Everlast Minerals Ltd · ASX:EV8

Everlast Minerals — IPO Roadshow (September 2024)

42 slides from Everlast Minerals's IPO roadshow presentation, September 2024

  1. Slide 1: Unlocking Bangladesh's Mineral Wealth – IPO Presentation

    Unlocking Bangladesh’s Mineral Wealth IPO Presentation September 2024 Everlast Minerals Ltd ASX: EM8 Picture: Company Land-based Wet Plant in Gaibandha

  2. Slide 2: Important Notice and Disclaimer

    Important Notice and Disclaimer Disclaimer for IPO Presentation - The following disclaimer applies to this IPO Presentation (Presentation). You Future performance - This Presentation contains forward looking statements, including statements regarding the should read this disclaimer carefully before

  3. Slide 3: Competent Person Statement and Disclaimer

    Competent Person Statement and Disclaimer Note: Extracted from the Independent Geologist Report (IGR) prepared by Geos Mining. 3 IPO Presentation

  4. Slide 4: Risk Factors

    Risk Risk Factors The Shares offered under the Prospectus are considered speculative. An investment in the Company is not risk free and the Directors strongly recommend that investors consider the risk factors described below, together with information contained elsewhere in this Prospectus, and con

  5. Slide 5: Today's Agenda

    1 Offer and Company Overview 2 Gaibandha Mineral Sands Project TODAY’S AGENDA 3 Industry Outlook 4 Future Growth 5 Appendix 5 IPO Presentation

  6. Slide 6: Offer and Company Overview

    01 Offer and Company Overview 6 IPO Presentation

  7. Slide 7: Investment Highlights

    Investment Highlights NEAR PRODUCTION GROWTH PRIME LOCATION INVESTMENT OPPORTUNITY • Large mineral sands project - effectively fully owned • Brahmaputra-Jamuna River carries huge volumes of and unencumbered sands every year which are deposited as sandbars and • 3 approved mining leases covering 2,39

  8. Slide 8: Company Overview

    Company Overview Headquartered in Sydney, Australia with a corporate office in Dhaka, Bangladesh, Everlast Minerals Ltd conducts Mineral Sands Exploration and Mining in Bangladesh. The Company's primary focus is the exploration, discovery and delineation of economic mineral sand deposits for advance

  9. Slide 9: Key Offer Details

    Key Offer Details Everlast Minerals Ltd is conducting a Public Offer to issue a minimum of 15,000,000 and up to 20,000,000 Public Offer Shares at an issue price of $1.00 per share. a) The total amount to be raised is between $15,000,000 and $20,000,000. b) The Shares issued under the Public Offer wi

  10. Slide 10: Corporate Overview

    Corporate Overview Estimated Free Float and Escrow Shares % at Offer Indicative Share Distribution under under Max Sub Completion Maximum Subscription Board and Management IPO Offer Investors Other Shareholders Escrowed Shares (existing shares) 73,401,885 73.42% Non-escrowed Shares (existing 6,568,1

  11. Slide 11: Proposed Use of Funds

    Proposed Use of Funds The funds raised from the Public Offer will be allocated Minimum Subscription1 Maximum Subscription1 towards exploration and development of the company's mineral sands projects, corporate development funding, Allocation of Funds Total Percentage Total Percentage general working

  12. Slide 12: Notes to the Proposed Use of Funds

    Notes to the Proposed Use of Funds 1. The proposed use of funds table is indicative only and may vary subject to the Corporations Act, the Listing Rules, other applicable laws and otherwise at the absolute discretion of the Company. 2. Refer to Section 8.8 of the Prospectus for a summary of expenses

  13. Slide 13: Board and Management

    Board and Management Experienced Board Senior Management Paul Qian Delwar H. Titu B. Sc (Chemistry) Executive Chair Managing Director B Com, MBA (Finance) Bangladesh Co • Over 12 years of experience in the mineral sands industry, covering all aspects from exploration to mining. • Brings over 28 year

  14. Slide 14: JORC Resources Summary – Gaibandha Mineral Sands Project

    JORC Resources Summary – Gaibandha Mineral Sands Project Indicated Mineral Resource summary* Infrastructure Vol to Zone 10m Tonnes Slimes Ilmenite Rutile Leucoxene Zircon Garne Magnetite TVHM • Wet Sand Processing Plant (including land depth (Mt) (%) (%) (%) (%) (%) t (%) (%) (%) (Mm3) based and flo

  15. Slide 15: Group Structure

    Group Structure Everlast Minerals Limited (Australia) Australia Board of Directors ListCo 99.99% 2 Pending 0.01% Mr. Delwar Titu Exploration Licences (4,000 ha each) Everlast Minerals Limited (Bangladesh) 3 Mining Leases Operating Co (2,395 ha each) Bangladesh Future Exploration Local Management and

  16. Slide 16: Gaibandha Mineral Sands Project

    02 Gaibandha Mineral Sands Project 16 IPO Presentation

  17. Slide 17: Exploration and Drilling Work

    Exploration and Drilling Work Trough Cross-stratification in Bar Top Sequence Rig Carrier Floating Stage Drilling at sand bars and river Field Geologists and staffers Sample Collection Dark Mineral Rich Band Click to Play . Samples (left) 17 IPO Presentation Drilling at sand bars and river

  18. Slide 18: Prime Location

    Darwin Prime Location The first company conducting river mineral sands exploration and mining in Bangladesh in the highly active and gigantic Brahmaputra-Jamuna River which originates from the high land areas of Himalaya • Bangladesh is located downstream of 3 large river basins, being the Ganges, B

  19. Slide 19: Gaibandha District of Bangladesh

    Darwin Gaibandha District of Bangladesh The Gaibandha Mineral Sands Project is located within the Brahmaputra-Jamuna river system in the local area of the Gaibandha District, which is • A district in Northern Bangladesh with an area of approx. 2,115km2 Brahmaputra-Jamuna • A total population of more

  20. Slide 20: Local Geology

    Darwin Local Geology The Brahmaputra-Jamuna River System Two active tectonic elements lay in The gradient of the river is high (1.63m/km) is one of the three major river systems of neighbouring areas: Dauki Fault along at its origin and sharply increases to 4.3- Bangladesh. It is a braided river sys

  21. Slide 21: Exploration Work Completed

    Darwin Exploration Work Completed Prior to the Company’s exploration activities, there had been no previous exploration undertaken at the Gaibandha Mineral Sands Project. However, a number of research-oriented investigations had been completed in the Jamuna River and identified at the presence of th

  22. Slide 22: Proposed Mining Plan

    Darwin Proposed Mining Plan EML’s Key Mining Criteria: • Focus on areas rich in mineral sands; • Distance from mine area to main wet plant; • Easily accessible areas by water ways; • Sedimentary column (up to 10 metres) is dominated by fine to medium grain sands; • Relatively new, low-lying and barr

  23. Slide 23: Mining Method

    Darwin Mining Method Bar sand mining The bars will be divided into a number of paddocks/ponds of 50m x 30m and be fenced by steel plate/wood piling for erosion protection. The open surface above the water table will be mined by using dry earth removing equipment. Below the water table, the wet sand

  24. Slide 24: Processing – Wet Plant and Dry Plant

    Darwin Processing – Wet Plant and Dry Plant Two separate types of processing plant may be used in the mineral sands mining, with these being a wet sand processing plant and a dry sand processing plant. The Company proposes two wet processing plants for the Dry Sand Plant is a permanent structure wit

  25. Slide 25: Final Product

    Darwin Final Product Heavy minerals will be transported from mine site to the dry plant using The Company is actively in talks with potential offtake barging and sand carrying ships will be used for the transportation. partners for the commercial grade mineral sands products. Domestic Transportation

  26. Slide 26: Rehabilitation

    Rehabilitation Goal of Rehabilitation: Return the disturbed land to a condition suitable for the agreed post- mining land users • The mining area of the Gaibandha Mineral Sands Project is submerged during the rainy season • Rehabilitation will be easier compared with most other mine sites • Sands co

  27. Slide 27: Processing Plant and Warehouse

    Processing Plant and Warehouse Wet and Dry Plant Site Wet and Dry Plant Site Process- Final ed Product Mineral for Sands shipping 27 IPO Presentation

  28. Slide 28: Industry Outlook

    03 Industry Outlook 28 IPO Presentation

  29. Slide 29: What are Mineral Sands

    What are Mineral Sands Mineral sands are heavy minerals concentrated in beach or river deposits. The industry mines and processes these sands, mainly for zircon and titanium dioxide products. Mineral sands deposits are typically found in ancient shorelines and come in two main types: alluvial (depos

  30. Slide 30: Mineral Sands Value Chain

    Mineral Sands Value Chain Bangladesh Minerals Suppliers Mineral Sands Mining Processing Market Australia, South Zircon (ZrSiO4) Africa, India, China, Standard Grade Titanium bearing mineral sands Brazil, Sierra Leon and USA Paintings Australia, India, Ilmenite Coatings Rutile (TiO2) Italy, Sri Lanka

  31. Slide 31: Industry Growth and Outlook

    Industry Growth and Outlook Strong Demand Demand for mineral sands is projected to grow locally internationally due to continued manufacturing, industry and other activities such as construction. Increase in Output Mineral sands output is anticipated to rise over the coming years, reflecting greater

  32. Slide 32: Bangladesh Mineral Sands Industry

    Bangladesh Mineral Sands Industry Very limited supply • Gained independence in 1971 locally; historically replies Limited mining history on imports. • Population: 171 million with median Mainly focuses on construction materials age of 27.1 years and small-scale coal and limestone extraction. • Land

  33. Slide 33: Future Growth

    04 Future Growth 33 IPO Presentation

  34. Slide 34: Investment Highlights Recap

    Investment Highlights Recap NEAR PRODUCTION GROWTH PRIME LOCATION INVESTMENT OPPORTUNITY • Large mineral sands project - effectively fully owned • Brahmaputra-Jamuna River carries huge volumes of and unencumbered sands every year which are deposited as sandbars and • 3 approved mining leases coverin

  35. Slide 35: Growth Strategy

    Growth Strategy The Company is committed to advancing the Gaibandha Mineral Sands Project towards full production. We plan to initiate mining and trial production in the initial term, followed by a transition to full commercial operations. Proposed Near Term Strategy Gaibandha Mineral Sands Project

  36. Slide 36: Future exploration plan

    Future exploration plan In addition to the Gaibandha Project, the Company has lodged two further exploration licences for the proposed Kurigram Mineral Sands Project and Pabna Mineral Sands Project for 4,000 ha each Kurigram Mineral Sands Project is located at the Brahmaputra Pabna Mineral Sands Pro

  37. Slide 37: Social Responsibility

    Social Responsibility Everlast Mineral is committed to operating in a manner that creates shared value for all our stakeholders and the local Gaibandha communities. The Company recognises the importance of responsible mining practices and is dedicated to fostering positive and enduring relationships

  38. Slide 38: Appendix

    05 Appendix 38 IPO Presentation

  39. Slide 39: Statutory and Pro-Forma Financials

    Statutory and Pro-Forma Financials Summary of the Pro Forma Historical Income Statement Statutory Historical Consolidated Statement of Financial Position and Pro FY22 FY23 HY23 HY24 Forma Historical Statement of Financial Position as at 31 December 2023 As at 31 December 2023 Company Min Sub Max Sub

  40. Slide 40: Extracted Independent Geologist Report as per JORC Code 2012

    Everlast Minerals Limited Extracted Independent Geologist Report as per JORC Code 2012 Everlast Minerals Limited Report Date: 29 August 2024 40 IPO Presentation

  41. Slide 41: Glossary

    Glossary Term Definition ASEAN The Association of Southeast Asian Nations ASX Australian Securities Exchange BUET Bangladesh University of Engineering and Technology CCEC China Capital Energy Co., Ltd. EML Everlast Minerals Ltd GDP Gross Domestic Product Ha Hectare JORC The Australasian Code for Rep

  42. Slide 42: Contact

    Contact Paul Qian – Executive Chair Everlast Minerals Ltd E: paulq@everlastminerals.com M: 0450 133 777 Sky Zhang – Business Development Manager Everlast Minerals Ltd E: skyzhang@everlastminerals.com M: 0426 458 888 Eric Sun – Director Byrons Corporate Finance E: erics@byrons.com.au M: 0413 255 516