Oceanic Iron Ore Corp. · TSXV:FEO

Oceanic Iron Ore — Investor Presentation (October 2025)

26 slides from Oceanic Iron Ore's investor presentation, October 2025

  1. Slide 1: Investor Presentation

    Slide 1: Investor Presentation

    Investor Presentation October 2025 oceanicironore.com TSX.V: FEO

  2. Slide 2: Cautionary Notes

    Slide 2: Cautionary Notes

    Cautionary Notes This presentation includes certain "Forward-Looking Statements” as that term is used in applicable securities law. All statements included herein, other than statements of historical fact, including, without limitation, statements regarding potential mineralization and resources, ex

  3. Slide 3: Overview – Ungava Bay Projects

    Slide 3: Overview – Ungava Bay Projects

    Overview – Ungava Bay Projects OCEANIC IRON ORE Ungava Bay Projects CA NA DA • WORLD CLASS IRON ORE DEVELOPMENT U.S.A. 100% owned Iron ore development in the Labrador Trough (Québec), a proven world class mining jurisdiction and one of the largest sources of LEGEN D global Fe production Ungava Bay P

  4. Slide 4: Hopes Advance – A Premier High Quality, Low-Cost Iron Ore Project

    Slide 4: Hopes Advance – A Premier High Quality, Low-Cost Iron Ore Project

    Hopes Advance – A Premier High Quality, Low-Cost Iron Ore Project Robust PEA Economics (Amounts in USD) Large Scale Deposits • Base-case (at Study consensus FOB price of $82/t) • 1.4 billion tonnes of Measured and Indicated Mineral Resources* post-tax NPV8 of $1.4bn and IRR of 17% • Low mining costs

  5. Slide 5: Our Unique Advantage - No 3rd Party Reliance

    Slide 5: Our Unique Advantage - No 3rd Party Reliance

    Our Unique Advantage - No 3rd Party Reliance No Rail Requirement • Minimum Annual Production requirement for any new entrant to use QNSL rail infrastructure, such supply likely low in priority to major users • Significant capex and opex to connect and use any existing lines • No risk of logistical i

  6. Slide 6: Hopes Advance Re-scoped PEA (December 2019)

    Slide 6: Hopes Advance Re-scoped PEA (December 2019)

    Hopes Advance Re-scoped PEA (December 2019) RE-SCOPED FROM THE 2012 PRE-FEASIBILITY STUDY TO: Post Tax NPV & IRR Increases To  Lower initial capex while maintaining low opex/tonne $2.9bn/25% @ Spot  Eliminate winter shipping risk by shipping seasonally, reducing port capex • 5 MILLION TPA  Elimin

  7. Slide 7: Hopes Advance - Efficient use of Capital in a Proven Mining Jurisdiction

    Slide 7: Hopes Advance - Efficient use of Capital in a Proven Mining Jurisdiction

    Hopes Advance - Efficient use of Capital in a Proven Mining Jurisdiction AFTER TAX NPV/INITIAL CAPEX - UNFINANCED PROJECTS IN PROVEN JURISDICTIONS (AUSTRALIA/CANADA) 1.20 1.00 0.80 0.60 0.40 0.20 - Hopes Advance Lake Central Eyre Hawsons Southdown Lac Otelnuk Full Moon Lake Giles St Joseph Comparabl

  8. Slide 8: FEO’s Value Proposition - Significant Upside

    Slide 8: FEO’s Value Proposition - Significant Upside

    Production Upside - FEO’s Value Proposition - Significant Upside Remaining Deposits at Hopes Advance Resource Expansion Potential - Roberts + Morgan Lake After-Tax NPV8 based on Varying Iron Ore Price Points 3 2.5 $2.9 Bn After Tax NPV8 ($US Bn) 2 $2.4 Bn 1.5 1 $1.4 Bn 0.5 0 PEA Base Case LT Consens

  9. Slide 9: Hopes Advance Metallurgy

    Slide 9: Hopes Advance Metallurgy

    Hopes Advance Metallurgy Bench – Scale Testwork Pilot Plant Testwork and 2025 DR Grade Testwork (April 2012) Flowsheet Development Program In Progress (April 2012) • Over 600 samples across all deposits at Hopes • Based on 10 tonne and 250 tonne composite • 150kg of gravity and magnetic concentrate

  10. Slide 10: Valuable And Sought-after Product without DR Upgrade

    Slide 10: Valuable And Sought-after Product without DR Upgrade

    Valuable And Sought-after Product without DR Upgrade HIGH-GRADE, LOW-IMPURITY PRODUCT PERMITS STEEL MILLS TO OPTIMIZE BLENDS, BALANCING LOWER-QUALITY ORES, REDUCING COSTS, INCREASING EFFICIENCY AND REDUCING CO2 EMISSIONS IRON SILICA ALUMINA PHOSPHORUS • Hopes Advance concentrate product Hopes Advanc

  11. Slide 11: Competing On Cost Curve

    Slide 11: Competing On Cost Curve

    Competing On Cost Curve GLOBAL SEABORN TOTAL COST CURVE* (CFR China – Adjusted For VIU**) 120 • Hopes Advance has proven cost structure 100 • Product quality premium offsets differential when compared to Australian operators 80 • Major producers act as price setters as top Fortescue Metals four prod

  12. Slide 12: Product Versatility – 2025 Met Testwork Program

    Slide 12: Product Versatility – 2025 Met Testwork Program

    Product Versatility – 2025 Met Testwork Program 150 kg of gravity and magnetic concentrate from the 2012 bf pilot plant program submitted to leading laboratory to achieve the following • Confirm DR grade pellet feed potential with modest flow sheet modifications; and • Assess optimal effective flota

  13. Slide 13: Electric Air Furnaces & DRI – The Future In Low Emission Steel/Iron Ore Production

    Slide 13: Electric Air Furnaces & DRI – The Future In Low Emission Steel/Iron Ore Production

    Electric Air Furnaces & DRI – The Future In Low Emission Steel/Iron Ore Production To limit a global average temperature Steelmaking CO2 emissions including mining, processing and transportation increase to 1.5°C, steel CO2 emissions need to fall CO2 emissions tonnes/tonne liquid steel1,2 by more th

  14. Slide 14: Producing With A Low Emission Footprint – Canada vs other High Purity Iron Ore

    Slide 14: Producing With A Low Emission Footprint – Canada vs other High Purity Iron Ore

    Producing With A Low Emission Footprint – Canada vs other High Purity Iron Ore Producing Jurisdictions High Purity Iron Ore Emissions Footprint by country Canadian Iron Ore Production Is Advantaged By Significant hydropower generation capacity High-grade / processing ore deposits largely producing 6

  15. Slide 15: Viable Shipping Routes

    Slide 15: Viable Shipping Routes

    Viable Shipping Routes • Hopes Advance Bay is located at the midpoint between Deception Nuuk, Greenland Bay to the NW and Voisey’s Bay to the SE Ungava Bay 2,575nm • Red dotted line: Potential future routing through Northwest Rotterdam, Netherlands Passage to Qingdao, China 7,862nm Asian ports Sohar

  16. Slide 16: Social and Environmental Considerations

    Slide 16: Social and Environmental Considerations

    Social and Environmental Considerations • A corporate philosophy and first consideration in Hope’s Advance development • Clear communication and buy-in required from employees, consultants and contractors • Early stakeholder and government interaction • LOI agreed with Inuit community • LOI with Qué

  17. Slide 17: Next Steps

    Slide 17: Next Steps

    Next Steps Permitting • Engaging with environmental permitting consultants and support staff to agree on process and timeline on relevant regulatory permits Studies • Engaging with relevant engineering firms to determine scope for possible optimization studies and detailed engineering work Re-Engage

  18. Slide 18: Capitalization

    Slide 18: Capitalization

    Capitalization Capitalization Summary (September 30, 2025) Shares on Issue 150,757,458 Warrants ($0.07 - $0.19) 32,364,384 Options ($0.05 - $0.25) 10,755,000 Convertible Debentures ($0.075 - $0.19) 68,049,042 Restricted Share Units 33,334 Fully Diluted 261,959,218 Listing FEO (TSX-V) Insider Ownersh

  19. Slide 19: Supplemental Information

    Slide 19: Supplemental Information

    Supplemental Information OCEEANICIRONORE.COM TSX.V: FEO

  20. Slide 20: Directors and Management

    Slide 20: Directors and Management

    Directors and Management EXPERIENCED TEAM STEVEN DEAN GORDON KEEP CHRIS BATALHA CHAIRMAN CEO & EXECUTIVE DIRECTOR DIRECTOR AND DIRECTOR Steven Dean is a Fellow of the Australian Institute of Mining and Metallurgy, a Member of the Gordon Keep has extensive business experience in investment Mr. Batalh

  21. Slide 21: Directors and Managers Cont.

    Slide 21: Directors and Managers Cont.

    Directors and Managers Cont. EXPERIENCED TEAM CATHY CHAN THE HON. JOHN GERRIE VAN DER DIRECTOR REYNOLDS, P.C. WESTHUIZEN DIRECTOR CFO AND CORPORATE SECRETARY Ms. Cathy Chan has a wealth of experience in the Mr. Reynolds' career includes substantial Gerrie van der Westhuizen has more than 20 years' i

  22. Slide 22: Hopes Advance Mineral Resources

    Slide 22: Hopes Advance Mineral Resources

    Hopes Advance Mineral Resources MINERAL RESOURCES (25% Fe cut-off) Classification Tonnes Fe (%) Concentrate (t 000) Tonnes (000) Measured 774,241 32.2 288,971 Indicated 613,796 32.0 226,901 Measured & Indicated 1,388,037 32.1 515,872 Inferred 222,188 32.5 82,475 Notes: 1. The Qualified Person respon

  23. Slide 23: Hopes Advanced Site Layout

    Slide 23: Hopes Advanced Site Layout

    Hopes Advanced Site Layout NO RAIL REQUIREMENT 1 2 3 1 Expansion Stockpile 4 Expansion Phase TMF 10 5 2 Laydown and Cold Storage IRON VALLEY PIT 6 7 3 Camp 9 4 Fuel Tank Farm Ungava Bay 11 5 Port Concentrate Stockpile 6 Power Plant Barge N 7 Wharf and Ship loading 8 BAY ZONE B DEPOSIT 8 Bay Zone F W

  24. Slide 24: Hopes Advance Flowsheet – Simple Metallurgy

    Slide 24: Hopes Advance Flowsheet – Simple Metallurgy

    Hopes Advance Flowsheet – Simple Metallurgy High weight and iron recoveries are obtained using a simple flowsheet* Primary Grinding %Fe 32.9% %SiO2 43.7%* Wt% 100% Crushing HPGR Primary Grinding Grind 300 µm Gravity Tails Regrind Final Tails Tailings Management Facility Gravity Separation Magnetic S

  25. Slide 25: Top Shareholders

    Slide 25: Top Shareholders

    Top Shareholders % HOLDING - FULLY DILUTED Others Dean Group 26% 50% Fiore Group 24% 25 oceanicironore.com | Investor Presentation

  26. Slide 26: Contact information

    Slide 26: Contact information

    Contact information Chris Batalha CEO & Director Ph. 604.200.6094 info@oceanicironore.com www.oceanicironore.com

Source: Internet Archive copy of oceanicironore.com

More decks from Oceanic Iron Ore Corp.

All 18 Oceanic Iron Ore decks