Slide 1: Quality Management of Contracts: Vigilance Perspective
Container Corporation of India Ltd. Quality Management of Contracts Vigilance Perspective By: CVO 27th March 2015 Think Container Think CONCOR 1

Slide 2: What is Contract?
WHAT IS CONTRACT? According to Section 2 (h) of Indian Contract Act, 1872 – An agreement enforceable by law is a Contract Think Container Think CONCOR 2

Slide 3: Essential Aspects in a Contract
THERE ARE FOLLOWING ESSENTIAL ASPECTS IN A CONTRACT :- Offer Acceptance Consideration Legal Not minor, etc Think Container Think CONCOR 3

Slide 4: Why Contract?
WHY CONTRACT? For the purpose of managing activities at terminals, various contracts like H&T, Security, Survey, O&M, Conservancy etc. are executed. Think Container Think CONCOR 4

Slide 5: Types of Contract
TYPES OF CONTRACT Handling & Transportation of containers Handling of cargo Operation & maintenance of plants and equipment Security Survey Housekeeping & Conservancy Annual maintenance contracts Manpower supply Think Container Think CONCOR 5

Slide 6: Important Aspects of Contract Management
IMPORTANT ASPECTS OF CONTRACT MANAGEMENT Before commencement of contract - Discussion with Terminal Manager - Conditions to be framed in clear and cogent manner - Nothing to be left ambiguous Think Container Think CONCOR 6

Slide 7: Before Commencement of Contract: Examples
IMPORTANT ASPECTS OF CONTRACT MANAGEMENT Before commencement of contract Examples: Payment for Tiles – whether on the basis of Square Feet covered or number of Tiles supplied Conditions regarding Delayed Tenders Plantation of trees – Payment after two years , Height of tree, etc Think Containe

Slide 8: Preparation of Tender Document
PREPARATION OF TENDER DOCUMENT Problems noticed In one of the cases, it has been observed that Region has floated open tender for design, manufacture, supply and installation of four number of electrical distribution panel. Wherein as per clause 3.6 (Sl. No. 18) of Tender document, it was mentio

Slide 9: Tendering Process: Pre-bid Meeting
IMPORTANT ASPECTS OF CONTRACT MANAGEMENT Tendering process – Pre-bid Meeting - Technical specifications should be discussed with prospective bidders and mentioned clearly in tender document to avoid confusion - While reviewing the contract for procurement of RTGs, CVC has observed that tender spec

Slide 10: Award of Contract, Agreement and Security Deposit
IMPORTANT ASPECTS OF CONTRACT MANAGEMENT Award of contract (LOI), agreement and Security Deposit – All documents to be maintained at Terminal Problems noticed- Contract Agreement Documents are not available at various terminals. Think Container Think CONCOR 10

Slide 11: Inspection of Equipment/Vehicle and Documents
IMPORTANT ASPECTS OF CONTRACT MANAGEMENT Inspection of equipment/vehicle & documents – at the time of commencement of contract Necessary action for non-deployment as per contract Verification of RCs – Nagaland, other doubtful cases Problems noticed: During Preventive Check at one of the termin

Slide 12: During the Currency of the Contract
IMPORTANT ASPECTS OF CONTRACT MANAGEMENT During the currency of the contract: Vehicles for external movement: Issue of job order & compliance through ETMS Proper record of non-compliance & levy of damages Information to contractor regarding levy of damages Control on private movement Thi

Slide 13: Vehicles for External Movement
IMPORTANT ASPECTS OF CONTRACT MANAGEMENT Vehicles for external movement: Change of vehicle – Tender conditions (vintage/ownership,etc) to be followed Price revision – Revision of public tariffs in time Monitoring of encumbered vehicles Problems noticed: At some terminals, trailers deployed f

Slide 14: Vehicles for Internal Movement
IMPORTANT ASPECTS OF CONTRACT MANAGEMENT Vehicles for internal movement: Monitoring & record of breakdown (use of RDT, GPS, etc.) Levy of damages for excess breakdown Control on use of vehicle for other works Safety measures – Light, Brakes, Reverse Siren, Container Securing System, etc. P

Slide 15: Other Equipments (Reach Stackers, etc.)
IMPORTANT ASPECTS OF CONTRACT MANAGEMENT Other equipments (Reach Stackers, etc.): Proper record of breakdown, cooling, etc. (entry in ETMS) Record of damages to be levied Use of RDTs for capturing container movement Think Container Think CONCOR 15

Slide 16: Other Equipments: Spillage, Stack Management, Safety
IMPORTANT ASPECTS OF CONTRACT MANAGEMENT Other equipments (Reach Stackers, etc.): Oil spillage in operational area to be prevented Proper stack management to avoid payment for additional moves Safety measures to be ensured– Reverse siren, lights, etc. Think Container Think CONCOR 16

Slide 17: Other Equipments: Problem Areas
OTHER EQUIPMENTS (REACH STACKERS, ETC.): Problem Areas : Non-inspection of equipments before commencement of contract. Improper monitoring of performance parameter like breakdown etc. Think Container Think CONCOR 17

Slide 18: Security Contracts
SECURITY CONTRACTS As per DGR guidelines, 90% minimum ex-servicemen (discharged from Army, Navy & Air Force). Age not more than 65 years. Discharge Certificate. Arm’s License for Gunmen. Think Container Think CONCOR 18

Slide 19: Security Contracts
SECURITY CONTRACTS Insist on payment through account payee cheques Monitoring of payment for PF & ESI Ensure issue of uniform, etc. as per contract In case two agencies quote same service charge, contract may be awarded to the senior agency – details as per DGR website Think Container Think

Slide 20: Security Contracts
SECURITY CONTRACTS Seniority – as per date of empanelment with DGR Compensation for Weekly off/ Holidays/Reliever Proper monitoring of Muster Roll and Wage Register Details of Operational & Non- operational agencies may be verified from DGR website Think Container Think CONCOR 20

Slide 21: Problems Noticed in Security Contracts
PROBLEMS NOTICED IN SECURITY CONTRACTS Less deployment of manpower. During Preventive Check at one of the terminals, it was observed that signatures made in wage & Attendance register (s) by the security guards were different and not matching. Some of the Security Contractors are still paying

Slide 22: Circulars & Guidelines
Circulars & Guidelines Think Container Think CONCOR 22

Slide 23: Circulars & Guidelines
CIRCULARS & GUIDELINES All the relevant Circulars/ guidelines should be made available at the terminal. Circulate all policies, etc through Assurance Register, as per CMD’s instructions. Any ambiguity must be clarified from the competent authority. Think Container Think CONCOR 23

Slide 24: Guidelines for Strict Compliance
GUIDELINES FOR STRICT COMPLIANCE 1) Circulars issued by Corporate Office 2) System improvements issued by Vigilance Dept. and Regional offices 3) For reference - Hand book & Case Studies published and circulated by Vigilance Deptt. Think Container Think CONCOR 24

Slide 25: Speaking Order
SPEAKING ORDER Competent Authority should give Speaking Orders on various proposals, this is as per the CVC guidelines. Think Container Think CONCOR 25

Slide 26: Clarification of Doubts
CLARIFICATION OF DOUBTS Formation of Committee at regional level. Region should refer the case to C.O. in case of contracts under C.O.’s purview. Please refrain from drawing own conclusions (CMD’s order dtd. 11.10.2010). Think Container Think CONCOR 26

Slide 27: Thank You
Container Corporation of India Ltd. THANK YOU Think Container Think CONCOR 27
Source: Internet Archive copy of concorindia.com
More decks from Container Corporation of India Limited
Investor Presentation (August 2025)59 slides · Aug 25, 2025
Investor Presentation (June 2024)44 slides · Jun 4, 2024
Investor Presentation (January 2024)36 slides · January 2024
Non-Deal Roadshow (October 2022)35 slides · Oct 19, 2022
Investor Presentation (July 2018)18 slides · July 2018
Investor Presentation (2018)21 slides · 2018