Atlantic Gold Corp

Atlantic Gold — Investor Presentation (December 2016)

41 slides from Atlantic Gold's investor presentation, December 2016

  1. Slide 1: Developing the Next Canadian Open Pit Gold Mine

    Slide 1: Developing the Next Canadian Open Pit Gold Mine

    Developing the Next Canadian Open Pit Gold Mine CORPORATE PRESENTATION | DECEMBER 2016

  2. Slide 2: Important Cautionary Statements

    Slide 2: Important Cautionary Statements

    Important Cautionary Statements This presentation contains “forward-looking statements”. Forward-looking statements include, but are not limited to, statements with respect to the Company’s current review of potential mineral project investments and/or acquisitions, the estimation of mineral resourc

  3. Slide 3: Atlantic Today

    Slide 3: Atlantic Today

    Atlantic Today Canada’s only open pit gold project which is permitted, financed, and in construction. Completed Feasibility Study on the Moose River Consolidated (“MRC”) Project with a base case comprising the Touquoy and Beaver Dam deposits. Proven and Probable Reserves at MRC: 760,000 oz @ 1.44 g/

  4. Slide 4: Accomplishments for MRC

    Slide 4: Accomplishments for MRC

    Accomplishments for MRC • Macquarie / CAT Debt Commitment C$115M • CAT finance lease facility for Consolidated Feasibility Study work on mining fleet Ownership of NS MRC underway – target • MOU with Ausenco October 2015 Deposits completion mid 2015 • LSTK (Lump Sum Turn Key) Price agreed Ramp Up Com

  5. Slide 5: 2015 Feasibility Study – Base Case MRC Project

    Slide 5: 2015 Feasibility Study – Base Case MRC Project

    2015 Feasibility Study – Base Case MRC Project (Touquoy and Beaver Dam Deposits) Gold Price: CDN $1,500/oz (US $1200/oz @ 0.80 CAD/USD) Gold Price CDN$/oz $1,400 $1,500 $1,700 $1,800 $2,000 Pre-tax NPV5 - C$m $196 $236 $315 $355 $435 Post-tax NPV5 - C$m $140 $168 $224 $251 $306 Pre-tax IRR 31.1% 34.

  6. Slide 6: Low All-in Sustaining Costs

    Slide 6: Low All-in Sustaining Costs

    Low All-in Sustaining Costs Feasibility Study at C$ 1,500 / oz Au (US$1200/oz @ 0.80 CAD/USD) Margin (C$) $1,700 Cash Cost Summary MRC $1,500 Mining $304 $1,300 Processing $275 Gold Margin $1,100 C$1010 per oz.** Site G&A $47 $900 Cash Operating C$626 $700 Sustaining/Expansion $32 $500 Royalty, refi

  7. Slide 7: 2015 Feasibility Study – MRC Project

    Slide 7: 2015 Feasibility Study – MRC Project

    2015 Feasibility Study – MRC Project MRC LOM Production Production Metrics MRC (‘000 ounces) 100% Basis Total Ore Processed 16,452,000 140 Average Grade (g/t Au) 1.44 120 96.2 93.5 91.8 Strip Ratio: 100 90.2 90.2 84.9 76.6 73.5 Touquoy 80 2.3 Touquoy & Beaver Dam LOM 3.73 60 Average 40 LOM Gold Prod

  8. Slide 8: MRC Site Plan

    Slide 8: MRC Site Plan

    MRC Site Plan ATLANTICGOLDCORPORATION.COM 18

  9. Slide 9: Plant Site

    Slide 9: Plant Site

    Plant Site Touquoy Pit Water Collection ROM Pad Pond Plant Crushing Circuit 9

  10. Slide 10: MRC Project Site Overview

    Slide 10: MRC Project Site Overview

    MRC Project Site Overview Tailings Plant Site Management Facility Temporary Offices / Admin Buildings Touquoy Pit 10

  11. Slide 11: Reagent Building

    Slide 11: Reagent Building

    re) Reagent Building ATLANTICGOLDCORPORATION.COM

  12. Slide 12: Crushing Circuit, Steel Structure for Grinding Building, and the Laboratory Floor

    Slide 12: Crushing Circuit, Steel Structure for Grinding Building, and the Laboratory Floor

    Crushing Circuit, Steel Structure for Grinding Building, and the Laboratory Floor 12

  13. Slide 13: Upside Potential in Meguma Gold Belt, Nova Scotia

    Slide 13: Upside Potential in Meguma Gold Belt, Nova Scotia

    Upside Potential in Meguma Gold Belt, Nova Scotia Potential Opportunities within proximity to Touquoy central milling facility Defined resource estimate at Cochrane Hill, subject of a PEA dated October, 2014 as a life of mine production rate addition to the MRC study. 252,000 oz Au Indicated. 298,00

  14. Slide 14: Resource Definition and Regional Drill Program

    Slide 14: Resource Definition and Regional Drill Program

    Resource Definition and Regional Drill Program Resource Definition: 3 phase results driven approach for a total of 44,000 metres (340 holes approx.) of diamond drilling. Precursor program: 2,500 m over 20 diamond core holes infill and step out. 2nd Phase: 50m x 20m grid 3rd Phase: 25m x 20m grid Reg

  15. Slide 15: Expansion Case with Cochrane Hill Economics – 2014 PEA

    Slide 15: Expansion Case with Cochrane Hill Economics – 2014 PEA

    Expansion Case with Cochrane Hill Economics – 2014 PEA Gold Price: US $1,300/oz MRC Plus Cochrane MRC plus Cochrane Hill Case LOM Production @ .90 exchange rate Case (‘000 ounces) Pre-tax NPV5 $354 million 215.5 250 211.5 Post-tax NPV5 $242 million 182.2 Pre-tax IRR 38.0% 200 161.2 Post-tax IRR 31.5

  16. Slide 16: Significant Re-Rating Potential Remains

    Slide 16: Significant Re-Rating Potential Remains

    Significant Re-Rating Potential Remains AGB currently trading below comparable peer value PNAV(1) 1.4 1.2 1 0.8 P/NAV 0.6 0.4 0.2 0 CDN/US Commissioning Construction Permitting / Feasibility Producers Source: (1) Capital IQ, Analyst Consensus Estimates. *Denotes 2016 Takeout Valuation. 16

  17. Slide 17: Gold Developer P/NAV Landscape

    Slide 17: Gold Developer P/NAV Landscape

    Atlantic Gold – Gold Developer P/NAV Landscape 1.40x 1.20x Permitted & Financed Peer Average = 1.07x 1.00x 0.80x P/NAV 0.60x 0.60x 0.40x 0.20x 0.00x Pretium Exeter Seabridge Almaden Atlantic Gold Continental Luna Gold Orezone Integra Sabina Pilot Gold NewCastle Osisko Dalradian Belo Sun Victoria Mid

  18. Slide 18: Undervalued vs Producer Peer Group

    Slide 18: Undervalued vs Producer Peer Group

    Undervalued vs Producer Peer Group Junior Producers $1,100 Gold Resource Silver Lake $1,000 Timmins Doray Richmont Lakeshore* Wesdome Argonaut $900 McEwen 2016 AISC (US$/oz) Ramelius Claude* Klondex $800 TMAC $700 True Gold* $600 Roxgold AGB** $500 $400 $0 $200 $400 $600 $800 $1,000 $1,200 $1,400 $1

  19. Slide 19: Junior Gold Producers 2018 Price/Cashflow

    Slide 19: Junior Gold Producers 2018 Price/Cashflow

    Atlantic Gold – Junior Gold Producers 2018 Price/Cashflow 10.0x 9.0x 8.0x 7.0x Peer Average = 6.1x 6.0x 2018 P/CF 5.0x 4.0x 3.4x 3.0x 2.0x 1.0x 0.0x Klondex Mandalay Torex Timmins Roxgold Argonaut Silver Standard Richmont Guyana Dundee Precious Wesdome Alacer Teranga Golden Star SEMAFO Atlantic Gold

  20. Slide 20: Next Intermediate Gold Producer

    Slide 20: Next Intermediate Gold Producer

    Next Intermediate Gold Producer Companies built on successful development of small scale operations Macraes (New Zealand): 147koz pa Atlantic Gold Corporation Didipio (Philippines): 137koz pa OceanaGold Waihi (New Zealand): 120koz pa $145M Mkt Cap $3.0B Mkt Cap Haile (United States): 150koz pa *2017

  21. Slide 21: How Do We Approach The Business Differently?

    Slide 21: How Do We Approach The Business Differently?

    How Do We Approach The Business Differently? The gold development business is really no different to other businesses – it's about risk management, capital discipline and execution There are more risk management tools in mining in the gold sector • Grade control drilling in open pits provides higher

  22. Slide 22: Share Structure

    Slide 22: Share Structure

    Share Structure Atlantic Pro-Forma Capitalization Shares Outstanding 173,312,736 Secured Bank Debt commitment of $115m Warrants Outstanding 23,137,361 Secured Convertible Debenture finance of $13m ($0.60 Strike - Exp 08/18) Options 12,808,700 Secured CAT Finance Lease Mining Fleet facility of $20m D

  23. Slide 23: Board and Management Strength

    Slide 23: Board and Management Strength

    Board and Management Strength Management Team Board of Directors Steven Dean 30+ year mining career with proven successes in the junior and senior Ryan Beedie President of Beedie Development Group, a leader in Chairman & Chief mining space. Former President of Teck Cominco. Co-founder and former Dir

  24. Slide 24: Upcoming Catalysts

    Slide 24: Upcoming Catalysts

    Upcoming Catalysts Construction and Operations Commence Mine & Plant Construction Commissioning Q2 2016 Expected Monthly Construction Updates Q3 2017 2016 2017 Q4 2017 Ramp Up to Full Production Resource Expansion & LOM Plan Cochrane Hill & Fifteen New Resource Mile Stream deposits – Estimate expect

  25. Slide 25: Atlantic Gold Corporation

    Slide 25: Atlantic Gold Corporation

    Atlantic Gold Corporation Developing the next Canadian open pit gold mine Moose River Consolidated Nova Scotia, Resource Gold Project Canada Upside Near term cash flow with strong Potential to substantially increase Key Differentiators economics at today’s gold price MRC production and extend Focus

  26. Slide 26: Analyst Coverage

    Slide 26: Analyst Coverage

    Analyst Coverage Analyst Coverage Institution Analyst Email Canaccord Genuity Eric Zaunscherb ezaunscherb@canaccordgenuity.com GMP Securities Ian Parkinson iparkinson@gmpsecurities.com PI Financial Brian Szeto bszeto@pifinancial.com National Bank Financial Adam Melnyk adam.melnyk@nbc.ca Haywood Secu

  27. Slide 27: Appendices

    Slide 27: Appendices

    a i Jpg Appendices

  28. Slide 28: AGB Liquidity Analysis

    Slide 28: AGB Liquidity Analysis

    AGB Liquidity Analysis Source: National Bank Financial Inc. 28

  29. Slide 29: Mineral Resources

    Slide 29: Mineral Resources

    Mineral Resources* Tonnes (m) Grade (g/t) Gold (oz)** 1Touquoy* (63% owned) Measured & Indicated 10.1 1.5 480,000 Inferred 1.6 1.5 77,000 Beaver Dam* (100% owned) Measured & Indicated 9.3 1.4 427,000 Inferred 1.8 1.4 81,000 Cochrane Hill* (100% owned) Indicated 4.5 1.8 252,000 Inferred 5.6 1.6 298,0

  30. Slide 30: 2015 Feasibility Study – MRC Project

    Slide 30: 2015 Feasibility Study – MRC Project

    2015 Feasibility Study – MRC Project Initial Capital Costs ($ Million) Operating Costs ($/oz) MRC MRC Mine Development $16.9 Mining $304 Processing $51.0 Processing $275 Site Infrastructure $15.4 Site G&A $47 EPCM $10.0 Cash Operating $626 Tailings Dam $9.2 Sustaining/Expansion $32 Indirect Costs $2

  31. Slide 31: MRC Summary Flowsheet

    Slide 31: MRC Summary Flowsheet

    MRC Summary Flowsheet ‘CARBON REGENERATING = ‘ — KILN ; ! 1 L 1 1 1 1 i 1 1 1 1 1 i 1 ' 1 + (CuS08) } H (peso eee oR 1 1 1 Fitter Cake

  32. Slide 32: 2015 Feasibility Study – Processing & Metallurgy

    Slide 32: 2015 Feasibility Study – Processing & Metallurgy

    2015 Feasibility Study – Processing & Metallurgy MRC Simple metallurgy with estimated 94% gold recovery Conventional CIL flowsheet consisting of three stage crushing, ball milling to a grind of 80% passing 150 microns with cyclones used to close grinding circuit Gravity gold recoveries >70% Gravity

  33. Slide 33: Touquoy Core – Shale Hosted Mineralization

    Slide 33: Touquoy Core – Shale Hosted Mineralization

    Touquoy Core – Shale Hosted Mineralization NQ Diamond Drill Core – Hole MR-05-084 • 121-122 m : 2.16 g/t Au • 122-123 m : 9.23 g/t Au • 123-124 m : 8.98 g/t Au Argillite host rock with no quartz veins 33

  34. Slide 34: Touquoy – Plan View

    Slide 34: Touquoy – Plan View

    Touquoy – Plan View Atlantic Drill hole Earlier non- Atlantic Drill hole 34

  35. Slide 35: Touquoy – Cross Section

    Slide 35: Touquoy – Cross Section

    To0omAL Touquoy — Cross Section z 2 10200N 88-204 88-206 4 - 98-147 88-148 88-221 88-155 88-176 88-205 88-208 93.905 TioomRL oo re Argillite (mudstone) Greywacke (sandstone) 25 gitgold 42.5 metres High grades cut to 30 g/t IN fault ATLANTICGOLDCORPORATION.COM 135

  36. Slide 36: Cochrane Hill – Plan View

    Slide 36: Cochrane Hill – Plan View

    Cochrane Hill — Plan View 1 1 t nl ‘Atlantic Gold Diamond Dri Hole- INE Greywacke 730007RN = Ant Golde Diie nite + Prettaniccoltontve mm A “nwre Mineralized Trend AGBA00% AGB 100% ° tkm

  37. Slide 37: Cochrane Hill – Cross Section

    Slide 37: Cochrane Hill – Cross Section

    Cochrane Hill – Cross Section 37

  38. Slide 38: Beaver Dam – Plan of Local Geology

    Slide 38: Beaver Dam – Plan of Local Geology

    Beaver Dam – Plan of Local Geology 38

  39. Slide 39: Beaver Dam – Geometry of Gold Mineralization

    Slide 39: Beaver Dam – Geometry of Gold Mineralization

    Beaver Dam – Geometry of Gold Mineralization 39

  40. Slide 40: Fifteen Mile Stream Gold Deposit

    Slide 40: Fifteen Mile Stream Gold Deposit

    Fifteen Mile Stream Gold Deposit 100% owned by Atlantic Located ~57km by road from Touquoy >30,000m of drilling completed to date Historic resource estimate updated to a current resource estimate completed in March 2015 (0.5 g/t Au cut-off): • Inferred Resources: 11.7 Mt @ 1.55 g/t Au (584,000 oz Au

  41. Slide 41: i Jpg

    Slide 41: i Jpg

    a i Jpg AGB (TSX-V) ATLANTICGOLDCORPORATION.COM

Source: Internet Archive copy of atlanticgoldcorporation.com