Slide 1: Only Mine to Mill in New Brunswick, Canada
CSE : CCI PRESENTATION DECK N OVEM BER 2 025 ONLY M INE TO MILL IN NEW BRUNSWICK, CA NA DA P O S I T I O N I N G F O R N E A R -T E R M C O P P E R A N D Z I N C P R O D U C T I O N I N B AT H U R S T, N E W B R U N S W I C K , C A N A D A www.canadiancopper.com
Slide 2: Disclaimer
DISCLAIMER Forward-Looking Informa tion and Statements This presentation contains “forward-looking information” for purposes of applicable Canadian securities laws. Forward-looking The Caribou Mine historical mineral resource es timates were derived from the technical report titled “Technical Report
Slide 3: Ownership, Financing, & Capitalization
1 3 NO VE MBE R 2 0 2 5 OWNERSHIP, FINANCING, & CAPITALIZATION C A P I TA L ST R U C T U R E Share Price $0.29 (C$) Current S/O 184M 17% C a na di a n C o ppe r Average S h a r e h ol d e r s 500K Volume Market Cap $50M 33% 184 M Retail Cash $15M Shares Warrants 44M1 Outstanding Options 4.0M2 11% In
Slide 4: Steady Record of Execution
1 3 NO VE MBE R 2 0 2 5 STEADY RECORD OF EXECUTION 2022 2023 2024 2025 JULY Q2 Q1 Q2 Canadian Copper starts trading 72% Acquisition of Murray Brook $2.1M sale of noncore assets Joint Strategy PEA - $169M NPV (Murray Brook + Caribou Processing Q4 Q3 Q3 Complex) • Remaining 28% of • MOU signed with Pa
Slide 5: Five Key Objectives; CCI Share Price Performance
FIVE KEY OBJECTIVES CCI SHARE PRICE PERFORMANCE Canadian Copper, Inc. — All Data Price Volume Volume (Thousands) Volume Canadian Copper, Inc. 5 3 4 2 1 Source: Company Documents, FactSet 5 Not e: Performance for CSE:CCI Shown in Canadian Dollars
Slide 6: Combined Strategy: Complementary Assets
1 3 NO VE MBE R 2 0 2 5 COMBINED STRATEGY: COMPLEMENTARY ASSETS PROVEN LARGE DEPOSIT EXISTING PROCESS FACILITY N MURRAY BROOK DEPOSIT CARIBOU PLANT COMPLEX 2019 Production • 100% ownership; 75M lb Zn | 27M lb Pb | 705K Ag • Advanced development • 3,000 tpd C&M mill • +21Mt @ 1.42% CuEq; • Admin buil
Slide 7: Combined Strategy: June 2025 PEA Results
1 3 NO VE MBE R 2 0 2 5 COMBINED STRATEGY: JUNE 2025 PEA RESULTS HIGH LIGHTS 13.2 year BASE CASE ASSUMPTIONS US$4.25/lb Cu | US$1.30/lb Zn US$27/oz Ag | US$1.10/lb Pb Mine Life PRE-TAX AFTER-TAX C$64 M C$265 M C$169 M Initial Capex NPV (7%) NPV (7%) 30 M lbs CuEq Or 41% 36% 98 M lbs ZnEq IRR IRR Avg
Slide 8: PEA Production Metrics
1 3 NO VE MBE R 2 0 2 5 PEA PRODUCTION METRICS Costs Production Mine Life 13.2 years INITIAL CAPEX SUSTAINING CAPEX 30 M lbs CuEq Average Annual Production 98 M lbs ZnEq C$64M C$49M Avg. Annual Copper Production 8 M lbs Cu Avg. Annual Zinc Production 47 M lbs Zn Avg. Annual Silver Production 783 K o
Slide 9: Murray Brook Resource Estimate
MURRAY BROOK RESOURCE ESTIMATE SUMMARY OF CONTAINED METALS MRE is >98%+ Measure and Indicated Resources COPPER ZINC SILVER LEAD GOLD Mlbs % Mlbs % Moz g/t Mlbs % Koz g/t Measured 211 0.45 1,157 2.45 26 38 421 0.91 378 0.56 & Indicated Inferred 1.0 0.4 4.4 1.82 0.1 30 1.6 0.68 2 0.62 1 US metal price
Slide 10: Path to Development
PATH TO DEVELOPMENT Activity Q4 2026 2027 2028 Complete Financing Close Caribou Transaction Metallurgical Drilling Metallurgical Program Complete Baseline Permitting Identify Design Gaps: PFS or FS Review Submit EIA Commence Engineering and Site Works EIA Approval Submit Construction Permits Approva
Slide 11: Murray Brook Is Key to Caribou Increasing Throughput
MURRAY BROOK IS KEY TO CARIBOU INCREASING THROUGHPUT CARIBOU UG ORE DELIVERY START/STOP OF MILL UG ORE DELIVERY OPERATION CHALLENGES INCREASED IMPACTED CHALLENGES IMPACTED 2018-2019 COSTS MAINTENANCE COSTS 2,500 TPD @ $35/T1 PROCESSED MURRAY BROOK ADVANTAGE ✓ OP ore reliable and reduces FX costs ✓ I
Slide 12: Proposed Access Roads
1 3 NO VE MBE R 2 0 2 5 PROPOSED ACCESS ROADS Provincial Highway Route #180 • Both previously disturbed sites • Sites connected by Crown Land • Town of Bathurst ~ 31 minutes by Car • Development site entirely connected by Provincial Highway Route #180 12
Slide 13: Caribou Horizon Trend Consolidation
CARIBOU HORIZON TREND CONSOLIDATION Canadian Copper Property is 18km Connects two Former Producing Operations Underexplored with +30 Years Historical Production 5 km from Highway #180 Caribou Mine Murray Brook West Produced +700Mlbs of Zinc, Lead, and Silver Project • 2,790 hectares We are • Highly
Slide 14: Murray Brook Deposit Defining Further Extensions
MURRAY BROOK DEPOSIT DEFINING FURTHER EXTENSIONS MB2019-02 MB2018-03 MB2012-65 0.82%Cu ov er 34.0m 0.79%Cu, 2.95% Pb-Zn, 0.81%Cu, 2.20% Pb-Zn, 33 g/t Incl. 1.42%Cu, 0.15g/t 29 g/t Ag ove r 99.6m Ag, 0.55 g/t Au over 81.8m Au over 16.3m Incl. 3.04% over 19.0m Incl. 4.07% over 11.0m • 3000m drill prog
Slide 15: MOU with Pabineau First Nation
1 3 NO VE MBE R 2 0 2 5 MOU WITH PABINEAU FIRST NATION October 8th , 2024: Canadian Copper signed a non-binding Memorandum of Understanding with Pabineau First Nation The MOU aims to foster Creates mutual benefits, Pabineau First Nation open communication and including job creation, provides local l
Slide 16: Management Team, Board of Directors
CSE: CCI MANAGEMENT TEAM BOARD OF DIRECTORS SIM ON QUICK | CEO & DIREC TOR ANDREW ELINESKY | DIRECTOR Mr. Quick has more than 14 years as a well-regarded mining As a finance professional, Mr. Elinesky brings over 20 years of experience as a CFO and leader, spanning the USA, Mexico, Argentina, and Ca
Slide 17: Thank You
THANK YOU Simon Quick Chief Executive Officer simon@canadiancopper.com 905.220.6661 17
Slide 18: Appendix A: 2023 Mineral Resource
APPENDIX A: 2023 MINERAL RESOURCE 1 1 US metal prices $4.00/lb Cu, $1.25/lb Zn, $0.95/lb Pb, and $23/oz Ag at $0.76 USD/CAD. 18 1 Process recoveries used were 80% Cu, 87% Zn, 75% Pb, and 90% Ag.
Slide 19: Appendix B: Capital Cost
1 3 NO VE MBE R 2 0 2 5 APPENDIX B: CAPITAL COST 1 SUSTAINING CAPEX CAPEX CARIBOU MILL PURCHASE $6 C$ 49M MINING - OTHER 29 WATER TREATMENT 0.2 PROCESS PLANT 7 Mining & Plan Equipment ON SITE 1 C$ 64M INFRASTRUCTURE Tailings Storage Facility INDIRECTS 6 Water Treatment plant PROJECT DELIVERY 4 OWNER