Canadian Copper, Inc. · CSE:CCI

Canadian Copper — Investor Presentation (November 2026)

23 slides from Canadian Copper's investor presentation, Nov 15, 2026

  1. Slide 1: A Financed Mine to Mill in New Brunswick, Canada

    Slide 1: A Financed Mine to Mill in New Brunswick, Canada

    P RE S E N T AT I O N D E C K 1 5 N O V E M B E R 2 02 6 CSE : CCI A Financed Mine to Mill in New Brunswick, Canada Positioning For Near-term Copper And Zinc Production In Bathurst, New Brunswick, Canada canadiancopper.com 1

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer Forward-Looking Information and Statements This presentation contains “forward-looking information” for purposes of applicable Canadian securities laws. Forward-looking The Caribou Mine historical mineral resource estimates were derived from the technical report titled “Technical Report o

  3. Slide 3: Ownership, Financing, & Capitalization

    Slide 3: Ownership, Financing, & Capitalization

    1 5 N O V E M B E R 2 02 6 Ownership, Financing, & Capitalization C AP ITA L S TR UC T U R E 26% Retail 21% Share Price (C$) $0.55 21% Ocean Partners 26% Current S/O 237M Canadian Copper 12% Institutional 12% Shareholders 235M Average Volume 500K Market Cap $130M 8% Shares Outstanding 8% Management

  4. Slide 4: Project Financing Secured: 55% At CCI Discretion

    Slide 4: Project Financing Secured: 55% At CCI Discretion

    1 5 N O V E M B E R 2 02 6 Project Financing Secured: 55% At CCI Discretion Why Project Financing Now? $38.4 • Ocean Partners: up to $48.0M in project debt • Ocean partners has committed to a possible $48.0 C$96M+ Funding Secured • Funds key development workstreams, including additional capital inje

  5. Slide 5: Base Metal Developer in a Tier-1 Jurisdiction

    Slide 5: Base Metal Developer in a Tier-1 Jurisdiction

    1 5 N O V E M B E R 2 02 6 CANADI AN COPPER INVESTMENT HIGHLIGHTS Base Metal Developer in a Tier-1 Jurisdiction 01 Near-Term Production 02 Provincial Support 03 $200M Infrastructure In-Place - Past-producing Caribou Mine (2022) - First mine permit since 2013, government - Concentrator, tailings stor

  6. Slide 6: Producing Asset in 2022 a Tier-1 Jurisdiction

    Slide 6: Producing Asset in 2022 a Tier-1 Jurisdiction

    1 5 N O V E M B E R 2 02 6 CARIBOU MIN E | NEW B RU NSWICK, CANADA Producing Asset in 2022 a Tier-1 Jurisdiction • Past producing mine & mill with ~$400M invested to date - H1 2022 produced 20M lb Zn, 13.4M Pb, and 400Koz Ag - • Excellent infrastructure in place: concentrator, roads, power, water, t

  7. Slide 7: +$200M of Infrastructure In-Place

    Slide 7: +$200M of Infrastructure In-Place

    1 5 N O V E M B E R 2 02 6 REPLACEMEN T COST ADVA NTAG E +$200M of Infrastructure In-Place C$200M Mineral Processing Mining Maintenance Crushing & grinding circuits, flotation Permitted ore stockpile location, Workshops, warehouses, cells, tailings facility, metallurgical lab dewatering wells, haul

  8. Slide 8: Combined strategy: Complementary Assets

    Slide 8: Combined strategy: Complementary Assets

    CAR IBOU PLANT COMPLEX Combined strategy: Complementary Assets MUR RAY BROOK DEPOS IT H1 2022 Production 20M lb Zn | 13M lb Pb | 400K Ag • 3,000 tpd C&M mill • 100% ownership; • Admin building, lab, power, water. • Advanced development • Permitted tailings • +21Mt @ 1.42% CuEq; 98% M&I Resources PRO

  9. Slide 9: Highlights June 2025 PEA

    Slide 9: Highlights June 2025 PEA

    15 N OV E M B E R 2 026 Highlights June 2025 PEA | FS Targeting January 2027 13.2 year BASE CASE ASSUMPTIONS US$4.25/lb Cu | US$1.30/lb Zn | US$27/oz Ag | US$1.10/lb Pb Mine Life PRE-TAX AFT ER-TAX C$64M C$265 M C$169 M NPV (7%) NPV (7%) Initial Capex 30 M lbs CuEq OR 41% 36% IRR IRR 98 M lbs ZnEq A

  10. Slide 10: Path to Development – Increasing Canada's Zinc by +20%/Year

    Slide 10: Path to Development – Increasing Canada's Zinc by +20%/Year

    1 5 N O V E M B E R 2 02 6 Path to Development – Increasing Canada’s Zinc by +20%/Year Activity Q4 2026 2027 2028 Complete Financing Close Caribou Transaction Metallurgical Drilling Metallurgical Program v Complete Baseline Permitting Identify Design Gaps: PFS or FS Review Submit EIA & Start MRIA Pe

  11. Slide 11: Feasibility Study Third-Party Execution Team

    Slide 11: Feasibility Study Third-Party Execution Team

    ✓ Metallurgical Testing (process & environmental characterization) Feasibility Study ✓ Feasibility lead including mining, processing, infrastructure, site civils and capex/opex. delivery Third-Party Execution Team ✓ Geotechnical, hydrogeology, tailings, and closure plan ✓ EIA author, environmental c

  12. Slide 12: Murray Brook Site General Arrangement

    Slide 12: Murray Brook Site General Arrangement

    1 5 N O V E M B E R 2 02 6 Murray Brook Site General Arrangement 12

  13. Slide 13: Proposed Flowsheet for Restart

    Slide 13: Proposed Flowsheet for Restart

    1 5 N O V E M B E R 2 02 6 Proposed Flowsheet for Restart 13

  14. Slide 14: Caribou Horizon Trend Consolidation

    Slide 14: Caribou Horizon Trend Consolidation

    CARIBOU HORIZON TREND CONSOLIDATION Canadian Copper Property is 25km Connects two Former Producing Operations Underexplored with +30 Years Historical Production 5 km from Highway #180 Caribou Mine Produced +700Mlbs of Restigouche Mine Zinc, Lead, and Silver Produced +40Mlbs of Zinc, Lead, and Silver

  15. Slide 15: Murray Brook Deposit: 2026 Drill Plan

    Slide 15: Murray Brook Deposit: 2026 Drill Plan

    15 N O V E MB E R 20 26 MU RRAY B ROO K DE P OS IT 2026 Murray Brook Drill Plan Major MegaTEM Anomaly Eastern Area – approximately 1,200 m Mafic Volcanic (Boucher Brook Fm) A B Western Area – approximately 1,600 m A C Exploration West – approximately 500 m MB Deposit 2026 Drillhole B Felsic Surface

  16. Slide 16: Murray Brook West Extension – Drilling Complete – Assays Pending

    Slide 16: Murray Brook West Extension – Drilling Complete – Assays Pending

    1 5 N O V E M B E R 2 02 6 Murray Brook West Extension – Drilling Complete – Assays Pending 16

  17. Slide 17: MOU with Pabineau First Nation

    Slide 17: MOU with Pabineau First Nation

    1 5 N O V E M B E R 2 02 6 The MOU aims to foster open communication and collaboration on mineral development opportunities in New Brunswick. Creates mutual benefits, including job creation, contracting opportunities, and potential business partnerships for Pabineau MOU with Pabineau First Nation. F

  18. Slide 18: Management Team and Board of Directors

    Slide 18: Management Team and Board of Directors

    15 N OV E M B E R 2 026 MANAGEMENT TEAM SIMON QUICK , MBA ERIK H. MARTIN , CMA CHRISTIAN BROUSSEAU, P.Eng. MBA CEO CFO VP, PROJE CTS BOARD OF DIRE CTORS ANDREW ELINESKY , CPA MARCE L ROBILLARD , P.Geo ANDRE TESSIER , P.Eng., MSc. Geo THOMPSON HI CKEY , P.Eng., MBA BRENT OMLAND, CA 18

  19. Slide 19: Thank you

    Slide 19: Thank you

    Thank you Simon Quick Chief Executive Officer simon@canadiancopper.com 905.220.6661 19

  20. Slide 20: Appendix A: 2023 Mineral Resource

    Slide 20: Appendix A: 2023 Mineral Resource

    Appendix A: 2023 Mineral Resource1 1 US metal prices $4.00/lb Cu, $1.25/lb Zn, $0.95/lb Pb, and $23/oz Ag at $0.76 USD/CAD. 20 1 Process recoveries used were 80% Cu, 87% Zn, 75% Pb, and 90% Ag.

  21. Slide 21: Appendix B: Capital Cost

    Slide 21: Appendix B: Capital Cost

    1 5 N O V E M B E R 2 02 6 Appendix B: Capital Cost1 Sustaining Capex Capex CARIBOU MILL PURCHASE $6 C$ 49M MINING - OTHER 29 WATER TREATMENT 0.2 Mining & Plan Equipment PROCESS PLANT 7 ON SITE Tailings Storage Facility 1 C$64M INFRASTRUCTURE Water Treatment plant INDIRECTS 6 Haul Road PROJECT DELIV

  22. Slide 22: Appendix C: PEA Production Metrics

    Slide 22: Appendix C: PEA Production Metrics

    1 5 N O V E M B E R 2 02 6 Appendix C: PEA Production Metrics Production Costs Mine Life 13.2 years Initial Capex Sustaining Capex 30 M lbs CuEq Average Annual Production 98 M lbs ZnEq C$64M C$49M Avg. Annual Copper Production 8 M lbs Cu Avg. Annual Zinc Production 47 M lbs Zn AISC LOM Total Cost Pe

  23. Slide 23: Appendix D: Murray Brook Resource Estimate

    Slide 23: Appendix D: Murray Brook Resource Estimate

    1 5 N O V E M B E R 2 02 6 Appendix D: Murray Brook Resource Estimate Summary Of Contained Metals MRE is >98%+ Measure and Indicated Resources COPPER ZINC SILVER LEAD GOLD Mlbs % Mlbs % Moz g/t Mlbs % Koz g/t Measured 211 0.45 1,157 2.45 26 38 421 0.91 378 0.56 & Indicated Inferred 1.0 0.4 4.4 1.82

Source: company website

More decks from Canadian Copper, Inc.

All 32 Canadian Copper decks