Imagine Lithium Inc · TSXV:ILI

Imagine Lithium — Investor Presentation (February 2023)

24 slides from Imagine Lithium's investor presentation, February 2023

  1. Slide 1: Growing Lithium Resources

    TSX.V:ILI OTCQB:ARXRF GROWING LITHIUM RESOURCES CORPORATE PRESENTATION – FEBRUARY 2023 TSX-V:ILI | OTCQB:ARXRF www.imaginelithium.com

  2. Slide 2: Cautionary Statement

    Cautionary Statement This presentation is strictly confidential and any disclosure, use, copying and circulation of this presentation is prohibited without the consent of Imagine Lithium Corp. (“ILI” or “The Company”). The information contained in this presentation does not constitute or form part o

  3. Slide 3: Who is Imagine Lithium Inc.?

    Who is Imagine Lithium Inc.? Exploration company focused on exploring and developing the Jackpot lithium project in Ontario Jackpot is located near Nipigon Ontario and is surrounded by infrastructure, including ports, electricity, and highways Led by skilled and qualified mineral exploration and bus

  4. Slide 4: Jackpot Lithium Project Location

    Jackpot Lithium Project Location  Located in proximity to the Great Red Rock Port Lakes and St-Lawrence Seaway (60 km) giving shipping access to: Jackpot Project  Process plants elsewhere in Thunder Bay Port (150 km) the world  Giga factories planned for southern Ontario  ~150 km from port of Th

  5. Slide 5: Jackpot Large Land Package

    Jackpot Large Land Package  Large property ~ 18,800 Ha  Main zone contains historical resource – Expansion Drilling Area Prospected to Date to Grow Resources  Most prospecting within 2 km Main Zone – Expansion Drilling of Main Zone  A number of sub-parallel spodumene baring pegmatite dikes have

  6. Slide 6: Jackpot Lithium Drill Programs

    Jackpot Lithium Drill Programs  2018 drilling focused on area of historical resources (2 Mt @ 1.09% Li2O)  2022 drilling expanded mineralized zone to the east by 400 m  Jackpot consists of a swarm of parallel lithium-bearing east-west trending dikes  Mineralized zone is open in all directions –

  7. Slide 7: Jackpot Deposit – Cross Section

    Jackpot Deposit – Cross Section  Relatively shallow drilling at <200 m  New modelling provides more orientation information  Dikes have a shallow dip to the north  Open down dip TSX-V:ILI | OTCQB:ARXRF SLIDE 7 | imaginelithium.com

  8. Slide 8: Jackpot Deposit – 3D Model

    Jackpot Deposit – 3D Model 3D Model Looking Approximately West • Expansion potential down dip (North) and at depth • Additional stacked dikes intercepted between main structures • Jackpot expansion potential to the east, west, and down dip Hole J-18-13: 5.0 m grading 3.02% 3D Model Looking Approxima

  9. Slide 9: Jackpot Drill Program

    Jackpot Drill Program Jackpot Air Photo  Expansion drilling at Jackpot Exposed Dike  Fall drilling is focusing on 12 m @ 1.3% Li2O in areas to the north/east channel sample  Test down dip extension Winter Drilling and new dikes near Targets surface Fall Drilling Targets  Drill fences will system

  10. Slide 10: Groundwork Identifying New Targets

    Groundwork Identifying New Targets  Prospecting has identified numerous spodumene-bearing pegmatite showings  Grab samples results indicate lithium concentrations – additional results pending New Drill Targets TSX-V:ILI | OTCQB:ARXRF SLIDE 10 | imaginelithium.com

  11. Slide 11: Jackpot Largely Unexplored

    Jackpot Largely Unexplored Historical Resource of 750 kt @ 1.38% in this area  Large portions of the property are yet to be explored  Numerous pegmatites historically identified in the east and south need prospecting  Lithium showings need follow- up  Newkirk-Vegan showing has a historical 750 k

  12. Slide 12: Regional Potential

    Regional Potential  High-Resolution Mag Survey flown  Multiple east-west trending regional structural features identified  Oriented parallel to several lithium-rich pegmatite dikes within the Jackpot lithium deposit Reginal Structures of Interest  Further exploration to the west and north requir

  13. Slide 13: Jackpot – Infrastructure is Key

    Jackpot – Infrastructure is Key  Infrastructure is readily Powerline – 9 km accessible Trans-Canada Highway – 12 km  Power Power plant – 13 km  Roads/Highways  Railroads  Workforce  Ports  Communications Railroad and workforce – 40 km Red Rock Port – 60 km TSX-V:ILI | OTCQB:ARXRF SLIDE 13 | i

  14. Slide 14: Jackpot Economic Potential

    Jackpot Economic Potential  Located ~15 km from Rock Tech Lithium’s Georgia Lake Project Rock Tech  Georgia Lake Pre-feasibility Georgia Lake  Open-pit & Underground  1 Mtpa Concentrator for 9 Years  To ship 6% concentrate from Thunder Bay  Reserves: 7.3 Mt @ 0.82% Li2O  Op Costs: US$73/t pro

  15. Slide 15: Jackpot Economic Factors

    Jackpot Economic Factors Georgia Lake Project (Based on PEA) Jackpot  M&I Resources 6.6 Mt @ 1.01%  Historical Resources 2 Mt @ 1.09% Li2O Li2O*  Resources increase by 56%  Drilling expanding historical at 0.4% cutoff resource  Underground operation planned  Internal modeling shows similar gra

  16. Slide 16: Jackpot – Primed For Growth

    Jackpot – Primed For Growth  Building on historical resource  Expanded mineralized zone by Historical Resources 400 m to the East and growing Powerline Expansion Drilling Exploration Drilling  Expansion drilling ongoing Highway  Numerous lithium showings to Power plant be sampled  Numerous pegm

  17. Slide 17: Jackpot Lithium Project in Ontario

    Jackpot Lithium Project in Ontario TSX-V:ILI | OTCQB:ARXRF SLIDE 17 | imaginelithium.com

  18. Slide 18: TSX-V:ILI | OTCQB:ARXRF SLIDE 18 | imaginelithium.com

    TSX-V:ILI | OTCQB:ARXRF SLIDE 18 | imaginelithium.com

  19. Slide 19: Supportive Jurisdictions

    Supportive Jurisdictions  Ontario Green Energy Plan  The Ford Government to position Ontario as a reliable supplier of critical minerals and unveils “five-year roadmap"  Announced $29 million in new government funding mostly earmarked to support junior exploration companies and creating a critica

  20. Slide 20: Management, Board & Advisors

    Management, Board & Advisors J.C. St-Amour Victor Cantore Dr. Michel Boily Arvin Ramos M.Sc., CFA Advisor PhD. CFO President, Director Technical Consultant Mr. Cantore is a seasoned Mr. Ramos holds a degree Mr. St-Amour has over 20 capital markets professional Dr. Boily is a Professional in commerce

  21. Slide 21: Management, Board & Advisors

    Management, Board & Advisors Dr. Jacques Trottier Gerhard Jacob Michael England Jonathan Gagné PhD, Advisor M.Sc. Director Eng., MBA Dr. Trottier holds a PhD in Director Mr. England has been Director economic geology from École Gerhard Jacob is a seasoned involved in the public Mr. Gagné has a B.Sc.

  22. Slide 22: Share Structure

    Share Structure As of January 2023 SHARES OUTSTANDING 220,553,030 WARRANTS 59,000,000 OPTIONS 6,975,000 FULLY DILUTED 286,528,030 TSX-V:ILI | OTCQB:ARXRF SLIDE 22 | imaginelithium.com

  23. Slide 23: Highlights

    HIGHLIGHTS  100% owned position in Jackpot Lithium Project  Building on historical resources  Near infrastructure and port of Thunder Bay TSX-V:ILI | OTCQB:ARXRF SLIDE 23 | imaginelithium.com

  24. Slide 24: Imagine Lithium Corp.

    TSX.V:ILI OTCQB:ARXRF IMAGINE LITHIUM CORP. 1240-789 W. Pender St. Vancouver, BC V6C 1H2 1.604.683.3995 1.888.945.4770 info@imaginelithium.com www.imaginelithium.com TSX-V:ILI | OTCQB:ARXRF

Imagine Lithium — Investor Presentation (February 2023) on 6ix