rebound after GFC, plus stockpiling 3. General weakening of commodity price environment 4. Destocking, plus rising demand some sectors 5

  6. Slide 6: Supply and demand

    Supply Supply and and demand demand Supply Side - Tightening Demand Side - Growth  China: Restrictions on new mine permits  Growth in primary W demand correlates closely to global GDP growth  China: Higher costs, lower grade, deeper mining  Global GDP growth estimated 3.4% for 2017 rising to 3.6

  7. Slide 7: Project – Good location

    Location PROJECT – Good LOCATION infrastructure 7

  8. Slide 8: Operations – Low risk

    Operations – Low risk  DFS Completed, Permits & Funding in place, Land access achieved: Initial 9 yr mine life (2,600t WO3 or 260,000 mtu/year steady state) Environmental and Mining Permits in place Access achieved to all lands required to commence  Simple Mining: Open-pit, contract mining, utilis

  9. Slide 9: Capex and Opex costs - Exceptional

    Capex and Opex costs - Exceptional Project Capex Project Opex EURm Project Opex USD/mtu EUR/mtu % Plant Engineering & Construction Mining (Ore) 19.1 17.4 17% 32.5 Project Services (land, power-line, etc.) Mining (Waste)* 70.4 64.0 62% 4.5 Water Management Scheme Processing 18.7 17.0 16% 9.9 Mining P

  10. Slide 10: Oaktree project financing

    Oaktree project financing Comprehensive Funding Package  USD 99.7 million package, split favourably between - Equity US$ 44.2 million Debt of US$ 55.5 million  Ormonde retains 30% of a fully funded project, Oaktree 70% Flexible Debt Facility  Flexible repayment terms allow for: o cash to be retai

  11. Slide 11: Recent achievements – 2016 and Early 2017

    OnProject the moveOutline – Recent Timeline achievements Achievements – 2016 and Early 2017  Permissions: Water use license - Received  Land: Exercise of Land Option to Purchase Agreements – Completed  Land: Access to all lands under compulsory acquisition - Received  Engineering: Final geotechn

  12. Slide 12: On the move – On the ground activities

    OnProject the moveOutline – On Timeline the ground activities 12

  13. Slide 13: Project outline timeline

    Project Project outline Outline timeline Timeline H1 2016 H2 2016 H1 2017 H2 2017 H1 2018 H2 2018 PLANT ENGINEERING AND CONSTRUCTION Detailed Engineering Procurement Construction and Installation Commissioning LAND Compulsory Acquisition WATER MANAGEMENT Construction and Pit Dewatering MINING PREPAR

  14. Slide 14: Mineral Resources and Ore Reserves

    Mineral Resources and Ore Reserves Total Mineral Resources Category Tonnes (millions) Grade (WO3%) Contained WO3 (mtu) Measured 5.47 0.34 1.86 million Indicated 12.33 0.26 3.20 million Inferred 9.59 0.23 2.20 million Total 27.39 0.26 7.12 million Ore Reserves within the Open Pit Category Tonnes (mil

  15. Slide 15: Expansion potential - Significant

    Expansion potential - Significant Barruecopardo resource in red and open pit shell in blue – view looking upwards ( and west) towards ground surface Significant potential to extend life of mine, increase production:  Planned open pit captures only ~40% of current total Resources  Deposit open alon

  16. Slide 16: Expansion - 2000m drilling program completed May'16

    Expansion - 2000m drilling program completed May’16:  Aim: Confirm mineralisation extensions at depth beneath central part of planned pit, plus follow-up on potentially expanded zone under shallow Northern end of pit.  Key Results:  BAR83: 23m @ 0.26% WO3 from 172m and 5m @ 1.95% WO3 from 404m 

  17. Slide 17: Expansion potential – First results

    Expansion potential – First results Drill rig operating during drilling program Coarse grained tungsten mineralisation from recent drilling program Core logging during recent drilling program 17

  18. Slide 18: Expansion potential – Underground (stage 2)

    Expansion potential – Underground (stage 2) Conceptual Underground Access & Development 18

  19. Slide 19: Expansion potential - Satellites

    Expansion potential - Satellites Satellite Mineralisation on Mining Concession & Surrounding Permits 19

  20. Slide 20: Growth

    Growth Barruecopardo Growth Strategy 1. Deliver stable production based on the Barruecopardo DFS 2. Increase production and mine life through the investigation and evaluation of depth extensions to current resource with objective of establishing an underground (Stage 2) mine 3. Potential further exp

  21. Slide 21: Ormonde Mining - Focused

    Ormonde Mining - Focused Focused on  Shareholder Value  Bringing Barruecopardo Project online - on budget  Aggressively growing the value of the Barruecopardo asset  Actively seeking growth opportunities 21