Imagine Lithium Inc · TSXV:ILI
Imagine Lithium — Investor Presentation (October 2026)
17 slides from Imagine Lithium's investor presentation, October 2026
Slide 1: Corporate Presentation October 2026
CORPORATE PRESENTATION TSX-V:ILI | OTCQB:ARXRF www.imaginelithium.com OCTOBER 2026
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT This presentation is strictly confidential and any disclosure, use, copying and circulation of this presentation is prohibited without the consent of Imagine Lithium Corp. (“ILI” or “The Company”). The information contained in this presentation does not constitute or form part o
Slide 3: Regional Location
FOCUSED ON ADVANCING REGIONAL LOCATION THE JACKPOT LITHIUM PROJECT IN ONTARIO Large land package ~27,597 ha Nearby Infrastructure: Power, Roads/Highways, Railway, Workforce, Ports (Thunder Bay Port ~150 km, proposed Red Rock Port ~60 km) Planned Lithium Hydroxide Plants in Thunder Bay or Red R
Slide 4: Regional Geology
REGIONAL GEOLOGY Quetico subprovince of the Superior province (2.70 - 2.69 Ga) Wabigoon & Wawa granite- greenstone terranes to north & south Proterozoic Diabase Sills of Nipigon Basin to west Deformation includes regional shortening and dextral shearing Metamorphism, migmatization and late
Slide 5: Jackpot Resource Area
JACKPOT RESOURCE AREA Jackpot consists of a swarm of parallel, east-west trending lithium pegmatites Resource Estimate (Oct 2024) Metallurgical Testing predicts 6% Li2O with at least 75% recovery Jackpot Pit: 3.1 Mt indicated @ 0.85% Li 2O 2.2 Mt inferred @ 0.82% Li2O Casino Royale Pit: 3.
Slide 6: Mineral Resources Estimate
MINERAL RESOURCES ESTIMATE Pit Constrained MRE at 0.30% Li2O Cut-off Isometric view of Jackpot & Casino Royale pits with mineralized wireframes Li2O Classification Tonnes M Li2O % k tonnes Indicated 3.1 0.85 26.2 Inferred 5.3 0.91 49.5 Pit-Constrained MRE Sensitivity Indicated Inferred Li2O Cut-Off
Slide 7: Jackpot Resource Cross Section
JACKPOT RESOURCE CROSS SECTION Shallow drill depth <200 m Dykes dip shallow to the north Dyke swarms could be stacked north and south of current resources all resources are near-surface (<200m depth) and pit constrained TSX-V:ILI | OTCQB:ARXRF SLIDE 7 | imaginelithium.com
Slide 8: Ontario Lithium Projects Comparison
ONTARIO LITHIUM PROJECTS COMPARISON As of April 2026 ROCK TECH IMAGINE LITHIUM COMPANY (NI43-101) (NI43-101) Project Name Georgia Lake Jackpot Enterprise Value ~107.3M ~5.84M M&I: M&I: 10.60Mt @ 0.88% Li2O 3.1Mt @ 0.85% Li2O Resource Estimate INF: INF: 4.22Mt @ 1.0% Li2O 5.3Mt @ 0.91% Li2O Cut-off 0
Slide 9: Jackpot Exploration
JACKPOT EXPLORATION Infill drilling at Jackpot deposit to bring to Indicated category Resource expansion drilling at Casino Royale Exploration drilling: Peg 500 Extension Jackpot Southwest Blay Lake Zone Carrot Lake West Potential to grow existing resource pit and for additional para
Slide 10: Casino Royale Exploration
CASINO ROYALE EXPLORATION Resource expansion drilling at Casino Royale planned for 2026 Resource potential is open in all directions Drilling planned to test potential for additional resources outside the pit shell to the north and south Stepout drilling planned on JP- 24-40 to test 10m pegm
Slide 11: Ruth Pegmatite Exploration
RUTH PEGMATITE EXPLORATION Ruth pegmatite discovery ~25 km north on Gorge Creek Road discovered in fall 2024 with surface samples returning 1.67% and 2.56% Li2O Ruth pegmatite ~1 km north of the historic Foster-Lew occurrence Bedrock stripping exposed ~235 m of strike length in three areas
Slide 12: Ruth Pegmatite Exploration
RUTH PEGMATITE EXPLORATION Ruth dyke ranges from 2.9m to 7.7m wide in two, parallel and anastomosing dykes Bedrock stripping exposed 235m strike length Pegmatite zone in each channel ranges from 4.85m to 9.5m total intercept Fall 2025 highlights: RCH25-06: 1.34% Li2O/9.10m RCH25-05: 1.15%
Slide 13: Exploration Potential
EXPLORATION POTENTIAL Casino Royale resource expansion Ruth Pegmatite resource potential Peg 500 Extension South Jackpot Zone (soil anomaly with spodumene boulders) Blay Lake Zone (soil anomaly with spodumene boulders) Jackpot West Pegmatite SPOD Option ground west of Ruth Pegmatite TS
Slide 14: Jackpot Project Highlights
JACKPOT PROJECT HIGHLIGHTS RESOURCE ESTIMATE (oct 2024): Metallurgical Testing predicts 6% Li 2O with at least 75% recovery Jackpot Pit: 3.1 Mt indicated @ 0.85% Li2O 2.2 Mt inferred @ 0.82% Li2O Casino Royale Pit: 3.1 Mt inferred @ 1.00% Li2O All resources are near- surface (<200m depth) an
Slide 15: Management, Board & Advisors
MANAGEMENT, BOARD & ADVISORS Sze Man Suen Jason Arnold Sufan Siauw President, Director Exploration Manager, Director Director • 25+ years of business, executive • Professional geologist (PGO, • 25+ years of business, executive and board experience in the APEGS) and board experience resource sector o
Slide 16: Share Structure – Opportunity for Growth
SHARE STRUCTURE – OPPORTUNITY FOR GROWTH As of Oct 2026 MKT CAP ILI CAPITAL STRUCTURE COMPANY (C$M) LISTED PROJECT (JURISDICTION) RESOURCE/RESERVE (LI2O) STAGE Ind 3.1 Mt/0.85% Maiden SHARES OUTSTANDING 344,228,030 Imagine Lithium 5 TSX-V: ILI Jackpot (Thunder Bay, ON) Inf 5.3 Mt/0.91% resource (POS
Slide 17: Imagine Lithium Corp.
IMAGINE LITHIUM CORP. 1240-789 W. Pender St. Vancouver, BC V6C 1H2 1.807.355.5405 1.888.945.4770 info@imaginelithium.com www.imaginelithium.com TSX-V:ILI | OTCQB:ARXRF SLIDE 17 | imaginelithium.com
Imagine Lithium — Investor Presentation (October 2026) on 6ix