Everlast Minerals Ltd · ASX:EV8

Everlast Minerals — Investor Presentation (September 2025)

17 slides from Everlast Minerals's investor presentation, September 2025

  1. Slide 1: Everlast Minerals Ltd (ASX: EV8)

    Everlast Minerals Ltd (ASX: EV8) The first company advancing river-focused mineral sands exploration and mining in Bangladesh Investor presentation – September 2025 1

  2. Slide 2: Important Notice and Disclaimer

    Important Notice and Disclaimer Disclaimer for Investor Presentation - The following disclaimer applies to this Investor Presentation Past performance - Past performance information given in this Presentation is given for illustrative purposes only and (Presentation). You should read this disclaimer

  3. Slide 3: Everlast Minerals is focused on exploration and near-term production of mineral sands in Bangladesh

    Everlast Minerals Ltd (ASX: EV8) is focused on exploration and near-term production of mineral sands projects in Bangladesh 3 approved mining licences covering 2,395Ha with 2 exploration Bramaputra-Jamuna river moves high volume of sands every year licences pending at 4,000Ha each - all near infrast

  4. Slide 4: Corporate overview

    Corporate overview Shares on issue 130,615,004 Price per share (as at 4pm (AEST) on 9 October 2025) $0.34 Market capitalisation ≈$44.4m Cash at bank (as at 30 Sep 2025) ≈$5.5m Debt Nil Board & Management Mr Paul Qian – Executive Chair Mr George Edwards – Non-Executive Director Mr Greg Starr – Non-Ex

  5. Slide 5: The mineral sands opportunity

    The mineral sands opportunity EV8 is well placed to capitalise on favourable industry tailwinds by becoming Bangladesh's leading mineral sands miner Strong demand projected both locally and internationally due to increased manufacturing, industry and construction requirements Increased output antici

  6. Slide 6: Flagship Gaibandha Mineral Sands Project

    Flagship Gaibandha Mineral Sands Project The first company to advance river mineral sands exploration and mining in Bangladesh  Project totals 2,935Ha and has 3 granted Mining Licences  Located within the Brahmaputra-Jamuna river – Bangladesh's second largest basin  Brahmaputra River Basin caries

  7. Slide 7: Exploration activities completed at Gaibandha Mineral Sands Project

    Exploration activities completed at Gaibandha Mineral Sands Project In-depth research, channel sampling and drilling undertaken to date highlights project potential Phase 1: Channel Sampling* Phase 2: Exploration & Drilling*  Commencement followed extensive  Exploration area divided to 400m by ana

  8. Slide 8: Established mine plan

    Established mine plan Proposed mining plan determined from exploration to date and ongoing consultation with leading geologists Key mining criteria  Focus on areas rich in mineral sands  Little distance from mine area to main wet plant  Easily accessible areas via waterways  Sedimentary column (

  9. Slide 9: Utilising a proven mining method

    Utilising a proven mining method Simple, three step process to unlock value from existing sand bars and river beds Bar sand mining:  Bars divided into 50m x 30m paddocks/ponds, fenced for erosion protection  Dry sand mined with earthmoving equipment; wet sand below water table extracted using slur

  10. Slide 10: Processing: Wet and Dry plants

    Processing: Wet and Dry plants Multiple processing opportunities to scale production opportunities Wet plant operations (land and floating) Dry plant Plans in place for a land based plant ~1km from mining area and 5 floating Dry sand plant is a permanent structure with two processing circuits plants

  11. Slide 11: Existing operations: plant and warehouse

    Existing operations: plant and warehouse Wet and Dry Plant Site Wet and Dry Plant Site Processed Trial Mineral Sample Sands Product 11

  12. Slide 12: Near term domestic and international shipping opportunities

    Near term domestic and international shipping opportunities Heavy minerals will be transported from mine site to dry plat via barges then shipped to customers Domestic logistics:  Mine site to plant: Barges and sand carrying ships Pending offtake opportunities: *  Separated minerals from storage:

  13. Slide 13: Additional exploration opportunities

    Additional exploration opportunities Two additional exploration licences pending including the Kurigram Mineral Sands Project and Pabna Mineral Sands Project – each EL would add 4,000 of prospective exploration area* Kurigram Mineral Sands Project located on the Brahmaputra River, northern Pabna Min

  14. Slide 14: Near term milestones

    Near term milestones A defined strategy to unlock considerable value for shareholders with multiple operational milestones pending Milestone Timeframe / Status Completion of successful and oversubscribed IPO and ASX listing Completed in Q4 CY25 Completion of works program planning at the Gaibandha P

  15. Slide 15: Contact

    Contact Henry Jordan Six Degrees Investor Relations E: Henry.Jordan@sdir.com.au P: 0431 271 538 15

  16. Slide 16: Appendix 1: Rehabilitation

    Appendix 1: Rehabilitation Plans in place to undertake land rehabilitation by leveraging wet season EV8 has a distinct rehabilitation strategy:  Gaibandha Mineral Sands project is submerged during the rainy season – allowing for easier rehabilitation  Sands collected from land area will be transfe

  17. Slide 17: Appendix 2: Social responsibility

    Appendix 2: Social responsibility Committed to local communities, alongside all shareholders and key stakeholders EV8 recognises the importance of responsible mining practices and is dedicated to fostering positive and enduring relationships with the local Bangladeshi communities. Since 2020, the Co