Imagine Lithium Inc · TSXV:ILI

Imagine Lithium — Investor Presentation (June 2026)

18 slides from Imagine Lithium's investor presentation, June 2026

  1. Slide 1: June 2026

    June 2026 TSX-V:ILI | OTCQB:ARXRF www.imaginelithium.com

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT This presentation is strictly confidential and any disclosure, use, copying and circulation of this presentation is prohibited without the consent of Imagine Lithium Corp. (“ILI” or “The Company”). The information contained in this presentation does not constitute or form part o

  3. Slide 3: Imagine Lithium Inc.

    IMAGINE LITHIUM INC. Exploration company focused on advancing the Jackpot Lithium Project in Ontario Growing Resources: 8.3 Mt of open-pitable indicated and inferred resources defined to date Prime Location ~40 km north of Nipigon, ON with infrastructure including ports, electricity and highways TSX

  4. Slide 4: Regional Location

    REGIONAL LOCATION Red Rock Port (60 km) ▪ Located with access to the Jackpot Project Great Lakes and St. Lawrence Seaway giving Thunder Bay Port (150 km) shipping access to: ▪ Global process plants ▪ Proposed Windsor Giga Factory ▪ ~150 km from Thunder Bay Port ▪ ~60 km from proposed Red Rock Port ▪

  5. Slide 5: Regional Location

    REGIONAL LOCATION ▪ Large land package ~27,597 ha, including 8,449 ha Spod Lithium Option ▪ Nearby Infrastructure: Power, Roads/Highways, Railway, Workforce, Ports ▪ Exploration agreement in place with local First Nations communities ▪ Resources to 200m depth vs Rock Tech’s 340m open pit depth ▪ Exp

  6. Slide 6: Jackpot Resource Area

    JACKPOT RESOURCE AREA ▪ Jackpot consists of a swarm of parallel, east-west trending lithium pegmatites ▪ Resource Estimate (Oct 2024) ▪ Metallurgical Testing predicts 6% Li2O with at least 75% recovery ▪ Jackpot Pit: 3.1 Mt indicated @ 0.85% Li 2O 2.2 Mt inferred @ 0.82% Li2O ▪ Casino Royale Pit: 3.

  7. Slide 7: Mineral Resources Estimate

    MINERAL RESOURCES ESTIMATE Pit Constrained Mineral Resource Estimate at 0.30% Li2O Cut-off Li2O Classification Tonnes M Li2O % k tonnes Indicated 3.1 0.85 26.2 Inferred 5.3 0.91 49.5 Pit-Constrained Mineral Resource Estimate Sensitivity Indicated Inferred Li2O Cut-Off Tonnes Li2O Tonnes Li2O Li2O k

  8. Slide 8: Jackpot Resource Cross Section

    JACKPOT RESOURCE CROSS SECTION ▪ Shallow drill depth <200 m ▪ Dykes dip shallow to the north ▪ Dyke swarms could be stacked north and south of current resources ▪ all resources are near-surface (<200m depth) and pit constrained TSX-V:ILI | OTCQB:ARXRF SLIDE 8 | imaginelithium.com

  9. Slide 9: Ontario Lithium Projects Comparison

    ONTARIO LITHIUM PROJECTS COMPARISON As of April 2026 Company Rock Tech (NI43-101) Imagine Lithium (NI43-101) Imagine Lithium (JORC) Project Name Georgia Lake Jackpot Jackpot Enterprise Value ~107.3M ~5.84M ~5.84M M&I: M&I: 10.60Mt @ 0.88% Li2O 3.1Mt @ 0.85% Li2O GLOBAL INF: Resource Estimate 13.4Mt

  10. Slide 10: Jackpot Exploration

    JACKPOT EXPLORATION ▪ Infill drilling at Jackpot deposit to bring to Indicated category ▪ Resource expansion drilling at Casino Royale ▪ Exploration drilling: ▪ Peg 500 Extension ▪ Jackpot Southwest ▪ Blay Lake Zone ▪ Carrot Lake West ▪ Potential to grow existing resource pit and for additional para

  11. Slide 11: Casino Royale Exploration

    CASINO ROYALE EXPLORATION ▪ Resource expansion drilling at Casino Royale planned for 2026 ▪ Resource potential is open in all directions ▪ Drilling planned to test potential for additional resources outside the pit shell to the north and south ▪ Drilling planned west of JP- 24-40 to test and west TS

  12. Slide 12: Ruth Pegmatite Exploration

    RUTH PEGMATITE EXPLORATION ▪ Ruth pegmatite discovery ~25 km north on Gorge Creek Road ▪ discovered in fall 2024 with surface samples returning 1.67% and 2.56% Li2O ▪ Ruth pegmatite ~1 km north of the historic Foster-Lew occurrence ▪ Bedrock stripping exposed ~235 m of strike length in three areas ▪

  13. Slide 13: Ruth Pegmatite Exploration

    RUTH PEGMATITE EXPLORATION ▪ Ruth dyke ranges from 2.9m to 7.7m wide in two, parallel and anastomosing dykes ▪ Bedrock stripping exposed 235m strike length ▪ Pegmatite zone in each channel ranges from 4.85m to 9.5m total intercept ▪ Fall 2025 highlights: ▪ RCH25-06 - 1.34% Li2O/9.10m ▪ RCH25-05 - 1.

  14. Slide 14: Jackpot Project Highlights

    JACKPOT PROJECT HIGHLIGHTS ▪ Resource Estimate (Oct 2024): ▪ Metallurgical Testing predicts 6% Li2O with at least 75% recovery ▪ Jackpot Pit: 3.1 Mt indicated @ 0.85% Li2O 2.2 Mt inferred @ 0.82% Li2O ▪ Casino Royale Pit: 3.1 Mt inferred @ 1.00% Li2O ▪ All resources are near- surface (<200m depth) a

  15. Slide 15: Exploration Potential

    EXPLORATION POTENTIAL ▪ Casino Royale resource expansion ▪ Ruth Pegmatite resource potential ▪ Peg 500 Extension ▪ South Jackpot Zone (soil anomaly with spodumene boulders) ▪ Blay Lake Zone (soil anomaly with spodumene boulders) ▪ Jackpot West Pegmatite ▪ SPOD Option ground west of Ruth Pegmatite TS

  16. Slide 16: Management, Board & Advisors

    MANAGEMENT, BOARD & ADVISORS Simone Suen Jason Arnold Sufan Siauw President, Director Exploration Manager, Director Director • 25+ years of business, • Professional geologist (PGO, APEGS) • 25+ years of business, executive and board • 25+ years of experience in mineral executive and board experience

  17. Slide 17: Share Structure

    SHARE STRUCTURE As of May 2026 SHARES OUTSTANDING (POST FINANCING) 340,628,030 WARRANTS 4,000,000 OPTIONS 10,375,000 FULLY DILUTED 355,003,030 TSX-V:ILI | OTCQB:ARXRF SLIDE 17 | imaginelithium.com

  18. Slide 18: Imagine Lithium Corp.

    IMAGINE LITHIUM CORP. 1240-789 W. Pender St. Vancouver, BC V6C 1H2 1.807.355.5405 1.888.945.4770 info@imaginelithium.com www.imaginelithium.com TSX-V:ILI | OTCQB:ARXRF SLIDE 18 | imaginelithium.com

Imagine Lithium — Investor Presentation (June 2026) on 6ix