Royal Bafokeng Platinum — Citi Global Resources Conference 2012
37 slides from Royal Bafokeng Platinum's conference presentation, Mar 7, 2012

Slide 1: A compelling platinum story
A compelling platinum story Citi Global Resources Conference Mayfair, London 7-8 March 2012 www.bafokengplatinum.co.za

Slide 2: Disclaimer
Disclaimer The information presented in this presentation is of a general nature and the forward looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im

Slide 3: About RBPlat
About RBPlat www.bafokengplatinum.co.za 2

Slide 4: About Royal Bafokeng Platinum (RBPlat)
About Royal Bafokeng Platinum (RBPlat) • Black-owned and controlled, mid-tier PGMs producer • Assets located on Western Limb of Bushveld Complex, South Africa • 67% interest in Bafokeng Rasimone Platinum Mine (BRPM), unincorporated JV with Anglo American Platinum • BRPM (operating since 1998), Styld

Slide 5: Prime location on the Western Limb
Prime location on the Western Limb www.bafokengplatinum.co.za 4

Slide 6: A long and proud history
A long and proud history Royal Bafokeng Discussions between Merensky opencast BRPM JV restructuring; JSE listing completed Nation purchases RBN and AngloPlat to commences RBPlat obtains 67% interest land form JV 1860s 1925 1990s 1997 1998 2002 Dec 2009 Jan 2010 Nov 2010 2011 Platinum discovered in S

Slide 7: Ownership structure
Ownership structure Royal Bafokeng Holdings (RBH) Anglo American Platinum Public Investors 100% 100% Royal Bafokeng Platinum Holdings Rustenburg Platinum Mines 30.25% 57.13% 12.62% 33% 100% Royal Bafokeng Resources 67% Bafokeng Rasimone Platinum Mine Project expansion Operations Styldrift I BRPM Min

Slide 8: Our strategy
Our strategy • Achieve operational excellence at BRPM (optimising volumes and reducing costs) • Grow organically through Styldrift • Bring Styldrift II forward as an expansion project • Build flexibility in the business with co-extraction • Pursue value-enhancing acquisitions and synergies www.bafok

Slide 9: Our business
Our business www.bafokengplatinum.co.za 8

Slide 10: Well-established shallow Merensky producer on Western Limb, well-developed infrastructure
Well-established shallow Merensky producer on Western Limb, well-developed infrastructure • 13 years of operation • well-understood, defined geology • sophisticated 3D seismic exploration • Shallow depth • BRPM: twin decline shaft complex at 500m • Styldrift I project: new twin vertical shaft system

Slide 11: Focus on Merensky with significant quality UG2
Focus on Merensky with significant quality UG2 • Merensky production growth at Styldrift I from 2017 • UG2 to gradually replace Merensky production from 2014 at BRPM South shaft, and from 2025 at North shaft • UG2 mining at Styldrift expected after 2040 with possible early co-extraction Total produc

Slide 12: Attractive margins with scope for cost reduction
Attractive margins with scope for cost reduction • High grade, attractive prill split • significant base metal revenue contribution (nickel 9.3% in 2011) • Improvement opportunities • continued optimisation of production volumes • cost optimisation through expenditure review and analysis • leveragin

Slide 13: Poised to grow organically and through consolidation
Poised to grow organically and through consolidation • High-grade resource base with significant organic growth potential • Supportive, well capitalised shareholders • Leading internal growth projects on last remaining shallow Merensky reef • increase in production planned with Styldrift I project (

Slide 14: Poised to grow organically and through consolidation
Poised to grow organically and through consolidation Value-enhancing transactions with Impala • Key commercial terms agreed on: • 7-year mining arrangement (concluded in 2010) with Impala via Impala’s #6 & 8 shafts • resource of 780,000oz (4E) of UG2 Wesizwe Project 2 • 30-year mining arrangement (c

Slide 15: Our operations
Our operations www.bafokengplatinum.co.za 14

Slide 16: BRPM: geology, layout and access
BRPM: geology, layout and access Layout Shaft layout Vent shaft (surface to level 9) Chairlift decline Belt decline Material decline Level 9 Vertical dams Level 10 Source: Company Orebody access North Shaft South Shaft Sample prep Ore conveyed to plant Belt riding www.bafokengplatinum.co.za 15

Slide 17: Well-developed infrastructure
Well-developed infrastructure North Shaft South Shaft Concentrator Plant ISA Mill ISA mill position CCO www.bafokengplatinum.co.za 16

Slide 18: Resource optimisation strategy and exploration
Resource optimisation strategy and exploration • Geology 3D seismic survey • well-understood, high-quality orebody • 2011 exploration: • 65 drillholes, 70,000m • 237 reef intersections • 2012 exploration: • 40 drillholes, 45,000m • aeromagnetic and 3D seismic surveys Exploration drilling Aeromagneti

Slide 19: Resources
Resources 100% Inclusive Resource RBPlat 67% Description Mt 4E g/t 4eMoz Mt 4E g/t 4eMoz BRPM Merensky Measured 14.92 7.63 3.66 10.00 7.63 2.45 Indicated 8.26 7.27 1.93 5.53 7.27 1.29 Inferred 7.64 8.12 1.99 5.12 8.12 1.34 Merensky Total 30.82 7.66 7.59 20.65 7.66 5.08 UG2 Measured 41.44 5.40 7.20 2

Slide 20: Reserves
Reserves 100% Reserve RBPlat 67% Description Mt 4E g/t 4eMoz Mt 4E g/t 4eMoz BRPM Merensky Proven 15.30 4.49 2.21 10.25 4.49 1.48 Probable 7.38 4.42 1.05 4.95 4.42 0.7 Merensky Total 22.68 4.47 3.26 15.50 4.47 2.18 UG2 Proven 39.57 3.93 5.00 26.51 3.93 3.35 Probable 15.54 3.74 1.87 10.41 3.74 1.25 U

Slide 21: Production
Production • Smooth operational handover from BRPM recovery (4E) % 89.0 4 January 2010 86.3 86.5 87.8 87.0 86.1 • Operational strategy aimed at optimising 85.0 84.1 throughput and revenue 83.0 % • expand UG2 production 81.0 79.0 • increase stopable reserves 77.0 • upgrading of BRPM concentrator 75.0

Slide 22: Operating costs
Operating costs Description Unit 2011 2010 Operating labour Employees 7,942 7,670 On-mine cash cost/tonne milled R/t 782 707 On-mine cash cost/4E oz delivered R/oz (4E) 6,399 5,901 On-mine cash cost/Pt oz delivered R/oz (Pt) 9,863 9,076 www.bafokengplatinum.co.za 21

Slide 23: Progress at Styldrift
Progress at Styldrift www.bafokengplatinum.co.za 22

Slide 24: Styldrift I Project
Styldrift I Project Capital budget – nominal Capital cash flow – nominal R millions Description Unit Mining Concentrator Total 3 000 2 500 Authorised & Rm 6,289 1,422 7,711 contingency 2 000 1 500 Escalation Rm 3,153 938 4,091 1 000 Total nominal Rm 9,442 2,360 11,802 500 Latest cost forecast Rm 9,1

Slide 25: Styldrift I Project, continued
Styldrift I Project, continued Project timetable • Progress (February 2012) • planned % complete: 25.4% • actual % complete: 25.8% www.bafokengplatinum.co.za 24

Slide 26: Styldrift I Project, continued
Styldrift I Project, continued • Legal and Permitting: • Mining Right — granted in March 2008 • EMP — approved in March 2008 • Water User Licence — approved in April 2010 • Legal Appointments — all in place • Social and Labour Plan — approved in September 2009 www.bafokengplatinum.co.za 25

Slide 27: Styldrift I Project, continued
Styldrift I Project, continued Production profile kt Styldrift I production 3 000 2 500 2 000 1 500 1 000 500 - 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Styldrift I Merensky www.bafokengplatinum.co.za 26

Slide 28: Further organic growth in Styldrift II
Further organic growth in Styldrift II • Styldrift II project area • resource area ± 23 million m2 • depth 900m — 1,400m, average dip 90 • average Merensky/UG2 middling 35m • Potential size of investment similar to Styldrift I • Opportunity will be evaluated through: • study consisting of a concept,

Slide 29: Financial performance
Financial performance www.bafokengplatinum.co.za 28

Slide 30: Key features for year ended December 2011
Key features for year ended 31 December 2011 • Fatality-free year • Conclusion of landmark three-year wage agreement • Production of 281,598 PGMs (4E oz) despite challenging environment • BRPM concentrator recoveries improve by 1.5% to 87.83% • BRPM revenue up by 2% to R2.97 billion • Cash operating

Slide 31: Key financial performance indicators
Key financial performance indicators* 2011 2010 Average basket price (R/Pt oz) 16,282 15,555 Revenue (Rm) 2,975 2,107 Cost of sales (Rm) 2,409 1,608 Gross profit (Rm) 566 499 Operating profit (Rm) 517 440 EBITDA (Rm) 1,036 815 Net profit after tax (Rm) 411 3,166 Headline earnings (Rm) 274 270 HEPS (

Slide 32: Key financial performance indicators
Key financial performance indicators 2011 2010 Cash generated by operations (Rm) 1,025 785 Cash, net of debt (incl. pref share investment) (Rm) 1,364 1,150 Capex (Rm) 1,164 976 Gross profit margin (%) 19 24 EBITDA margin (%) 35 39 NAV (Rand per share) 69 67 www.bafokengplatinum.co.za 31

Slide 33: Sales volumes by metal and average prices achieved
Sales volumes by metal and average prices achieved 2011 Average price Metals contribution to 2011 revenue Sales achieved* volumes ($) Cu 2.3 Co 0.4 Platinum (oz) 182,712 1,697/oz Ni 9.3 Ru 0.7 Palladium (oz) 74,820 720/oz Ir 1.1 Rh 5.4 Gold (oz) 9,806 1,716/oz Au 3.6 Rhodium (oz) 14,260 1,789/oz Iri

Slide 34: Breakdown of cost of sales
Breakdown of cost of sales* Breakdown of 2011 COS (%) 2011 2010 3% R million Labour 674 490 36% 33% Utilities 145 88 Contractor costs 377 264 Materials and other mining 583 402 costs 8% Other 80 (10) 20% Cost of sales (excluding Labour depreciation and 1,891 1,234 Utilities amortisation) Contractors

Slide 35: Our investment case
Our investment case www.bafokengplatinum.co.za 34

Slide 36: A compelling story
A compelling story • Compelling sector with strong demand and supply fundamentals • Well-established, shallow Western Limb Merensky producer with well-developed infrastructure • Attractive margin operations with scope for cost reduction • Experienced management team with clear focus and operating fl

Slide 37: Contact details
Contact details Lindiwe Montshiwagae Investor Relations Manager Royal Bafokeng Platinum The Pivot, No 1 Monte Casino Boulevard, Block C, Floor 4, Fourways, 2021 Tel: +27 (0) 10 590 4517 Fax: +27 (0) 86 219 5131 Mobile: +27 (0) 82 920 7803 Email: lindiwe@bafokengplatinum.co.za www.bafokengplatinum.co
Source: company website
More decks from Royal Bafokeng Platinum Ltd
Renaissance Capital Metals & Mining Conference 202118 slides · May 2021
H1 2020 Earnings Presentation39 slides · 2020
Merger or Acquisition (October 2019)11 slides · Oct 16, 2019
RBPlat Analyst Roundtable 201910 slides · Aug 6, 2019
Technical Presentation (February 2019)34 slides · Feb 1, 2019
Fact Sheet (2019)11 slides · 2019