Royal Bafokeng Platinum Ltd

Royal Bafokeng Platinum — Bank of America Merrill Lynch Global Metals, Mining & Steel Conference 2014

27 slides from Royal Bafokeng Platinum's conference presentation, May 13, 2014

  1. Slide 1: Bank of America Merrill Lynch Global Metals, Mining & Steel Conference

    Slide 1: Bank of America Merrill Lynch Global Metals, Mining & Steel Conference

    Bank of America Merrill Lynch Global Metals, Mining & Steel Conference 13-15 May 2014 Fontainebleau Miami Beach

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer The information presented in this presentation is of a general nature and the forward looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im

  3. Slide 3: Content

    Slide 3: Content

    Content RBPlat 1. Overview of RBPlat • Operational excellence 2. Growing organically - Styldrift • Flexibility 3. The industry landscape • Organic growth 4. RBPlat’s competitive position • Value enhancing opportunities 5. Outlook 3

  4. Slide 4: RBPlat Overview

    Slide 4: RBPlat Overview

    RBPLAT OVERVIEW RESOURCES OPERATIONS PROJECTS STUDIES

  5. Slide 5: About Royal Bafokeng Platinum (RBPlat)

    Slide 5: About Royal Bafokeng Platinum (RBPlat)

    About Royal Bafokeng Platinum (RBPlat) 67% INTEREST IN BAFOKENG RASIMONE PRIME LOCATION ON PLATINUM MINE (BRPM) WESTERN LIMB OF MID-TIER UNINCORPORATED JSE LISTED BUSHVELD COMPLEX, PGMs PRODUCER JOINT VENTURE WITH SOUTH AFRICA ANGLO AMERICAN PLATINUM (BRPM JV) • Community owned at 52.8% by • Well-de

  6. Slide 6: Quality resource with attractive prill splits

    Slide 6: Quality resource with attractive prill splits

    Quality resource with attractive prill splits 100% Inclusive Resource RBPlat 67% Description BRPM Mt 4E g/t 4E Moz Mt 4E g/t 4E Moz Merensky Merensky 4.32% 4.23% Measured 14.44 7.61 3.53 9.68 7.61 2.37 Indicated 7.62 6.97 1.71 5.11 6.97 1.14 Pt% Inferred 7.81 8.05 2.02 5.23 8.05 1.36 Pd% Merensky To

  7. Slide 7: Quality high grade resource: resources versus production

    Slide 7: Quality high grade resource: resources versus production

    Quality high grade resource Resources versus production Bubble size = 4E PGM production 300 250 Zimplats Lonmin Resource size, (Moz 4E) 200 Amandelbult 150 ILA 100 Modikwa Bokoni BRPM JV: RPM 71.9Moz 6.17 g/t (4E) 50 Zondereinde Marula 0 2 3 4 5 6 7 BRPM JV – Pre Styldrift In-situ grade, 4E PGM g/t

  8. Slide 8: BRPM – Operational excellence and flexibility

    Slide 8: BRPM – Operational excellence and flexibility

    BRPM – Operational excellence and flexibility 16 years of operation ˃ Well-understood, defined geology ˃ Well-established, flexible mining platform • Merensky biased • Ore reserves developed well in advance • Appropriate spare panel flexibility (1.5) • Access to UG2 established ˃ Experienced managem

  9. Slide 9: Styldrift I Project: Growing Organically

    Slide 9: Styldrift I Project: Growing Organically

    STYLDRIFT I PROJECT GROWING ORGANICALLY

  10. Slide 10: Styldrift I project on track

    Slide 10: Styldrift I project on track

    Styldrift I project on track Highlights > A 230ktpm mechanised Merensky mine > Steady state in 3Q 2018 > Overall progress 44.67% complete > Project activities in 2014 > Sink Main and Service shaft to shaft bottom (758m) > Lateral development – 1.5km > Overland conveyor construction > BRPM plant 250k

  11. Slide 11: Styldrift II Study Project: Future Growth

    Slide 11: Styldrift II Study Project: Future Growth

    STYLDRIFT II STUDY PROJECT FUTURE GROWTH

  12. Slide 12: Styldrift II study work progressing well

    Slide 12: Styldrift II study work progressing well

    Styldrift II study work progressing well Key facts > Resource area ± 24 million m2 > 40% of BRPM JV resource base > Average depth 1 150m at average 90 dip > Underlain by the Swartklip Facies , high grades, consistent mineralised envelope (104cm) > Currently in pre-feasibility study Approximate SD II

  13. Slide 13: Further growth optionality

    Slide 13: Further growth optionality

    Further growth optionality > Regional Value enhancing • Consolidation • Royalty agreements opportunities > Mergers and acquisitions • Not limited to region > High quality Merensky orebody Develop Styldrift II > Explore synergies with other parties to develop > Pay dividends post full ramp up (2018)

  14. Slide 14: The Industry Landscape

    Slide 14: The Industry Landscape

    THE INDUSTRY LANDSCAPE 14

  15. Slide 15: Industry facing short-term headwinds

    Slide 15: Industry facing short-term headwinds

    Industry facing short-term headwinds ˃ Challenging macro economic conditions have resulted in constrained balance sheets • Costs have tripled since 2003 - (ca. 14% p.a. since 2007) • Producers forced to cut back capital expenditure • Mine closures in the past two years ˃ Section 54 stoppages ˃ Insta

  16. Slide 16: Widening disparity between Merensky and UG2 Reef profitability

    Slide 16: Widening disparity between Merensky and UG2 Reef profitability

    Widening disparity between Merensky and UG2 Reef profitability ˃ Majority of mines are getting deeper, industry average depth > 1 000 mbs within 10 years ˃ Reserve depletion from 2015 – project delays ˃ Merensky output and industry average head grades are declining • 2000: 70% Merensky 30% UG2 ; 201

  17. Slide 17: RBPlat Competitively Positioned

    Slide 17: RBPlat Competitively Positioned

    RBPLAT COMPETITIVELY POSITIONED

  18. Slide 18: High quality, shallow assets with Merensky bias

    Slide 18: High quality, shallow assets with Merensky bias

    High quality, shallow assets with Merensky bias 100% 3% 4% 5% 5% 10% 11% 9% 12% 15% 16% 18% 2000 MERENSKY (70%) UG2 (30%) 90% 80% 70% 2012 MERENSKY (30%) UG2 (70%) Merensky : UG2 % 60% Source : Chamber of Mines – 21 January 2013, RSA PGM Mining Sector Briefing Note 50% 40% BRPM JV 30% • Long-term Me

  19. Slide 19: Base metals in Merensky provide margins

    Slide 19: Base metals in Merensky provide margins

    Base metals in Merensky provide margins Producer revenues (Southern Africa), 2012 ($/4E oz) 1,800 Base metal revenue PGM (6E) revenue 100% MER or MSZ Zimbabwean operations [1.8 moz 4E] BRPM 75-100% UG2 1,600 Mixed reef or [2.4 moz 4E] UG2 with high Pt:Pd ratio [3.6 moz 4E] 1,400 1,200 1,000 Total re

  20. Slide 20: Competitive position on the industry cost curve

    Slide 20: Competitive position on the industry cost curve

    Competitive position on the industry cost curve 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 3,000 J.P. Morgan Cazenove Platinum Industry Break-even Analyser (Cash Cost + Maintenance Capex) 2,500 2,000 1,500 Platinum Price Price ($/oz) Average Break-Even Price 1,000 500 0 Mogalakwena (PPRust) Northam

  21. Slide 21: Spending to grow

    Slide 21: Spending to grow

    Spending to grow Capex forecast (incl. escalation and contingency) 3.1 3.0 2.6 2.4 2.5 R billion 2.0 1.5 1.5 1.0 1.0 0.5 0.0 2014 2015 2016 2017 2018 SIB Replacement Expansion Expansion capital > Styldrift I - Mining and Infrastructure - Conveyor belt linking Styldrift to BRPM concentrator (2014/201

  22. Slide 22: High cash generative operation funding substantial portion of organic growth

    Slide 22: High cash generative operation funding substantial portion of organic growth

    High cash generative operation funding substantial portion of organic growth > In excess of R3 billion of funding currently available to RBPlat comprising : > Cash on hand > Revolving credit facility (RCF) of R1 billion unutilized to date > Successful equity capital raise of R1.5 billion completed >

  23. Slide 23: Strong financial performance

    Slide 23: Strong financial performance

    Strong financial performance Unit 2013 2012 % Change Average revenue basket price R/ Pt oz 17 927 16 404 9.3% Operating cash cost R/ Pt oz 11 592 11 775 2% Operating profit R’m 573.5 305.0 88% Cash generated by operating activities R’m 907.8 732.6 23.9% Capital expenditure (100% BRPM JV) R’m 1 059 1

  24. Slide 24: Outlook: RBPlat Well Positioned

    Slide 24: Outlook: RBPlat Well Positioned

    OUTLOOK RBPLAT WELL POSITIONED

  25. Slide 25: Engagement with various stakeholders is key

    Slide 25: Engagement with various stakeholders is key

    Engagement with various stakeholders is key ˃ Safety is paramount ˃ Social partnerships to be strengthened ˃ Regular and meaningful engagement with labour and the communities ˃ Collaboration with other PGM players in order to implement social and labour plan programmes ˃ Producers need to invest in

  26. Slide 26: Long-term PGM fundamentals remain strong

    Slide 26: Long-term PGM fundamentals remain strong

    Long-term PGM fundamentals remain strong ˃ South Africa’s PGM supply expected to drop in the short term ˃ Platinum market (excluding investment demand) to remain in balance in the short term while the deficit in the palladium market expected to increase ˃ Introduction of Euro 6 in September 2014 set

  27. Slide 27: Contact details

    Slide 27: Contact details

    Contact details Lindiwe Montshiwagae Investor Relations Manager Royal Bafokeng Platinum The Pivot, No 1 Monte Casino Boulevard, Block C, Floor 4, Fourways, 2021 Tel: +27 (0) 10 590 4517 Fax: +27 (0) 86 219 5131 Mobile: +27 (0) 82 920 7803 Email: lindiwe@bafokengplatinum.co.za

Source: company website