Canadian Copper, Inc. · CSE:CCI

Canadian Copper — Investor Presentation (February 2026)

20 slides from Canadian Copper's investor presentation, February 2026

  1. Slide 1: Only Mine to Mill in New Brunswick, Canada

    CSE : CCI PRESENTATION DECK FEBRUARY 2026 ONLY MINE TO MILL IN NEW BRU NSW ICK, CA NA DA P O S I T I O N I N G F O R N E A R -T E R M C O PP E R A N D Z I N C P R O D U CT I O N I N B AT HU R S T, N E W B R U N S W I C K , CA N A D A www.canadiancopper.com

  2. Slide 2: Disclaimer

    DISCLAIMER Forward-Looking Information and Statements This presentation contains “forward-looking information” for purposes of applicable Canadian securities laws. Forward-looking The Caribou Mine historical mineral resource estimates were derived from the technical report titled “Technical Report o

  3. Slide 3: Ownership, Financing, & Capitalization

    28 JANU AR Y 2 026 OWNERSHIP, FINANCING, & CAPITALIZATION C AP ITA L S TR UC T U RE Share Price $0.60 (C$) Current S/O 184M 17% C a n a d i a n C o pp e r Average S h a r e h o l de r s 500K Volume Market Cap $115M 33% 184 M Retail Cash $15M Shares Warrants 44M1 Outstanding Options 4.0M2 11% Institu

  4. Slide 4: Steady Record of Execution

    28 JANU AR Y 2 026 STEADY RECORD OF EXECUTION 2022 2023 2024 2025 JULY Q2 Q1 Q2 Canadian Copper starts trading 72% Acquisition of Murray Brook $2.1M sale of noncore assets Joint Strategy PEA - $169M NPV (Murray Brook + Caribou Processing Q4 Q3 Q3 Complex) • Remaining 28% of • MOU signed with Pabinea

  5. Slide 5: Five Key Objectives / CCI Share Price Performance

    FIVE KEY OBJECTIVES CCI SHARE PRICE PERFORMANCE $0.60 Canadian Copper, Inc. — All Data Price Volume Volume (Thousands) Volume Canadian Copper, Inc. 5 3 4 2 1 Sou rce: Com pany Document s, Fact Set 5 Note: P erfo rm an ce fo r CSE :CCI Sho wn in Canadian Dollars

  6. Slide 6: Combined Strategy: Complementary Assets

    28 JANU AR Y 2 026 COMBINED STRATEGY: COMPLEMENTARY ASSETS PROVEN LARGE DEPOSIT EXISTING PROCESS FACILITY N MURRAY BROOK DEPOSIT CARIBOU PLANT COMPLEX 2019 Production • 100% ownership; 75M lb Zn | 27M lb Pb | 705K Ag • Advanced development • 3,000 tpd C&M mill • +21Mt @ 1.42% CuEq; • Admin building,

  7. Slide 7: Combined Strategy: June 2025 PEA Results

    28 JANU AR Y 2 026 COMBINED STRATEGY: JUNE 2025 PEA RESULTS HI GHLIG HTS 13.2 year BASE CASE ASSUMPTIONS US$4.25/lb Cu | US$1.30/lb Zn US$27/oz Ag | US$1.10/lb Pb Mine Life PRE-TAX AFTER-TAX C$64 M C$265 M C$169 M Initial Capex NPV (7%) NPV (7%) 30 M lbs CuEq Or 41% 36% 98 M lbs ZnEq IRR IRR Avg. An

  8. Slide 8: Estimate of CCI Value: Trading Comparables

    28 JANU AR Y 2 026 Estimate of CCI Value: Trading Comparables' ASSUMPTIONS* NPV P/NAV Average Scotia Mining: 0.53x C$169M P/NAV EV/EBITDA Average Scotia Mining: 4.4x (2027 E) P/NAV Range EV/EBITDA Range $0.19 $0.64 Low Low $0.53 $0.83 EBITDA C$35M/Year EV/EBITDA Average Average $1.18 $1.93 High High

  9. Slide 9: PEA Production Metrics

    28 JANU AR Y 2 026 PEA PRODUCTION METRICS Costs Production Mine Life 13.2 years INITIAL CAPEX SUSTAINING CAPEX 30 M lbs CuEq Average Annual Production 98 M lbs ZnEq C$64M C$49M Avg. Annual Copper Production 8 M lbs Cu Avg. Annual Zinc Production 47 M lbs Zn Avg. Annual Silver Production 783 K oz Ag

  10. Slide 10: Murray Brook Resource Estimate

    MURRAY BROOK RESOURCE ESTIMATE SUMMARY OF CONTAINED METALS MRE is >98%+ Measure and Indicated Resources COPPER ZINC SILVER LEAD GOLD Mlbs % Mlbs % Moz g/t Mlbs % Koz g/t Measured 211 0.45 1,157 2.45 26 38 421 0.91 378 0.56 & Indicated Inferred 1.0 0.4 4.4 1.82 0.1 30 1.6 0.68 2 0.62 1 US metal price

  11. Slide 11: Path to Development

    PATH TO DEVELOPMENT Activity Q4 2026 2027 2028 Complete Financing Close Caribou Transaction Metallurgical Drilling Metallurgical Program Complete Baseline Permitting Identify Design Gaps: PFS or FS Review Submit EIA Commence Engineering and Site Works EIA Approval Submit Construction Permits Approva

  12. Slide 12: Murray Brook Is Key to Caribou Increasing Throughput

    MURRAY BROOK IS KEY TO CARIBOU INCREASING THROUGHPUT CARIBOU UG ORE DELIVERY START/STOP OF MILL UG ORE DELIVERY OPERATION CHALLENGES INCREASED IMPACTED CHALLENGES IMPACTED 2018-2019 COSTS MAINTENANCE COSTS 2,500 TPD @ $35/T1 PROCESSED MURRAY BROOK ADVANTAGE ✓ OP ore reliable and reduces FX costs ✓ I

  13. Slide 13: Proposed Access Roads

    28 JANU AR Y 2 026 PROPOSED ACCESS ROADS Provincial Highway Route #180 • Both previously disturbed sites • Sites connected by Crown Land • Town of Bathurst ~ 31 minutes by Car • Development site entirely connected by Provincial Highway Route #180 13

  14. Slide 14: Caribou Horizon Trend Consolidation

    CARIBOU HORIZON TREND CONSOLIDATION Canadian Copper Property is 18km Connects two Former Producing Operations Underexplored with +30 Years Historical Production 5 km from Highway #180 Caribou Mine Murray Brook West Produced +700Mlbs of Zinc, Lead, and Silver Project • 2,790 hectares We are • Highly

  15. Slide 15: Murray Brook Deposit Defining Further Extensions

    MURRAY BROOK DEPOSIT DEFINING FURTHER EXTENSIONS MB2019-02 MB2018-03 MB2012-65 0.82%Cu over 3 4.0m 0.79%Cu, 2.95% Pb-Zn, 0.81%Cu, 2.20% Pb-Zn, 33 g/t Incl. 1.42%Cu, 0.15g/t 29 g/t Ag over 9 9.6m Ag, 0 .55 g/t Au over 81.8 m Au over 16.3m Incl. 3.04% over 19.0m Incl. 4.07% over 11.0m • 3000m drill pr

  16. Slide 16: MOU with Pabineau First Nation

    28 JANU AR Y 2 026 MOU WITH PABINEAU FIRST NATION October 8th, 2024: Canadian Copper signed a non-binding Memorandum of Understanding with Pabineau First Nation The MOU aims to foster Creates mutual benefits, Pabineau First Nation open communication and including job creation, provides local land co

  17. Slide 17: Management Team and Board of Directors

    28 JANU AR Y 2 026 MANAGEMENT TEAM SIMON QUICK | CEO & Director ERIK H. MARTIN | CFO Mr. Quick has more than 14 years as a well-regarded mining Mr. Erik H. Martin is a CPA with over 32 years of experience in financial disclosure and leader, spanning the USA, Mexico, Argentina, and Canada. His manage

  18. Slide 18: Thank You

    THANK YOU Simon Quick Chief Executive Officer simon@canadiancopper.com 905.220.6661 18

  19. Slide 19: Appendix A: 2023 Mineral Resource

    APPENDIX A: 2023 MINERAL RESOURCE 1 1 US metal prices $4.00/lb Cu, $1.25/lb Zn, $0.95/lb Pb, and $23/oz Ag at $0.76 USD/CAD. 19 1 Process recoveries used were 80% Cu, 87% Zn, 75% Pb, and 90% Ag.

  20. Slide 20: Appendix B: Capital Cost

    28 JANU AR Y 2 026 APPENDIX B: CAPITAL COST 1 SUSTAINING CAPEX CAPEX CARIBOU MILL PURCHASE $6 C$ 49M MINING - OTHER 29 WATER TREATMENT 0.2 PROCESS PLANT 7 Mining & Plan Equipment ON SITE 1 C$ 64M INFRASTRUCTURE Tailings Storage Facility INDIRECTS 6 Water Treatment plant PROJECT DELIVERY 4 OWNERS COS

Canadian Copper — Investor Presentation (February 2026) on 6ix