Esgold Corp · CSE:ESAU

Esgold — Investor Presentation (September 2022)

40 slides from Esgold's investor presentation, September 2022

  1. Slide 1: ESGold Corp.

    ESGold Corp. SEPTEMBER 2022 CSE: ESAU | OTC: ESAUZF | FSE: N2W esgold.ca

  2. Slide 2: Forward-Looking Statements

    FORWARD-LOOKING STATEMENTS This presentation contains certain statements that may be deemed “forward-looking statements”. All statements, other than statements of historical fact, that address events or developments that ESGold Corp. expects to occur, are forward-looking statements. Forward-looking

  3. Slide 3: Content

    CONTENT 1 ESGOLD OVERVIEW 4 EAGLE RIVER PROJECT 2 MONTAUBAN PROJECT 5 APPENDICES 3 OTTAWA RIVER PROJECT 3

  4. Slide 4: ESGold Overview

    @ ESGOLD OVERVIEW —_—

  5. Slide 5: 2022 Outlook

    2022 OUTLOOK VALUE DRIVERS MONTAUBAN – ROAD TO PRODUCTION MONTAUBAN - HARD ROCK OTTAWA RIVER – GOLD RECOVERY EXPLORATION ▰ Projected is fully permitted to operate ▰ LOW-COST OPPORTUNITY to validate 1000m/t per day Merrill-Crowe closed circuit ▰ Company estimates it could add up the MINT LOSS GOLD LE

  6. Slide 6: Business Overview

    BUSINESS OVERVIEW ▰ Formed in 2004 and traded on the CSE (CSE:ESAU), ESGold is headquartered in Vancouver, BC ESGold is a Canadian gold ▰ The company is developing the Montauban Mine project to profitably exploration company based extract significant residue minerals while restoring and returning th

  7. Slide 7: Management Team

    MANAGEMENT TEAM Jean Yves Therien Rebecca Ong James Chandik CEO CFO VP Government Relations •Mr. Therien has more than 12 years of senior •Has over 30 years of experience in finance in •Has been President & CEO of DNA Precious management experience in mining and green public reporting, investment ba

  8. Slide 8: Advisory Board

    ADVISORY BOARD James Rogers Ron Perry Michel Fontaine •James is a resource professional and •Mr. Perry is an experienced entrepreneurial •Mr. Fontaine is a private investor, entrepreneur, entrepreneur active in the exploration and executive with a demonstrated history of and independent board member

  9. Slide 9: Board of Directors

    BOARD OF DIRECTORS Vikas Ranjan Paul Mastantuono Brad Kitchen Martin Prescott Director COO & Director President Director •Management professional with an MBA •Started a transportation company in •31 years of experience in investment •Mr. Prescott has over 25 years of in Finance from McGill Universit

  10. Slide 10: Share Structure

    SHARE STRUCTURE Description Number of shares As of May 25, 2022 Total outstanding shares 202,541,869 Options/warrants outstanding* 7,263,750 Obligation to issue shares - Montauban Project 50,000,000 Total outstanding shares - existing 259,805,619 *6 500 00 @ 0.15$, 763 750 @0.185 $ 10

  11. Slide 11: Montauban Project

    @ MONTAUBAN PROJECT —_— -

  12. Slide 12: Montauban Highlights

    MONTAUBAN HIGHLIGHTS PROJECT HIGHLIGHTS GOLD AND SILVER RESOURCE ▰ Fully permitted processing operations for Tailings 1,000 t/d mill ▰ 2019 Mineral Resource Estimate (MRE) ▰ Mill building and infrastructure, including of 462,000 tonnes grading 0.31 g/t Au hydro, is completed and 32.68 g/t Ag ▰ Mill

  13. Slide 13: Drill Program at Montauban

    DRILL PROGRAM AT MONTAUBAN ▰ Systematic Tailings Drill Program of approximately 275 sonic holes at 25 meter spacing. ▰ All five (5) tailings sites are targeted for the first time. ▰ Program designed to fill gaps in historic information with higher density of holes and up to date gold and silver anal

  14. Slide 14: The Montauban Site Opportunity

    THE MONTAUBAN SITE OPPORTUNITY ▰ With the right support and investment, a contaminated site can be an opportunity for companies that can process mine tailings while restoring the sites back to a natural “green” state. ▰ This includes the Montauban site, which has the status of an abandoned site sinc

  15. Slide 15: ESGold's Montauban Business Model

    ESGOLD’S MONTAUBAN BUSINESS MODEL ESGold Corp. has a viable solution, which encompasses the restoration of contaminated tailings sites and the extraction of precious metals including gold and silver as well as industrial minerals such as mica, and directing a portion of anticipated profits to furthe

  16. Slide 16: The Montauban Project Site

    THE MONTAUBAN PROJECT SITE The property is located approximately 80 km west of Quebec City and approximately 60 km north of Trois-Rivières, in the Montauban Township in the Portneuf County, Quebec 16

  17. Slide 17: The Montauban Project Site

    THE MONTAUBAN PROJECT SITE APPROXIMATELY 700 METERS LONG 17

  18. Slide 18: Project Description

    PROJECT DESCRIPTION ▰ In October of 2014, an NI 43-101 Technical Report reported that the Anacon Lead 1 tailings site contained an Inferred Resource* of 462,000 tonnes grading 0.31 g/t Au and 32.68 g/t Ag (for 4,570 total oz. gold and 485,630 total oz. silver). ▰ Anacon Production Target: Spring 202

  19. Slide 19: Claims & Permits

    CLAIMS & PERMITS ▰ 65 mining claims, approximately 1846 hectares located in the Montauban Mine Property, sector of the Notre-Dame-de- Montauban municipality, Quebec. ▰ Certificate of Authorization, Quebec Ministry of Environment, to operate a waste mine treatment plant in September 2012. ▰ Mill Buil

  20. Slide 20: Work Completed to Date by ESGold

    WORK COMPLETED TO DATE BY ESGOLD ▰ Over $9M has been invested in developing the Montauban opportunity. ▰ ESGold has obtained all the required permits to restore this contaminated site and has signed the required protocols with the municipality of Notre-Dame-de-Montauban. ▰ The company has completed

  21. Slide 21: 21

    21

  22. Slide 22: Plant site layout plan

    22 Park boundary of existing tailings pond PROCESSING MILL DRAIN PIPE @ = 280 mm FACILITY ° 25 50 7s x00m NEW ROUTE ON THE DAM EXISTING ACCESS ROAD ACCUMULATION BASIN PUMPING STATION Jcuent PRouecr re Leceno foare : Alphard 2012.9608 = DNA Precious Metals DNA-001 Layout plan for JDRAFTMAN 15608, BOU

  23. Slide 23: Project Investment Objectives

    PROJECT INVESTMENT OBJECTIVES 1 Secure private and public sector financing to begin production within six to nine months Process mining residues, recover the precious metals (gold, silver and industrial metal 2 muscovite (mica)) and restore the site (decontaminate) through treatment and neutralizati

  24. Slide 24: Overview of the Project's Capital Spending

    OVERVIEW OF THE PROJECT’S CAPITAL SPENDING Restoration Plan Tailing Pond and Outside Milling Processing Equipment Equipment The project will bring back to The project will mine the onsite tailing vegetation a mine that has 100 years accumulations that cover 1846 hectares The project will include an

  25. Slide 25: Capital Expenditures

    CAPITAL EXPENDITURES COMPONENT YEAR 1 TOTAL (IN CAD) % SPENT IN QUEBEC Processing plant inside equipment $9,704,000 100% Restoration Plan (Ministère des Ressources $769,178 100% naturelles (MERN)) Tailing pond $762,000 100% Process water pumping station $300,000 100% Other $225,000 100% Site assista

  26. Slide 26: Ottawa River Project

    © OTTAWA RIVER PROJECT —_— )

  27. Slide 27: Royal Mint Lost Gold Estimate

    ROYAL MINT LOST GOLD ESTIMATE ▰ The exact ounces of gold refined is unknown, ESTIMATED OUNCES FROM TO GROSS WEIGHT but archives indicate 225 M oz from 1908-1976. LOSSES LOST ▰ The metal recovery is unknown. However, 1908 1946 103,521,792 3% 3,105,654 “sweeps” (slag, fine particles, tails etc.) from

  28. Slide 28: Ottawa River Overview

    OTTAWA RIVER OVERVIEW OTTAWA RIVER PROJECT OVERVIEW OTTAWA RIVER PROJECT WORK PLAN AGREEMENT ▰ Historical information points to ▰ On July 18, 2022, ESGold will thousands of tonnes of waste from pre- ▰ NBJV has historically collected conduct an eight (8) day diving melt gold processing from the Canad

  29. Slide 29: Area of Interest

    AREA OF INTEREST ee Oe i a wah pin = : ee Troe’ | round —e Unc e Underground Discharge Outlet 1908 - 1938

  30. Slide 30: Eagle River Project

    © EAGLE RIVER PROJECT —_—_

  31. Slide 31: Eagle River Highlights

    EAGLE RIVER HIGHLIGHTS ▰ Acquired 386 claims (21,472 hectares) prior to a major staking rush in the Urban-Barry district ▰ Located south-east of Osisko’s Windfall Lake project ▰ On trend to the Windfall Lake project and adjacent to Bonterra’s Gladiator project ▰ Osisko is currently developing its Wi

  32. Slide 32: Corporate Directory

    CORPORATE DIRECTORY ESGold Corp. Jean Yves Therien CSE: ESAU | OTC: ESAUZF | FSE: N2W CEO 488 – 1090 W Georgia St. +1 514-668-2244 Vancouver, BC, V6E 3V7 Corporate line: 514-712-1532 32

  33. Slide 33: Appendices

    @ APPENDICES —_—

  34. Slide 34: The Milling Process

    THE MILLING PROCESS Grinding/Crushing/Milling Leaching Gold Separation 34

  35. Slide 35: Restoration Plan MERN Letters

    RESTORATION PLAN MERN LETTERS 35

  36. Slide 36: Montauban Property – Tests and Permits

    MONTAUBAN PROPERTY – TESTS AND PERMITS q In 2012, work started on securing all the necessary permits required for the commercial processing of 1,000 metric tonnes daily of mining residues q A mill building permit has been issued by the Municipality Notre-Dame-de-Montauban in the fall of 2012. q In a

  37. Slide 37: Processing Plant Inside Equipment

    PROCESSING PLANT INSIDE EQUIPMENT $9,704,000 Item Description Total Construction contract - Structural, Mechanical and $3,000,000 Piping Construction contract - Electricity $750,000 Construction contract - HVAC (includes HVAC units) $300,000 Fabrication contract - Tanks and Pumping boxes $1,200,000

  38. Slide 38: Restoration Plan (MERN)

    RESTORATION PLAN (MERN) $769,178 Item Description Total Restoration Plan (Ministère des Ressources naturelles) $769,178 Restoration Plan - Total $769,178 q Restoration will be completed in accordance with the MERN reporting and other requirements q All site water and diverted water flows will apply

  39. Slide 39: Tailing Pond (Dam) Tailings Map

    TAILING POND (DAM) $762,000 Item Description Total TAILINGS Construction contract - Excavation work and dike $700,000 construction Engineering $62,000 MAP Tailing Pond - Total $762,000 q The Montauban tailings sites are situated one kilometer west of Montauban-les-Mines with multiple land accesses q

  40. Slide 40: Process, Site Assistance, Immovable Assets & Other

    PROCESS, SITE ASSISTANCE, IMMOVABLE ASSETS & OTHER $695,000 Item Description Total Process – Outside Process Plant Fabrication contract : Repulper $60,000 Site Assistance Construction supervision $50,000 Pre-operational Verification $30,000 Start-up and ramp-up $30,000 Immovable Assets & Other Desig