  1. Slide 1: A compelling platinum story

    Slide 1: A compelling platinum story

    A compelling platinum story Citi Global Resources Conference Mayfair, London 7-8 March 2012 www.bafokengplatinum.co.za

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer The information presented in this presentation is of a general nature and the forward looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im

  3. Slide 3: About RBPlat

    Slide 3: About RBPlat

    About RBPlat www.bafokengplatinum.co.za 2

  4. Slide 4: About Royal Bafokeng Platinum (RBPlat)

    Slide 4: About Royal Bafokeng Platinum (RBPlat)

    About Royal Bafokeng Platinum (RBPlat) • Black-owned and controlled, mid-tier PGMs producer • Assets located on Western Limb of Bushveld Complex, South Africa • 67% interest in Bafokeng Rasimone Platinum Mine (BRPM), unincorporated JV with Anglo American Platinum • BRPM (operating since 1998), Styld

  5. Slide 5: Prime location on the Western Limb

    Slide 5: Prime location on the Western Limb

    Prime location on the Western Limb www.bafokengplatinum.co.za 4

  6. Slide 6: A long and proud history

    Slide 6: A long and proud history

    A long and proud history Royal Bafokeng Discussions between Merensky opencast BRPM JV restructuring; JSE listing completed Nation purchases RBN and AngloPlat to commences RBPlat obtains 67% interest land form JV 1860s 1925 1990s 1997 1998 2002 Dec 2009 Jan 2010 Nov 2010 2011 Platinum discovered in S

  7. Slide 7: Ownership structure

    Slide 7: Ownership structure

    Ownership structure Royal Bafokeng Holdings (RBH) Anglo American Platinum Public Investors 100% 100% Royal Bafokeng Platinum Holdings Rustenburg Platinum Mines 30.25% 57.13% 12.62% 33% 100% Royal Bafokeng Resources 67% Bafokeng Rasimone Platinum Mine Project expansion Operations Styldrift I BRPM Min

  8. Slide 8: Our strategy

    Slide 8: Our strategy

    Our strategy • Achieve operational excellence at BRPM (optimising volumes and reducing costs) • Grow organically through Styldrift • Bring Styldrift II forward as an expansion project • Build flexibility in the business with co-extraction • Pursue value-enhancing acquisitions and synergies www.bafok

  9. Slide 9: Our business

    Slide 9: Our business

    Our business www.bafokengplatinum.co.za 8

  10. Slide 10: Well-established shallow Merensky producer on Western Limb, well-developed infrastructure

    Slide 10: Well-established shallow Merensky producer on Western Limb, well-developed infrastructure

    Well-established shallow Merensky producer on Western Limb, well-developed infrastructure • 13 years of operation • well-understood, defined geology • sophisticated 3D seismic exploration • Shallow depth • BRPM: twin decline shaft complex at 500m • Styldrift I project: new twin vertical shaft system

  11. Slide 11: Focus on Merensky with significant quality UG2

    Slide 11: Focus on Merensky with significant quality UG2

    Focus on Merensky with significant quality UG2 • Merensky production growth at Styldrift I from 2017 • UG2 to gradually replace Merensky production from 2014 at BRPM South shaft, and from 2025 at North shaft • UG2 mining at Styldrift expected after 2040 with possible early co-extraction Total produc

  12. Slide 12: Attractive margins with scope for cost reduction

    Slide 12: Attractive margins with scope for cost reduction

    Attractive margins with scope for cost reduction • High grade, attractive prill split • significant base metal revenue contribution (nickel 9.3% in 2011) • Improvement opportunities • continued optimisation of production volumes • cost optimisation through expenditure review and analysis • leveragin

  13. Slide 13: Poised to grow organically and through consolidation

    Slide 13: Poised to grow organically and through consolidation

    Poised to grow organically and through consolidation • High-grade resource base with significant organic growth potential • Supportive, well capitalised shareholders • Leading internal growth projects on last remaining shallow Merensky reef • increase in production planned with Styldrift I project (

  14. Slide 14: Poised to grow organically and through consolidation

    Slide 14: Poised to grow organically and through consolidation

    Poised to grow organically and through consolidation Value-enhancing transactions with Impala • Key commercial terms agreed on: • 7-year mining arrangement (concluded in 2010) with Impala via Impala’s #6 & 8 shafts • resource of 780,000oz (4E) of UG2 Wesizwe Project 2 • 30-year mining arrangement (c

  15. Slide 15: Our operations

    Slide 15: Our operations

    Our operations www.bafokengplatinum.co.za 14

  16. Slide 16: BRPM: geology, layout and access

    Slide 16: BRPM: geology, layout and access

    BRPM: geology, layout and access Layout Shaft layout Vent shaft (surface to level 9) Chairlift decline Belt decline Material decline Level 9 Vertical dams Level 10 Source: Company Orebody access North Shaft South Shaft Sample prep Ore conveyed to plant Belt riding www.bafokengplatinum.co.za 15

  17. Slide 17: Well-developed infrastructure

    Slide 17: Well-developed infrastructure

    Well-developed infrastructure North Shaft South Shaft Concentrator Plant ISA Mill ISA mill position CCO www.bafokengplatinum.co.za 16

  18. Slide 18: Resource optimisation strategy and exploration

    Slide 18: Resource optimisation strategy and exploration

    Resource optimisation strategy and exploration • Geology 3D seismic survey • well-understood, high-quality orebody • 2011 exploration: • 65 drillholes, 70,000m • 237 reef intersections • 2012 exploration: • 40 drillholes, 45,000m • aeromagnetic and 3D seismic surveys Exploration drilling Aeromagneti

  19. Slide 19: Resources

    Slide 19: Resources

    Resources 100% Inclusive Resource RBPlat 67% Description Mt 4E g/t 4eMoz Mt 4E g/t 4eMoz BRPM Merensky Measured 14.92 7.63 3.66 10.00 7.63 2.45 Indicated 8.26 7.27 1.93 5.53 7.27 1.29 Inferred 7.64 8.12 1.99 5.12 8.12 1.34 Merensky Total 30.82 7.66 7.59 20.65 7.66 5.08 UG2 Measured 41.44 5.40 7.20 2

  20. Slide 20: Reserves

    Slide 20: Reserves

    Reserves 100% Reserve RBPlat 67% Description Mt 4E g/t 4eMoz Mt 4E g/t 4eMoz BRPM Merensky Proven 15.30 4.49 2.21 10.25 4.49 1.48 Probable 7.38 4.42 1.05 4.95 4.42 0.7 Merensky Total 22.68 4.47 3.26 15.50 4.47 2.18 UG2 Proven 39.57 3.93 5.00 26.51 3.93 3.35 Probable 15.54 3.74 1.87 10.41 3.74 1.25 U

  21. Slide 21: Production

    Slide 21: Production

    Production • Smooth operational handover from BRPM recovery (4E) % 89.0 4 January 2010 86.3 86.5 87.8 87.0 86.1 • Operational strategy aimed at optimising 85.0 84.1 throughput and revenue 83.0 % • expand UG2 production 81.0 79.0 • increase stopable reserves 77.0 • upgrading of BRPM concentrator 75.0

  22. Slide 22: Operating costs

    Slide 22: Operating costs

    Operating costs Description Unit 2011 2010 Operating labour Employees 7,942 7,670 On-mine cash cost/tonne milled R/t 782 707 On-mine cash cost/4E oz delivered R/oz (4E) 6,399 5,901 On-mine cash cost/Pt oz delivered R/oz (Pt) 9,863 9,076 www.bafokengplatinum.co.za 21

  23. Slide 23: Progress at Styldrift

    Slide 23: Progress at Styldrift

    Progress at Styldrift www.bafokengplatinum.co.za 22

  24. Slide 24: Styldrift I Project

    Slide 24: Styldrift I Project

    Styldrift I Project Capital budget – nominal Capital cash flow – nominal R millions Description Unit Mining Concentrator Total 3 000 2 500 Authorised & Rm 6,289 1,422 7,711 contingency 2 000 1 500 Escalation Rm 3,153 938 4,091 1 000 Total nominal Rm 9,442 2,360 11,802 500 Latest cost forecast Rm 9,1

  25. Slide 25: Styldrift I Project, continued

    Slide 25: Styldrift I Project, continued

    Styldrift I Project, continued Project timetable • Progress (February 2012) • planned % complete: 25.4% • actual % complete: 25.8% www.bafokengplatinum.co.za 24

  26. Slide 26: Styldrift I Project, continued

    Slide 26: Styldrift I Project, continued

    Styldrift I Project, continued • Legal and Permitting: • Mining Right — granted in March 2008 • EMP — approved in March 2008 • Water User Licence — approved in April 2010 • Legal Appointments — all in place • Social and Labour Plan — approved in September 2009 www.bafokengplatinum.co.za 25

  27. Slide 27: Styldrift I Project, continued

    Slide 27: Styldrift I Project, continued

    Styldrift I Project, continued Production profile kt Styldrift I production 3 000 2 500 2 000 1 500 1 000 500 - 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Styldrift I Merensky www.bafokengplatinum.co.za 26

  28. Slide 28: Further organic growth in Styldrift II

    Slide 28: Further organic growth in Styldrift II

    Further organic growth in Styldrift II • Styldrift II project area • resource area ± 23 million m2 • depth 900m — 1,400m, average dip 90 • average Merensky/UG2 middling 35m • Potential size of investment similar to Styldrift I • Opportunity will be evaluated through: • study consisting of a concept,

  29. Slide 29: Financial performance

    Slide 29: Financial performance

    Financial performance www.bafokengplatinum.co.za 28

  30. Slide 30: Key features for year ended December 2011

    Slide 30: Key features for year ended December 2011

    Key features for year ended 31 December 2011 • Fatality-free year • Conclusion of landmark three-year wage agreement • Production of 281,598 PGMs (4E oz) despite challenging environment • BRPM concentrator recoveries improve by 1.5% to 87.83% • BRPM revenue up by 2% to R2.97 billion • Cash operating

  31. Slide 31: Key financial performance indicators

    Slide 31: Key financial performance indicators

    Key financial performance indicators* 2011 2010 Average basket price (R/Pt oz) 16,282 15,555 Revenue (Rm) 2,975 2,107 Cost of sales (Rm) 2,409 1,608 Gross profit (Rm) 566 499 Operating profit (Rm) 517 440 EBITDA (Rm) 1,036 815 Net profit after tax (Rm) 411 3,166 Headline earnings (Rm) 274 270 HEPS (

  32. Slide 32: Key financial performance indicators

    Slide 32: Key financial performance indicators

    Key financial performance indicators 2011 2010 Cash generated by operations (Rm) 1,025 785 Cash, net of debt (incl. pref share investment) (Rm) 1,364 1,150 Capex (Rm) 1,164 976 Gross profit margin (%) 19 24 EBITDA margin (%) 35 39 NAV (Rand per share) 69 67 www.bafokengplatinum.co.za 31

  33. Slide 33: Sales volumes by metal and average prices achieved

    Slide 33: Sales volumes by metal and average prices achieved

    Sales volumes by metal and average prices achieved 2011 Average price Metals contribution to 2011 revenue Sales achieved* volumes ($) Cu 2.3 Co 0.4 Platinum (oz) 182,712 1,697/oz Ni 9.3 Ru 0.7 Palladium (oz) 74,820 720/oz Ir 1.1 Rh 5.4 Gold (oz) 9,806 1,716/oz Au 3.6 Rhodium (oz) 14,260 1,789/oz Iri

  34. Slide 34: Breakdown of cost of sales

    Slide 34: Breakdown of cost of sales

    Breakdown of cost of sales* Breakdown of 2011 COS (%) 2011 2010 3% R million Labour 674 490 36% 33% Utilities 145 88 Contractor costs 377 264 Materials and other mining 583 402 costs 8% Other 80 (10) 20% Cost of sales (excluding Labour depreciation and 1,891 1,234 Utilities amortisation) Contractors

  35. Slide 35: Our investment case

    Slide 35: Our investment case

    Our investment case www.bafokengplatinum.co.za 34

  36. Slide 36: A compelling story

    Slide 36: A compelling story

    A compelling story • Compelling sector with strong demand and supply fundamentals • Well-established, shallow Western Limb Merensky producer with well-developed infrastructure • Attractive margin operations with scope for cost reduction • Experienced management team with clear focus and operating fl

  37. Slide 37: Contact details

    Slide 37: Contact details

    Contact details Lindiwe Montshiwagae Investor Relations Manager Royal Bafokeng Platinum The Pivot, No 1 Monte Casino Boulevard, Block C, Floor 4, Fourways, 2021 Tel: +27 (0) 10 590 4517 Fax: +27 (0) 86 219 5131 Mobile: +27 (0) 82 920 7803 Email: lindiwe@bafokengplatinum.co.za www.bafokengplatinum.co