Pan African Resources Plc · LSE:PAF

Pan African Resources — Gold Forum Europe 2024

39 slides from Pan African Resources's conference presentation, April 2024

  1. Slide 1: Mining for a Future

    XXX MINING FOR A FUTURE INVESTOR PRESENTATION APRIL 2024 OTCQX: PAFRF/PAFRY | AIM: PAF | JSE: PAN www.panafricanresources.com 1

  2. Slide 2: Disclaimer and Forward Looking Statements

    XXX DISCLAIMER AND FORWARD LOOKING STATEMENTS The name 'Presenter' refers to Pan African Resources PLC and its advisors, subsidiaries or affiliated companies. This presentation has not been filed, lodged, registered or approved in any jurisdiction and recipients of this document should keep themselv

  3. Slide 3: Overview of Presentation

    XXX OVERVIEW OF PRESENTATION Group overview Our operating environment H1 FY2024 – Key features H1 FY2024 Performance by operation Group AISC Capital projects (ZAR) ESG: Our “Beyond compliance” approach Sector leading dividend Exploration – Republic of the Sudan FY2024 – Focused on execution Appendix

  4. Slide 4: Group Overview

    Group overview Our operating environment H1 FY2024 – Key features H1 FY2024 Performance by operation Group AISC Capital projects (ZAR) ESG: Our “Beyond compliance” approach Sector leading dividend Exploration – Republic of the Sudan FY2024 – Focused on execution Appendix GROUP OVERVIEW

  5. Slide 5: Group Overview: Company Snapshot

    GROUP OVERVIEW XXX GROUP OVERVIEW COMPANY SNAPSHOT Board and Executives As at 28 March, 2024 KEITH SPENCER • Chairman JSE (PAN) ZAR539cps • Appointed: 8 October 2007 AIM (PAF) GBP22.5p ADR (PAFRY) 20:1 US$5.56 OTC (PAFRF) US$0.23 COBUS LOOTS Market capitalisation US$545m • Chief executive officer •

  6. Slide 6: Unique Combination of Underground and Surface Mining Operations

    GROUP OVERVIEW XXX GROUP OVERVIEW A UNIQUE COMBINATION OF UNDERGROUND AND SURFACE MINING OPERATIONS Low-cost surface tailings – environmental clean-up and rehabilitation benefits High grade, long-life underground mines * OTCQX: PAFRF/PAFRY | AIM: PAF | JSE: PAN www.panafricanresources.com 6

  7. Slide 7: H1 FY2024 Gold Production

    GROUP OVERVIEW XXX GROUP OVERVIEW H1 FY2024 GOLD PRODUCTION  6.7% TO 98,458oz (H1 FY2023: 92,307oz) Moving towards a balanced mix of low-cost surface mining and high-grade, long-life underground mines 35% - 45% SURFACE 65% - 55% U/G MTR + Soweto Cluster Evander Mines Ann Prod: 50-60koz FY25-FY26 es

  8. Slide 8: Increased Production and Reduced Costs Through Value Accretive Projects

    GROUP OVERVIEW XXX GROUP OVERVIEW INCREASED PRODUCTION AND REDUCED COSTS THROUGH VALUE ACCRETIVE PROJECTS PAR Group gold production profile 300 000 ~250,000oz 250 000 205,7Koz ~220,000oz# 201,8Koz c.180,000-190,000oz AISC $1259/oz 25Koz AISC $1261/oz AISC $1325-1350/oz 200 000 175,2Koz AISC $950/oz

  9. Slide 9: Our Operating Environment

    Group overview Our operating environment H1 FY2024 – Key features H1 FY2024 Performance by operation Group AISC Capital projects (ZAR) ESG: Our “Beyond compliance” approach Sector leading dividend Exploration – Republic of the Sudan FY2024 – Focused on execution Appendix GROUP OVERVIEW

  10. Slide 10: Our Operating Environment

    OUR OPERATING ENVIRONMENT XXX OUR OPERATING ENVIRONMENT 140 YEAR TRACK RECORD OF OPERATING SUCCESSFULLY IN SOUTH AFRICA ELECTRICITY AND SA REGULATORY SECURITY AND PUBLIC/PRIVATE STAKEHOLDER ENGAGEMENT FRAMEWORK COLLABORATION • National grid power to Group mining • Multi-facetted engagements with all

  11. Slide 11: Renewable Energy Roadmap

    OUR OPERATING ENVIRONMENT XXX OUR OPERATING ENVIRONMENT OPERATING SUCCESSFULLY IN SOUTH AFRICA – RENEWABLE ENERGY ROADMAP Current pipeline of Group renewable energy projects 45% 40,0% 80MW of 40% Commission installed solar 8.75MW solar PV 35,4% PV renewable Commissioned Expand Evander 35% 1st 9.9MW

  12. Slide 12: H1 FY2024 Key Features

    Group overview Our operating environment H1 FY2024 – Key features H1 FY2024 Performance by operation Group AISC Capital projects (ZAR) ESG: Our “Beyond compliance” approach Sector leading dividend Exploration – Republic of the Sudan FY2024 – Focused on execution Appendix GROUP OVERVIEW

  13. Slide 13: H1 FY2024 Key Features: Operational and Financial Performance

    H1 FY2024 KEY FEATURES XXX H1 FY2024 KEY FEATURES OPERATIONAL AND FINANCIAL PERFORMANCE PRODUCTION PERFORMANCE COST PERFORMANCE FINANCIAL PERFORMANCE Group gold production of 98,458oz  Group AISC  0.3% to US$1,287/oz Robust performance in H1 FY24 6.7% (H1 FY23 US$1,291/oz) – despite • Profit for t

  14. Slide 14: Gold Price Received and Margins

    H1 FY2024 KEY FEATURES XXX GOLD PRICE RECEIVED AND MARGINS PROFITABILITY DRIVEN BY ZAR/KG GOLD PRICE AND COMPETITIVE UNIT COSTS Profitability gap widening as annual production Gold price received vs AISC ramps up to ~250Koz 1 400 000 • Well positioned to capitalise on increasing AISC ZAR/kg Average

  15. Slide 15: H1 FY2024 Performance by Operation

    Group overview Our operating environment H1 FY2024 – Key features H1 FY2024 Performance by operation Group AISC Capital projects (ZAR) ESG: Our “Beyond compliance” approach Sector leading dividend Exploration – Republic of the Sudan FY2024 – Focused on execution Appendix GROUP OVERVIEW

  16. Slide 16: Tailings Operations – Elikhulu

    H1 FY2024 PERFORMANCE BY OPERATION XXX PERFORMANCE BY OPERATION TAILINGS OPERATIONS – ELIKHULU • Production  8.8% to 28,106oz (H1 FY23: 25,830oz) Elikhulu LOM production profile* • Improved overall metallurgical recovery of 34.9% (H1 FY23: 32.3%) 80 000 • AISC of US$979/oz (H1 FY23: US$947/oz) – on

  17. Slide 17: Tailings Operations – BTRP and Sheba Fault Project

    H1 FY2024 PERFORMANCE BY OPERATION XXX PERFORMANCE BY OPERATION TAILINGS OPERATIONS – BTRP AND SHEBA FAULT PROJECT • Production remained consistent at 9,864oz (H1 FY23: 10,012oz) BTRP LOM extension: Sheba Fault Project • Lowest cost of production in the Group • Royal Sheba and Western Cross orebodie

  18. Slide 18: Tailings Retreatment Operations – Mintails

    H1 FY2024 PERFORMANCE BY OPERATION XXX PERFORMANCE BY OPERATION TAILINGS RETREATMENT OPERATIONS – MINTAILS October 2022 – Closure of transaction to acquire total share claims and capital of • 800ktpm processing plant design based on successful Elikhulu and BTRP operations Mogale Gold and Mintails SA

  19. Slide 19: Mogale Tailings Retreatment Plant Construction Timeline

    H1 FY2024 PERFORMANCE BY OPERATION XXX PERFORMANCE BY OPERATION MOGALE TAILINGS RETREATMENT PLANT CONSTRUCTION IN PROGRESS – TIMELINE TO COMMISSIONING PROPOSED PROJECT EXECUTION TIMELINE ACTIVITY ESTIMATED DATE Completion and finalisation of DFS Completed  Engineering optimisation activities Comple

  20. Slide 20: Building a World Class Surface Tailings Retreatment Business

    H1 FY2024 PERFORMANCE BY OPERATION XXX PERFORMANCE BY OPERATION BUILDING A WORLD CLASS SURFACE TAILINGS RETREATMENT BUSINESS Elikhulu and Mintails production profile 140 000 Forecast 120 000 Gold production (oz) 100 000 Actual 80 000 60 000 40 000 20 000 0 2022 2023 2024 2025 2026 2027 2028 2029 203

  21. Slide 21: Evander Underground

    H1 FY2024 PERFORMANCE BY OPERATION XXX PERFORMANCE BY OPERATION EVANDER UNDERGROUND EVANDER 8 SHAFT • Production  11.1% to 21,307oz in H1 FY24 (H1 FY23: 19,173oz) • Tons milled  16% to 89,7Kt u/g tons milled at 7.4g/t (H1 FY23: 73,9Kt at 8.1g/t) • AISC of US$1,228/oz (H1 FY23: US$1,052/oz) – incre

  22. Slide 22: Barberton Mines – Fairview Mine

    H1 FY2024 PERFORMANCE BY OPERATION XXX PERFORMANCE BY OPERATION BARBERTON MINES FAIRVIEW MINE Initiatives implemented to improve gold production • Continuous operations cycle • Gold production  17% to 22,194oz (H1 FY23: 19,041oz) • Average u/g RoM volumes from MRC and Rossiter orebodies improved to

  23. Slide 23: Operational Overview

    Group overview Our operating environment H1 FY2024 – Key features H1 FY2024 Performance by operation Group AISC Capital projects (ZAR) ESG: Our “Beyond compliance” approach Sector leading dividend Exploration – Republic of the Sudan FY2024 – Focused on execution Appendix OPERATIONAL OVERVIEW

  24. Slide 24: Group AISC

    GROUP AISC XXX GROUP AISC H1 FY2024 – GUIDING AISC OF US$1,325/oz – US$1,350/oz IN FY2024* Lower cost operations Evander Barberton Total lower surface Evander Mines’ cost % Group sources BTRP Elikhulu underground Fairview operations production AISC per kg (ZAR/kg) 1,187,909 390,830 588,435 738,070 8

  25. Slide 25: Group AISC: FY2024 AISC Outlook vs Peers

    US$/oz GROUP AISC 200 400 600 0 800 1 000 1 200 1 400 1 600 2 000 1 800 Endeavour Mining Alamos Gold GROUP AISC West African Resources OTCQX: PAFRF/PAFRY | AIM: PAF | JSE: PAN FY 2024 – AISC OUTLOOK PAR - lower cost operations Centamin B2Gold Corp Shanta Gold PAR Group Source: Individual company web

  26. Slide 26: Group Overview

    Group overview Our operating environment H1 FY2024 – Key features H1 FY2024 Performance by operation Group AISC Capital projects (ZAR) ESG: Our “Beyond compliance” approach Sector leading dividend Exploration – Republic of the Sudan FY2024 – Focused on execution Appendix GROUP OVERVIEW

  27. Slide 27: Capital Projects (ZAR)

    CAPITAL PROJECTS (ZAR) XXX CAPITAL PROJECTS (ZAR) INVESTMENT IN ORGANIC GROWTH AND MTR – INCREASING OUR PRODUCTION PROFILE 3 500 3 000 2 500 ZARm 2 000 1 500 1 000 500 0 2021 2022 2023 2024 FC MTR Project 156 1 400 (US$ 76m) Elikhulu - Mostly expansion 64 168 305 270 (US$ 15m) Evander 195 430 1 088

  28. Slide 28: ESG: Our Beyond Compliance Approach

    Group overview Our operating environment H1 FY2024 – Key features H1 FY2024 Performance by operation Group AISC Capital projects (ZAR) ESG: Our “Beyond compliance” approach Sector leading dividend Exploration – Republic of the Sudan FY2024 – Focused on execution Appendix ESG : OUR “BEYOND COMPLIANCE

  29. Slide 29: ESG: Our Beyond Compliance Approach

    ESG XXX ESG: OUR “BEYOND COMPLIANCE” APPROACH GOVERNANCE ENVIRONMENT SOCIAL SOCIAL AND COMPLIANCE WATER RECYCLING STAKEHOLDER ENGAGEMENT SUSTAINABLE COMMUNITIES FULLY COMPLIANT WITH GRI REPORTING Responsible and sustainable water use • Engagement forums with communities and Barberton Blueberries far

  30. Slide 30: Sector Leading Dividend

    Group overview Our operating environment H1 FY2024 – Key features H1 FY2024 Performance by operation Group AISC Capital projects (ZAR) ESG: Our “Beyond compliance” approach Sector leading dividend Exploration – Republic of the Sudan FY2024 – Focused on execution Appendix SECTOR LEADING DIVIDEND

  31. Slide 31: Shareholder Returns

    SHAREHOLDER RETURNS XXX SHAREHOLDER RETURNS DIVIDEND YIELD Historic dividend yield – record of returning cash to shareholders 7% 6,3% 5,9% 6% 5,6% 5,3% 5,1% 5,0% 5% 4,6% 4% 3,8% 3% 2% 1,2% 1% 0,0% 0% # June 14 June 15 June 16 June 17 June 18* June 19 June 20 June 21 June 22 June 23 * Dividend suspen

  32. Slide 32: Exploration – Republic of the Sudan

    Health and safety Group overview Our operating environment H1 FY2024 – Key features H1 FY2024 Performance by operation Group AISC Capital projects (ZAR) ESG: Our “Beyond compliance” approach Sector leading dividend Exploration – Republic of the Sudan FY2024 – Focused on execution Appendix EXPLORATIO

  33. Slide 33: Exploration – Republic of the Sudan

    EXPLORATION – REPUBLIC OF THE SUDAN XXX EXPLORATION – REPUBLIC OF THE SUDAN WHY SUDAN? PROGRESS IN FY2024 Third largest gold producer in Africa (after Ghana and SA) and Exploration activities resumed in Q1 FY24, following a detailed 10th in the world (2021) risk assessment of the in-country operatin

  34. Slide 34: Focused on Execution

    Group overview Our operating environment H1 FY2024 – Key features H1 FY2024 Performance by operation Group AISC Capital projects (ZAR) ESG: Our “Beyond compliance” approach Sector leading dividend Exploration – Republic of the Sudan FY2024 – Focused on execution Appendix FOCUSED ON EXECUTION

  35. Slide 35: FY2024: Focused on Execution

    FY2024 – FOCUSED ON EXECUTION XXX FY2024: FOCUSED ON EXECUTION  Continue with focus on health and safety initiatives in our proactive journey to ‘zero harm’  Monitor the Group’s optimisation and improvement initiatives intended to increase production and reduce costs  Successfully execute capital

  36. Slide 36: Thank you

    XXX Thank you Contact: Hethen Hira, Head of investor relations Email: Hhira@paf.co.za www.panafricanresources.com OTCQX: PAFRF/PAFRY | AIM: PAF | JSE: PAN www.panafricanresources.com 36

  37. Slide 37: Appendix

    Group overview Our operating environment H1 FY2024 – Key features H1 FY2024 Performance by operation Group AISC Capital projects (ZAR) ESG: Our “Beyond compliance” approach Sector leading dividend Exploration – Republic of the Sudan FY2024 – Focused on execution Appendix APPENDIX

  38. Slide 38: Health and Safety

    APPENDIX XXX HEALTH AND SAFETY GROUP SAFETY PERFORMANCE – H1 FY2024 Group TRIFR improved by 39.3% to 6.13 (H1 FY23: 8.54) per million-man hours Excellent operational safety performance • LTIFR remained stable at 2.54 (H1 FY23: 2.54) per million-man hours Evander Mines’ underground operations LTIFR a

  39. Slide 39: Reserves and Resources

    APPENDIX XXX RESERVES AND RESOURCES GROWTH PORTFOLIO – ROBUST PROJECT PIPELINE Tonnes Grade Gold Gold Gold Mineral Resources* Mt g/t t Moz Barberton hard rock 24.5 4.2 102.1 3.3 BTRP 22.3 1.2 26.0 0.8 Evander underground 111.1 9.1 1 009.0 32.4 Elikhulu 163.4 0.3 44.2 1.4 Elikhulu 259.8 0.3 78.5 2.5

Pan African Resources — Gold Forum Europe 2024 on 6ix