Dakota Gold Corp. · AMEX:DC
Dakota Gold — Technical Presentation (November 2026)
38 slides from Dakota Gold's technical presentation, Nov 23, 2026

Slide 1: Richmond Hill Gold Project Pre-Feasibility Study Webcast Presentation
Richmond Hill Gold Project Pre-Feasibility Study Webcast Presentation | November 23, 2026 dakotagoldcorp.com NYSE American: DC

Slide 2: Company Overview and PFS Highlights
COMPANY OVERVIEW PFS HIGHLIGHTS dakotagoldcorp.com | NYSE-A: DC 2 JACK HENRIS CEO, PRESIDENT & DIRECTOR

Slide 3: Cautionary Note Regarding Forward-Looking Statements
dakotagoldcorp.com | NYSE-A: DC 3 Cautionary Note Regarding Forward-Looking Statements This presentation and the accompanying webcast contain “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934, which are

Slide 4: PFS supports simple, open pit, heap leach project
4 Richmond Hill – PFS supports simple, open pit, heap leach project dakotagoldcorp.com | NYSE-A: DC AFTER-TAX NPV 5% US$2.0 B US$2.7 B AFTER-TAX IRR 71% 94% AFTER-TAX PAYBACK 1.4 YEARS 1.1 YEARS LOM AISC US$1,289/oz Au US$1,357/oz Au US$538 M INITIAL CAPITAL (41KTPD stacking rate) 1.6 Moz GOLD LOM

Slide 5: Upside potential: growth potential
5 UPSIDE POTENTIAL 90mt of Leachable Inferred Material Across the Project 2026-2027 DEFINITION DRILL PROGRAM UNDERWAY Targeting Increase in Reserve For Feasibility Study Inferred Material Conversion in High-Recovery Breccia Zone Not Included in the Pre-Feasibility Study Economics, Mine Sequence and

Slide 6: Richmond Hill Recap of Heap Leach Resource and Exploration Potential
RICHMOND HILL recap of HEAP LEACH RESOURCE and EXPLORATION POTENTIAL dakotagoldcorp.com | NYSE-A: DC 6 LINDSAY CHASTEN SENIOR EXPLORATION MANAGER

Slide 7: Reserve and Resource review
dakotagoldcorp.com | NYSE-A: DC 7 Richmond Hill – Reserve and Resource review dakotagoldcorp.com | NYSE-A: DC PFS Mineral Reserve and Resource - November 2026 • Heap Leachable Mineral Reserve: • 2.2 M oz of P&P Gold • 25.4 M oz of P&P Silver • Milled Mineral Resource: • The additional Milled materia

Slide 8: Heap leachable reserves and resources
dakotagoldcorp.com | NYSE-A: DC 8 Richmond Hill – Heap leachable reserves and resources Richmond Hill Heap Leachable Reserves Category NSR ($/tonne) Ktonnes Gold (g/tonne) Silver (g/tonne) Gold (koz) Silver (koz) Proven 36.57 57,115 0.613 7.33 1,126 13,457 Probable 30.99 62,482 0.514 5.96 1,033 11,9

Slide 9: Drilling filled M&I gaps between the IA and PFS
Drilling filled M&I gaps between the IA and PFS Section 3760 m / 12332 ft North IA model • February 2025 PFS model • November 2026 M&I blocks • 10 m slices • 100 m grid 100 m grid • Showing PFS M&I and MI&I shells N Section location W E W E dakotagoldcorp.com | NYSE-A: DC 9

Slide 10: Drilling filled M&I gaps between the IA and PFS
Drilling filled M&I gaps between the IA and PFS Section 5000 m / 13448 ft North IA model • February 2025 PFS model • November 2026 M&I blocks • 10 m slices • 100 m grid 100 m grid • Showing PFS M&I and MI&I shells N Section location W E W E dakotagoldcorp.com | NYSE-A: DC 10

Slide 11: Opportunities for resource growth
Opportunities for resource growth dakotagoldcorp.com | NYSE-A: DC 11 SW NE 500 m N 500 m N Section Showing M&I Blocks Only • 50 meter thick slice • 100 m vertical grid • The 2026-2027 Definition Drill Program includes approximately 11,000 meters in 123 holes and is designed to test the potential to

Slide 12: Richmond Hill PFS Supports Efficient, Open Pit Heap Leach Operation
dakotagoldcorp.com | NYSE-A: DC 12 MIKE EISELEIN VICE PRESIDENT PROJECT DEVELOPMENT RICHMOND HILL PFS SUPPORTS EFFICIENT, OPEN PIT HEAP LEACH OPERATION

Slide 13: PFS led by M3 with environmental sub-contractors
13 dakotagoldcorp.com | NYSE-A: DC Richmond Hill – PFS led by M3 Environmental sub-contractors supporting permit engineering Lead Study Manager Environmental & Water Treatment Heap Leach Design, Closure & Reclamation Metallurgy • LifeCycleGeo • Geosyntec • Air Sciences • HDR • BKS Environmental Asso

Slide 14: Pre-Feasibility Key Parameters
dakotagoldcorp.com | NYSE dakotagoldcorp.com | NYSE-A: DC 14 Pre-Feasibility Key Parameters (All Currencies in US$) Key Assumptions Base Case Gold Price $3,500/oz Base Case Silver Price $50.00/oz Production Profile Total Tonnes Processed (Mt) 120 Strip Ratio 1.18 Heap Leach Gold Feed Grade (oz/ton)

Slide 15: PFS plan production & cost profile
15 dakotagoldcorp.com | NYSE-A: DC Richmond Hill – PFS plan production & cost profile 0.62 0.66 0.54 0.42 0.44 0.62 0.77 0.40 0.71 - 50 100 150 200 250 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 Gold Production (1,000’s oz) Gold Equiv Prod (kozs) Gold Prod (kozs) Gold Gr

Slide 16: Richmond Hill mine schedule profile
dakotagoldcorp.com | NYSE-A: DC 16 • Eight-year mining, focusing on grade and recoveries to bring value forward • Years 1 – 2: Sub-phasing high grade smaller pits • Years 3 – 5: Higher value ultimate pits • Years 6 – 8: Final pits and mining • Conventional truck & shovel open pit operation • Loading

Slide 17: Richmond Hill mine production schedule
dakotagoldcorp.com | NYSE-A: DC 17 Richmond Hill - Mine production schedule PP YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 Waste (ktonnes) 1,984 15,529 22,761 19,621 18,571 18,451 20,775 8,092 14,823 Transition Resource Stockpile (ktonnes) 475 1,150 943 1,739 2,842 2,424 612 169 284 Oxid

Slide 18: Heap leach pad production profile
Richmond Hill - Heap leach pad production profile • Quick recovery – 30-to-45-day average leach cycle to achieve a projected LOM pad recovery of 72.4% • Heap leach pad with Merrill Crowe processing designed for with a capacity of 41ktpd but with potential future expansion to 54ktpd • Residual produ

Slide 19: PFS capital cost details
dakotagoldcorp.com | NYSE dakotagoldcorp.com | NYSE-A: DC 19 Richmond Hill – PFS capital cost details Capital cost estimate based on open pit mining utilizing a single heap leach pad, truck and shovel operation with Merrill Crowe processing with a capacity of 41ktpd Initial Capital Costs • 18-month

Slide 20: PFS proposed infrastructure
Richmond Hill – PFS proposed infrastructure 20 • 725 acres of disturbance is anticipated with the initial permit • Large single heap leach with capacity for 154mt, with strong natural buttressing and built for the final 40mt to be “on -off” and reusable • Small overall crushing plant footprint consi

Slide 21: Richmond Hill processing flow sheet
21 dakotagoldcorp.com | NYSE-A: DC Three stage, crush, shovel and truck operation processing ~41kTPD Richmond Hill - Processing flow sheet dakotagoldcorp.com | NYSE-A: DC 21

Slide 22: PFS operating cost details
dakotagoldcorp.com | NYSE dakotagoldcorp.com | NYSE-A: DC 22 Richmond Hill – PFS operating cost details Operating Cost Items LOM (US$M) US$/tonne leached US$/oz Au Mining $787.9 $6.59 $505 Processing $581.0 $4.86 $372 Mine Site G&A $148.7 $1.24 $95 Refining $8.5 $0.07 $6 Total Operating Costs $1,526

Slide 23: Richmond Hill Metallurgy
Richmond Hill - Metallurgy Positive Metallurgical Results • 24 master-composite column tests and 110 bottle-roll tests confirmed that Richmond Hill is amenable to heap leaching, with positive gold recoveries supporting the Pre-Feasibility Study CN/FA & Sulfur content drive material classification •

Slide 24: Richmond Hill location and infrastructure
24 dakotagoldcorp.com | NYSE-A: DC Richmond Hill - Location and infrastructure Location: • Project 15-minute drive from headquarters in Lead, SD Labor: • South Dakota provides access to labor for exploration through to production • Population catchment of 200,000 within a one-hour drive of the proje

Slide 25: Richmond Hill PFS Outlines Profitable Operation
RICHMOND HILL PFS OUTLINES PROFITABLE OPERATION dakotagoldcorp.com | NYSE-A: DC 25 SHAWN CAMPBELL CHIEF FINANCIAL AND DEVELOPMENT OFFICER

Slide 26: PFS strong economics
26 dakotagoldcorp.com | NYSE-A: DC Richmond Hill – PFS strong economics • The PFS has robust project economics, including a $2.0 billion NPV(5%), 71% IRR and a payback of only 1.4 years at a base case gold price of $3,500/oz. The financial metrics remain robust in a lower gold price environment, an

Slide 27: PFS after-tax free cash flow profile
27 dakotagoldcorp.com | NYSE-A: DC ($471) ($170) $214 $600 $843 $1,126 $1,576 $2,168 $2,458 $2,627 $2,631 $2,558 $2,558 -471 ($53) $448 $944 $1,269 $1,639 $2,209 $2,949 $3,323 $3,535 $3,539 $3,462 $3,462 ($500) $0 $500 $1,000 $1,500 $2,000 $2,500 $3,000 $3,500 $4,000 PRE-PROD YEAR 1 YEAR 2 YEAR 3 YE

Slide 28: Strong project financial metrics
28 dakotagoldcorp.com | NYSE-A: DC Richmond Hill – Strong project financial metrics $3,500/oz Au (Base Case) $4,250/oz Au Net Present Value discounted at 5% to Initial Capital Cost Ratio NPV5% @ $3,500/ oz Gold Price $2,000 M $2,744 M Initial Capital Cost $538 M $538 M Ratio of NPV5%: CAPEX 3.7 X 5.

Slide 29: Opportunity for increased valuation
dakotagoldcorp.com | NYSE-A: DC 29 Opportunity for increased valuation • Opportunity for $EV/oz of Resources and Reserves valuation to increase as Richmond Hill advances through Feasibility Study and into Production. Source: CIBC Weekly Mining Comps as at Nov 2, 2026 Developer US$EV/ RESOURCE oz Dev

Slide 30: Illustrative peer production multiples
dakotagoldcorp.com | NYSE-A: DC 30 Illustrative peer production multiples Source: CIBC Weekly Mining Comps Report as of Nov 2, 2026 1.TEV = market cap + net debt + non-controlling interest + preferred shares 2.Analyst consensus estimates. COMPANY TEV (US$M)1 2026E Prod'n (AuEq koz)2 170 KOZPA as % o

Slide 31: Value Creation Opportunity
VALUE CREATION OPPORTUNITY dakotagoldcorp.com | NYSE-A: DC 31 JACK HENRIS CEO, PRESIDENT & DIRECTOR

Slide 32: Targeting first gold production in 2029
32 dakotagoldcorp.com | NYSE-A: DC 1. See news release Feb 6, 2025 re Barrick Gold has extended the option period for the Richmond Hill option agreement until December 31, 2028 with Dakota Gold. 2026 2027 2028 2029 2030 - Targeting first gold production in 2029 through a disciplined, phased responsi

Slide 33: Homestake District: one location, multiple opportunities
dakotagoldcorp.com | NYSE-A: DC 33 HOMESTAKE DISTRICT ~50K MINERAL ACRES One concentrated land position 2 core project areas + district-wide upside One location. Multiple opportunities. Dakota Gold’s land package creates a diversified project-development portfolio in one of America’s most prolific g

Slide 34: Questions and Answers
dakotagoldcorp.com NYSE American: DC Richmond Hill Gold Project Pre-Feasibility Study QUESTIONS and ANSWERS

Slide 35: Media and Investor Relations
MEDIA AND INVESTOR RELATIONS Jack Henris Chief Executive Officer, President and Director O +1 605 717 2540 Shawn Campbell Chief Financial and Development Officer O +1 778 655 9638 Carling Gaze Director of Investor Relations O +1 605 679 7429 E info@dakotagoldcorp.com LEAD MAIN OFFICE 106 Glendale Dr

Slide 36: Appendix
dakotagoldcorp.com | NYSE-A: DC 36 APPENDIX

Slide 37: Millable Resources
dakotagoldcorp.com | NYSE-A: DC 37 Richmond Hill – Millable Resources Notes: • Based on a constrained block model using drill results up to June 17, 2026, with estimation using inverse distance squared methodology. • A gold price of $2,900 per ounce and a silver price of $35 per ounce was used for t

Slide 38: Combined Heap Leachable and Millable Resources Inclusive of Reserves
dakotagoldcorp.com | NYSE-A: DC 38 Richmond Hill – Combined Heap Leachable and Millable Resources Inclusive of Reserves Notes: • Based on a constrained block model using drill results up to June 17, 2026, with estimation using inverse distance squared methodology. • A gold price of $2900 per ounce a
Source: SEC EDGAR · 8-K filed Nov 23, 2026
More decks from Dakota Gold Corp.
Investor Presentation (November 2026)30 slides · November 2026
LD Micro 20th Annual Main Event (October 2026)21 slides · Oct 21, 2026
Investor Presentation (October 2026)30 slides · October 2026
38th Annual Mining Forum Americas (September 2026)18 slides · Sep 29, 2026
Precious Metals Summit Beaver Creek 202614 slides · Sep 24, 2026
H.C. Wainwright & Co. 28th Annual Global Investment Conference (September 2026)22 slides · Sep 14, 2026