Oceanic Iron Ore Corp. · TSXV:FEO

Oceanic Iron Ore — Investor Presentation (August 2016)

48 slides from Oceanic Iron Ore's investor presentation, Aug 25, 2016

  1. Slide 1: Investor Presentation

    Slide 1: Investor Presentation

    fn OCEANIC (RON -ORE CORP WWW.OCEANICIRONORE.COM TSX:V - FEO Investor Presentation

  2. Slide 2: Cautionary Notes

    Slide 2: Cautionary Notes

    Cautionary Notes This presentation includes certain "Forward-Looking Statements” as that term is used in applicable securities law. All statements included herein, other than statements of historical fact, including, without limitation, statements regarding potential mineralization and resources, ex

  3. Slide 3: Corporate Overview

    Slide 3: Corporate Overview

    Corporate Overview Capitalization Summary (August 24, 2016) Shares in Issue 42,308,124 Warrants ($0.30 - $10.00) 15,536,250 Options ($0.15 - $0.20) 3,830,950 Convertible Debenture ($0.43) 4,710,067 Restricted Share Units 2,596,355 Fully Diluted 68,981,746 Listings FEO (TSX-V) 3

  4. Slide 4: Company Overview

    Slide 4: Company Overview

    Company Overview • Iron ore development in the Labrador Trough (Québec) • Led by a highly experienced management team that has managed, operated developed and/or sold over $20 bn in assets • 100% owned Ungava Bay projects - Hopes Advance, Morgan Lake, Roberts Lake • Largest single concession holder

  5. Slide 5: Hopes Advance Project - A World Class Premium Product Iron Ore Project

    Slide 5: Hopes Advance Project - A World Class Premium Product Iron Ore Project

    HOPES ADVANCE PROJECT - A World Class Premium Product Iron Ore Project • World Class Iron Ore Reserves • Lowest Quartile Costs • Best in Class Management • Superior Quality Product • Stands Up in All Price Cycles Hopes Advance 66.5% Fe Pellets Iron Ore Carrier 5

  6. Slide 6: Hopes Advance – The Premier High Quality, Low Cost Iron Ore Project in North America

    Slide 6: Hopes Advance – The Premier High Quality, Low Cost Iron Ore Project in North America

    Hopes Advance – The Premier High Quality, Low Cost Iron Ore Project in North America Robust Pre- • Base case pre-tax NPV of $5.6bn and unlevered IRR of 20.5% Feasibility Study* • Life of mine operating cost $30/tonne, potential to become one of the world’s Economics lowest operating cost iron ore pr

  7. Slide 7: Hopes Advance Pre-Feasibility Highlights

    Slide 7: Hopes Advance Pre-Feasibility Highlights

    Hopes Advance Pre-Feasibility Highlights (September 2012) Variable PFS Highlights • Phase 1 production of 10 FOB Price $100/tonne million tpa to year 10 CAD:USD $1.00 • Expansion to 20 million tpa production thereafter LOM operating cost $30.18/tonne Pre-tax NPV (8%) $5.6bn • Expected mine life of 3

  8. Slide 8: Significant Progress to Date

    Slide 8: Significant Progress to Date

    Significant Progress to Date • Technical • Pilot plant testwork and flowsheet development • Pre-Feasibility Study in respect of Hopes Advance completed • Proven and probable mineral reserves* established • Project Optimization • Product Value in Use Marketing Study • Product Optimization Study • Shi

  9. Slide 9: 2016 – Breakthrough Framework Agreement with Power China International

    Slide 9: 2016 – Breakthrough Framework Agreement with Power China International

    2016 – Breakthrough Framework Agreement with Power China International • Power China is a large Chinese State Owned Enterprise with the skills, knowledge, and experience to execute on the project’s EPC requirements • Power China’s interest is developing business in North America • The company has US

  10. Slide 10: Current Global Sources Are Creating Demand For Higher Quality Supply

    Slide 10: Current Global Sources Are Creating Demand For Higher Quality Supply

    Current Global Sources Are Creating Demand For Higher Quality Supply • Quality of major supply sources has declined and the decline continues • Japanese market has focused on high quality flat carbon and stainless steel products to meet consumer demand. All Japanese steel producers currently cite qu

  11. Slide 11: Next Steps

    Slide 11: Next Steps

    Next Steps Development Activity Target Completion Date Strategic Partnering & Financing 2016 Completion of Environmental Impact Study 2016 Negotiate impact benefits agreement with local 2016 / 2017 stakeholders Feasibility Study 2016 / 2017 Project Construction 2018 - 20 Production 2020 - 2051+ 11

  12. Slide 12: Hopes Advance Mineral Reserve

    Slide 12: Hopes Advance Mineral Reserve

    Hopes Advance Mineral Reserve MINERAL RESERVES (25% Fe cut-off) Category Tonnes Total Fe (%) Weight Recovery (%) Proven Reserves 763,276,000 32.3% 37.4% Probable Reserves 595,990,000 32.1% 37.1% Proven and Probable 1,359,266,000 32.2% 37.3% Reserves Disclosure: • Open pit reserves are based on a 25%

  13. Slide 13: Hopes Advance Images

    Slide 13: Hopes Advance Images

    Hopes Advance Images Castle Mountain Zone 2 Camp Drill Core 13

  14. Slide 14: Hopes Advance Metallurgy

    Slide 14: Hopes Advance Metallurgy

    Hopes Advance Metallurgy • 600 samples across all deposits at Hopes Advance Bench – Scale • Demonstrated high weight recoveries with high percentage of Testwork iron recovery from gravity process April 2012 • Simple process flow sheet with high grade 66.5% concentrate • Very low levels of deleteriou

  15. Slide 15: Hopes Advance Flowsheet – Simple Metallurgy

    Slide 15: Hopes Advance Flowsheet – Simple Metallurgy

    Hopes Advance Flowsheet – Simple Metallurgy Primary Grinding • High weight and Fe %Fe 34.2% recoveries using a simple %SiO2 42.1% flowsheet Wt% 100% Gyratory Crusher Primary Grinding Grind 300um Spiral Tails Cobber LIMS Con Final Tails %Fe 19.7% %Fe 40.0% %SiO2 59.2% %SiO2 40.8% Wt% 68.5% Wt% 13.5%

  16. Slide 16: Excellent Product Chemistry

    Slide 16: Excellent Product Chemistry

    Excellent Product Chemistry Major Elements (%)* Fe SiO2 Mg0 Ca0 AI203 Na K 66.6% 4.5% 0.1% 0.4% <0.01% <0.01% <0.01% Mn Ti Cr V P S 0.22% <0.01% <0.01% <0.01% <0.01% 0.03% • Combined concentrate includes 64% hematite and 30% magnetite • Ratio of hematite to magnetite is 2.1 : 1 * Analysis for Castle

  17. Slide 17: High Quality Product

    Slide 17: High Quality Product

    High Quality Product Alumina - %AIO2O3 Phosphorus - %P Source: Alderon Iron Ore, Sept 2012 Source: Alderon Iron Ore, Sept 2012 • High quality product with amongst the lowest alumina and phos content • Positive impact on blast furnace performance and overall operating and capital costs 17

  18. Slide 18: Hopes Advance Site Layout

    Slide 18: Hopes Advance Site Layout

    Hopes Advance Site Layout • No rail requirement Power Generation Ungava Bay Tailings Facility Port Pointe Iron Breakwater Valley Hopes Advance Bay F E D C Concentrator, Aupaluk Truck Shop, & Bay Zone Camp McDonald Oceanic Iron Ore Claims Restricted Land West Zone Pipeline & Access Road Pit Designs A

  19. Slide 19: Port & Shipping Logistics

    Slide 19: Port & Shipping Logistics

    Port & Shipping Logistics • September 2013 – results of Shipping Optimization Study led by AMEC • Includes input from shipping & transshipment companies as well as port authorities: • Fednav Limited • Canada Steamship Lines • Europees Massagoed Overslagbedrijf • Shipping strategy is technically feas

  20. Slide 20: Viable Year-Round Shipping Routes

    Slide 20: Viable Year-Round Shipping Routes

    Viable Year-Round Shipping Routes • Hopes Advance Bay is located at the midpoint between Deception Bay to the NW and Voisey’s Bay to the SE • Proven shipping technology: Glencore Xstrata, Vale, and soon Canadian Royalties all shipping 12 months per year with two of three operations located further n

  21. Slide 21: Social and Environmental Considerations

    Slide 21: Social and Environmental Considerations

    Social and Environmental Considerations • A corporate philosophy and first consideration in Hope’s Advance development • Clear communication and buy-in required from employees, consultants and contractors • Early stakeholder and government interaction • LOI agreed with Inuit community • Focus on add

  22. Slide 22: Global Steel Production to Increase 50% by 2021

    Slide 22: Global Steel Production to Increase 50% by 2021

    Global Steel Production to Increase 50% by 2021 • Driven by global population growth • China will lead, however India and growth in other geographic regions also contributors • Growth in global construction sector projected at +70% by 2025 • Economic iron ore resources in China declining with 40% of

  23. Slide 23: China Steel Demand

    Slide 23: China Steel Demand

    China Steel Demand Robust & Growing Over Medium - Long Term Source: Rio Tinto • China’s cumulative steel consumption per capita remains well behind developed world • New and replacement consumption will drive future growth focused in automotive, machinery and “white” products such as appliances, air

  24. Slide 24: Supply Cost CIF China

    Slide 24: Supply Cost CIF China

    Supply Cost CIF China “The National Development and Reform Commission on February 3, 2014 said Chinese steelmakers should keep building up stakes in global iron-ore assets in the interests of China's strategic security and "speaking rights," or influence, in global trade. China's ore imports rose 10

  25. Slide 25: China’s Increasing Importance as an Iron Ore Importer

    Slide 25: China’s Increasing Importance as an Iron Ore Importer

    China’s Increasing Importance as an Iron Ore Importer 25

  26. Slide 26: World Iron Ore Export Sources

    Slide 26: World Iron Ore Export Sources

    World Iron Ore Export Sources 26

  27. Slide 27: Low Operating Cost Relative to Peers

    Slide 27: Low Operating Cost Relative to Peers

    Low Operating Cost Relative to Peers Iron Road Limited 6 7 % C O N CE N T RAT E $59.26 Champion Iron Mines 6 5 %+ S IN T E R F E E D $44.05 Black Iron 6 7 % P E LLE T F E E D $43.97 Advanced Explorations 6 6 % C O N CE N T RAT E $49.13 Alderon Iron Ore 6 5 .5 % C O N CE N T RAT E $42.17 Afferro Mini

  28. Slide 28: Hopes Advance – The Premier Iron Ore Development Project

    Slide 28: Hopes Advance – The Premier Iron Ore Development Project

    Hopes Advance – The Premier Iron Ore Development Project • Exceptional large scale resource in low risk jurisdiction • Low cost producer: $30/tonne life of mine • High grade (66.5%) premium iron concentrate for seaborne market • Low impurities = high quality source of supply • Fast track development

  29. Slide 29: Appendices

    Slide 29: Appendices

    APPENDICES

  30. Slide 30: Leadership Team

    Slide 30: Leadership Team

    Leadership Team Steven Dean, • A Fellow of the Australian Institute of Mining and Metallurgy, a Member of the Canadian Institute of Mining, Executive Chairman Metallurgy and Petroleum, and a Fellow of the Institute of Chartered Accountants of Australia. Extensive and Director experience internationa

  31. Slide 31: Leadership Team

    Slide 31: Leadership Team

    Leadership Team Gordon Keep, • Extensive business experience in investment banking and creating public natural resource companies. Director Currently Executive Vice-President of Fiore Financial Corporation, a private boutique merchant banking firm • Also serves as an officer and/or director for seve

  32. Slide 32: Ungava Property Project Areas

    Slide 32: Ungava Property Project Areas

    UNGAVA PROPERTY PROJECT AREAS 3,703 CLAIMS – 1,568 SQ.KM. 32

  33. Slide 33: Conceptual Port Location

    Slide 33: Conceptual Port Location

    Conceptual Port Location 33

  34. Slide 34: Conceptual Port Design

    Slide 34: Conceptual Port Design

    Conceptual Port Design • Pointe Breakwater has natural attributes which make it an ideal potential location for a year round large tonnage vessel deepwater port 34

  35. Slide 35: Conceptual Shiploader Design

    Slide 35: Conceptual Shiploader Design

    Conceptual Shiploader Design • Shiploader will be engineered and constructed to accommodate the tides in Ungava Bay 35

  36. Slide 36: Trans-shipment

    Slide 36: Trans-shipment

    Trans-shipment Export vessel Floating Transfer Station • Floating transfer station with deck mounted equipment to transfer cargo from ice class vessels to export vessel 36

  37. Slide 37: Ice Class Ship In Action

    Slide 37: Ice Class Ship In Action

    Ice Class Ship In Action Source: Aker Arctic 37

  38. Slide 38: Section View of the Castle Mountain Grid

    Slide 38: Section View of the Castle Mountain Grid

    Section View of the Castle Mountain Grid 38

  39. Slide 39: Previous Work

    Slide 39: Previous Work

    Previous Work • Labrador Trough noted for iron potential in 1895 by GSC • First claims staked in Hopes Advance area in 1951 • 1950-1970 active exploration including sampling, trenching, drilling, metallurgical testwork • Ungava Iron Ores Company completed most of the exploration in Hopes Advance are

  40. Slide 40: Roberts Lake – Historical Resource

    Slide 40: Roberts Lake – Historical Resource

    Roberts Lake – Historical Resource* Crude Resource Head Iron Exploration Metres Deposit (million metric Source Date (Sol. Fe) Drillholes Drilled tonnes) Kayak Bay Zone (Zone 1) 111.7 35.3% 45 1,880 P.E. Cavanagh 1970 Payne River (Zone 2) 22.3 31.0% 26 2,535 P.E. Cavanagh 1970 Igloo Lake (Zone 3) 101

  41. Slide 41: Morgan Lake – Historical Resource

    Slide 41: Morgan Lake – Historical Resource

    Morgan Lake – Historical Resource* Crude Resource Head Iron Exploration Metres Deposit (million metric Source Date (Mag. Fe) Drillholes Drilled tonnes) Payne Range 72.4 23.9% 29 1,427 G.A. Gross 1964 Morgan Lake 437.8 21.8% 16 2,184 A.T. Griffis 1957 Total Drill Indicated 510.2 22.1% 45 3,611 --- --

  42. Slide 42: NPV Sensitivity to FOB Ungava Bay Iron Ore Price

    Slide 42: NPV Sensitivity to FOB Ungava Bay Iron Ore Price

    NPV Sensitivity to FOB Ungava Bay Iron Ore Price (Unlevered)* $11,000 $10,000 $9,000 $8,000 NPV @ 8% (million) $7,000 $6,000 $5,000 $4,000 $3,000 Pre-Tax $2,000 After-Tax $1,000 $0 75 80 85 90 95 100 105 110 115 120 125 130 135 FOB Ungava Bay ($ / tonne) * Source: Oceanic Iron Ore Corp. – NI 43-101

  43. Slide 43: NPV Sensitivity to Fuel Pricing

    Slide 43: NPV Sensitivity to Fuel Pricing

    NPV Sensitivity to Fuel Pricing 2.0 15.5 2.0 15.0 NPV @8% ($ billion) 1.9 14.5 1.9 14.0 1.8 13.5 IRR (%) 1.8 13.0 1.7 12.5 1.7 12.0 1.6 11.5 1.6 11.0 1.5 10.5 % of base case 70 75 80 85 90 95 100 105 110 115 120 125 130 After-Tax 1.9 1.9 1.9 1.8 1.8 1.8 1.7 1.7 1.6 1.6 1.6 1.5 1.5 IRR 15.0 14.8 14.7

  44. Slide 44: NPV Sensitivity to CAD:USD Exchange Rate

    Slide 44: NPV Sensitivity to CAD:USD Exchange Rate

    NPV Sensitivity to CAD:USD Exchange Rate 3.5 22.5 3.0 20.0 NPV @8% ($ billion) 2.5 17.5 IRR (%) 2.0 15.0 1.5 12.5 1.0 10.0 0.5 7.5 0.0 5.0 CAD/USD 0.85 0.90 0.95 1.00 1.05 1.10 1.15 1.20 1.25 1.30 1.35 1.40 1.45 After-Tax (0.1) 0.3 0.6 0.9 1.2 1.5 1.8 2.1 2.4 2.7 3.0 3.3 3.6 IRR 7.8 9.0 10.2 11.3 12

  45. Slide 45: Construction Capital Costs

    Slide 45: Construction Capital Costs

    Construction Capital Costs* Initial Capex Expansion Capex Capital Description 2014 to 2016 2025/2026 ($000) ($000) Mine Equipment 92,658 61,231 Mine Development 66,203 2,918 Crusher 29,674 30,355 Concentrator 481,514 492,643 Pipeline 56,740 83,787 Port Filtering and Drying 325,654 267,401 Port and M

  46. Slide 46: Total FOB Operating Costs (Excluding Royalty)

    Slide 46: Total FOB Operating Costs (Excluding Royalty)

    Total FOB Operating Costs (Excluding Royalty)* Years Years Years 2017 - 2024 2025 - 2026 2027 – 2047 Life of Mine Category (10 MM T/YR & (10 MM T/Y & (Post Average Self Generated Hydroelectric Expansion - 20 Power) Power) MM T/YR) Mining $1.57 $1.59 $1.23 $1.27 ($/tonne all material) Mining $5.46 $6

  47. Slide 47: Concentrator Operating Costs

    Slide 47: Concentrator Operating Costs

    Concentrator Operating Costs LOM Concentrator Operating Costs (Thousand $) Period 2017 – 2024 2025 – 2026 2027 – 2047 LOM Total Production Rate 10 M t/y 10 M t/y 20 M t/y - Power Self-Generated Hydroelectric Hydroelectric - Operating Cost Manpower $126,113 $32,285 $424,882 $583,280 Electric Power $9

  48. Slide 48: Oceanic Iron Ore Corp.

    Slide 48: Oceanic Iron Ore Corp.

    fn OCEANIC TRON LORE. CORP WWW.OCEANICIRONORE.COM TSX:V - FEO

Source: Internet Archive copy of oceanicironore.com

More decks from Oceanic Iron Ore Corp.

All 18 Oceanic Iron Ore decks