Tg Metals Ltd. · ASX:TG6

Tg Metals — RIU Sydney Resources Roundup May 2025

14 slides from Tg Metals's conference presentation, May 6, 2025

  1. Slide 1: Driving Towards Development – Van Uden Gold Project

    For personal use only DRIVING TOWARDS DEVELOPMENT VAN UDEN GOLD PROJECT Western Australia Resources Roundup - May 2025 ASX:TG6

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation has been prepared by TG Metals Limited. The information contained in this presentation is not investment FORWARD LOOKING STATEMENT or financial product advice and is not intended to be used as the basis for making an investment decision. The presentation This presentatio

  3. Slide 3: Reviving Forrestania's Gold Legacy

    REVIVING FORRESTANIA’S GOLD LEGACY Van Uden Gold Project – 80% interest in granted mining leases & exploration licences. Remaining 20% held by regional gold producer Updating MRE to JORC 2012 Compliance – Adding in recent drilling (2020 – 2024) and adding in the surface laterite For personal use onl

  4. Slide 4: Gold Project – Size and Room to Grow

    VAN UDEN GOLD PROJECT – SIZE AND ROOM TO GROW ▪ Extensive Drill Database – Mineralisation drilled strike length over For personal use only 2.5km on the mafic and sediments contact ▪ Historically focused – Drilling focused on one small area of the host contact structure. More strike length to explore

  5. Slide 5: Gold Project – A High-Grade Asset with Strong Upside

    VAN UDEN GOLD PROJECT – A HIGH-GRADE ASSET WITH STRONG UPSIDE ▪ High-Grade Open Pit Gold Asset – Advanced project with historic open pit production at >2.5g/t Au ▪ Exploration Upside – Historic For personal use only drilling only to 150m, providing exploration upside down dip and along +2.5km strike

  6. Slide 6: Corporate Overview

    CORPORATE OVERVIEW Capital Structure Shareholder Composition Top 50 Shareholders 64.28% Shares on Issue Cash & Receivables1 Market Cap2 Directors & Management 9.04% 80.2M $2.0M $10.0M For personal use only 1 2 Montague Resources Australia 7.12% at 1 May 2025 at $0.12.5 share price Founders 20.56% Un

  7. Slide 7: Project Overview

    PROJECT OVERVIEW ▪ Strategic Location – Situated in Forrestania Greenstone Belt, in proximity to TG6's Lake Johnston Project ▪ Proximity to Processing Facilities – Trucking distance on For personal use only sealed roads to Marvel Loch and Edna May (Westonia) gold processing Plants ▪ Established Infr

  8. Slide 8: Deposit Re-Interpretation

    VAN UDEN DEPOSIT RE-INTERPRETATION For personal use only *Refer to website tgmetals.com.au for interpretation flythrough 8

  9. Slide 9: Project – Tasman Open Pit

    VAN UDEN PROJECT – TASMAN OPEN PIT HIGH GRADE AT SHALLOW DEPTHS ▪ Previous small-scale mining to less than 30m depth produced 136,023t @ 2.54g/t Au for 11,142oz Au* ▪ Mineralisation within pit floors (pit depth approx. 30m) and extending down dip and open IMMEDIATE FOCUS For personal use only ▪ New

  10. Slide 10: Project – Diemens Open Pit

    VAN UDEN PROJECT – DIEMENS OPEN PIT HIGH GRADE AT SHALLOW DEPTHS ▪ Previous small-scale mining, for a dump leach trial 1990 ▪ Mineralisation within pit floors (pit depth less than 30m) and extending down dip and open For personal use only NEAR-TERM POTENTIAL ▪ Evaluate extensive near-surface laterit

  11. Slide 11: Gold City Prospect

    GOLD CITY PROSPECT ▪ Previous small scale mining – no historic production records ▪ Multiple gold lodes defined by drilling ▪ Opportunity for additional drilling to define initial resource – open at depth and along strike ▪ Potential for value adding incremental discoveries For personal use only OPE

  12. Slide 12: Value Proposition – Strategic Addition and Synergies

    VALUE PROPOSITION - STRATEGIC ADDITION AND SYNERGIES Dual Commodity Strength – Diversifies risk through gold & lithium exposure, maximising market opportunities For personal use only Strategic Expansion – Van Uden Gold adds a second high-value asset alongside Lake Johnston Lithium Fast-Track Potenti

  13. Slide 13: Next Steps

    NEXT STEPS Define 2012 JORC Exploration Near-Term For personal use only Compliant Resource Plans Production • Resource Estimation – Underway, • Sample & Assess Historic Surface • Stockpile Evaluation – Assess scale, integrating existing and new drill data, Stockpiles – POW submitted for sonic grade,

  14. Slide 14: Thank You

    ASX:TG6 | tgmetals.com.au For personal use only THANK YOU FOR MORE INFORMATION David Selfe – CEO Email: dselfe@tgmetals.com.au Richard Bevan - Chairperson Email: rbevan@tgmetals.com.au

TG Metals — RIU Sydney Resources Roundup May 2025 on 6ix