Slide 1: Growing Gold Production in Nova Scotia
Growing Gold Production in Nova Scotia CORPORATE PRESENTATION | AUGUST 2018

Slide 2: Important Cautionary Statements
Important Cautionary Statements This presentation contains “forward-looking statements”. Forward-looking statements include, but are not limited to, statements with respect to the Company’s current review of potential mineral project investments and/or acquisitions, the estimation of mineral resourc

Slide 3: Atlantic's Key Differentiators
Atlantic’s Key Differentiators Shareholder alignment: Board & Management own + 35% Track record of company builders Focus on risk management We recognize that time is money Lowest quartile for both cash costs and all-in sustaining costs Demonstrable upside with “string of pearls” deposit strategy al

Slide 4: Four Phase Approach (Execution, Expansion, Growth, Exploration)
Four Phase Approach (Execution, Expansion, Growth, Exploration) Phase 1 Phase 2 Execution Expansion Commercial Production Declared March 2018 Staged Integration of 2 2018 Production Guidance Additional Satellite Deposits into production schedule (staged capex) Between 82,000-90,000 ounces at low AIS

Slide 5: Phase 2 Expansion Life of Mine Production Schedule
Phase 2 Expansion Life of Mine Production Schedule AISC of CAD$692 / oz. Au (USD$555 / oz. Au) Moose River Consolidated LOM Production ('000 ounces) 300 Phase 3 254.3 Resource Expansion Drilling 244.9 Fifteen Mile Stream & Cochrane Hill 250 230.5 202.4 Phase 4 Corridor Regional 200 171.5 Program 150

Slide 6: Backyard Canada
Backyard Canada Phase 1 LOM 2018 production guidance between 82,000-90,000 ounces of gold at All-In-Sustaining Costs between CAD$675-$735 / oz. (US$506-551/oz.*). Declared commercial production March 2018. Phase 2 Life of Mine Expansion** will boost annual gold production above 200,000 oz. gold with

Slide 7: Time is Money
Time is Money….. • Macquarie / CAT Debt Commitment C$115M Consolidated Feasibility Study work on • CAT finance lease facility for Ownership of NS MRC underway – target mining fleet Deposits completion mid 2015 • MOU with Ausenco October 2015 Updated Phase 2 • LSTK (Lump Sum Turn Key) Resource Ramp U

Slide 8: Best in Class Margin and Cash Flow Generation
Best in Class Margin and Cash Flow Generation Margin (CAD) $1,700 $1,600 Low AISC drivers: $1,500 Low Strip Ratio $1,400 $1,300 Gold Margin Location $1,200 CAD 1000 per oz.** $1,100 Medium Grade $1,000 Open Pit $900 $800 $700 $600 $500 All-in Sustaining $400 Cash Costs* $300 CAD 692 per oz. $200 (US

Slide 9: Lowest Quartile for both Cash and AISC Costs
Lowest Quartile for both Cash and AISC Costs Atlantic leads peers in both total cash costs and all-in sustaining costs 2018E CO-PDT Total Cash Costs (US$/OZ AU EQ.) $864 $768 $770 $788 $789 (1) $715 $588 $630 (1) $502 (2) Atlantic Guyana Torex Premier Argonaut Wesdome Beadell TMAC Leagold Goldfields

Slide 10: Atlantic Ranks in the First Decile of AISC / oz.
Atlantic Ranks in the First Decile of AISC / oz. Total Cash Cost + Sustaining Capex(1,2) (US$/oz) $2,000 Third Quartile: US$946/oz First Quartile: US$769/oz Second Quartile: US$879/oz $1,800 $1,600 $1,400 $1,200 $1,000 $800 Atlantic Gold $555 $600 $400 $200 -- 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 5

Slide 11: Declared Commercial Production – March 2018
Declared Commercial Production – March 2018 Built on budget and schedule Mill operating at design throughput capacity AISC between $CAD675-$735/oz. for 2018 2018 production guidance (82,000-90,000 ounces) Lowest quartile cash and all-in sustaining costs Phase 2 Expansion + 200,000 ounces of gold pro

Slide 12: Q1 2018 Financial Highlights
Q1 2018 Financial Highlights On track to meet annual production and cost guidance CASH COSTS AISC CAD $549/OZ 18,183 ounces of CAD $751/OZ production for First (USD $428/OZ @0.78 (USD $586/OZ @0.78 Quarter USD/CAD) USD/CAD) Good Grade Mill throughput and CAD $12.8 million recoveries exceeding Reconc

Slide 13: Q1 2018 Operating Results
Q1 2018 Operating Results For the month ended For the three months March 31, 2018 ended March 31, 2018 Operating data Ore mined Tonnes 367,456 1,094,487 Strip ratio (waste to ore) 0.63 0.47 Mining rate (Total Material) Tonnes per day 19,339 17,874 Ore milled Tonnes 188,221 419,150 Head grade g/t Au

Slide 14: Q1 2018 Financial Results
Q1 2018 Financial Results For the month ended For the three months March 31, 2018 ended March 31, 2018 IFRS Measures(1) Revenue CAD $12,881,462 Mine operating earnings 5,889,743 Net income and comprehensive income 3,310,557 Earnings per share - basic 0.02 Earnings per share – diluted 0.01 Total cash

Slide 15: Q2 2018 Production Results
Q2 2018 Production Results Milled head grade for Q2 2018 was 11% below life of mine reserve grade due to constraints in the pit where historical tailings had to be removed and prevented access to higher grade ore for more than 6 weeks. Access to the higher grade mining blocks was achieved by the end

Slide 16: Plant Site
Plant Site Tailings Management Facility Plant Touquoy Pit Coarse Ore Stockpile Facility Truck Shop Crushing Circuit Laboratory Mining Offices Admin Building 16

Slide 17: Plant Site
ATLANTICGOLDCORPORATION.COM

Slide 18: Phase 3 Expansion and Phase 4 Corridor Regional Program
Phase 3 Expansion and Phase 4 Corridor Regional Program $14 million Drill Program Phase 3: Resource Expansion and Definition Program: Targeting extensions to FMS and CH deposits Infilling existing resources to M&I categories Phase 4: Corridor Regional Program: Commencing in April 2018 Systematically

Slide 19: Phase 3 Expansion Drill Program: Fifteen Mile Stream
Phase 3 Expansion Drill Program Fifteen Mile Stream Gold Deposit 19

Slide 20: Phase 3 Expansion Drill Program: Cochrane Hill
Phase 3 Expansion Drill Program Cochrane Hill Gold Deposit 20

Slide 21: New High-Grade Zone at Cochrane Hill
New High-Grade Zone at Cochrane Hill Long Section 21

Slide 22: Reserves within Trucking Distance to a Central Processing Facility
Reserves within Trucking Distance to a Central Processing Facility MRC 760,000 oz Au P&P Reserves MRC Phase 2 (Fifteen Mile Stream and Cochrane Hill) 825,000 oz Au* P&P Reserves Central Processing Facility *Touquoy @ 0.40 g/t cut-off grade – 119,000 oz. (Proven), 306,000 oz. (Probable) , Beaver Dam:

Slide 23: Next Intermediate Gold Producer
Next Intermediate Gold Producer Companies built on successful development from operations Atlantic Gold Corporation OceanaGold $417M Mkt Cap $2.2B Mkt Cap Touquoy Macraes (New Zealand): 183koz pa Beaver Dam Didipio (Philippines): 122koz pa Cochrane Waihi (New Zealand): 117koz pa Fifteen Mile Haile (

Slide 24: ETF's Versus Atlantic Team Value Add
ETF’s Versus Atlantic Team Value Add The result of applying discipline and risk management to the gold business Q1 2018 Phase 2 Financial expansion study Results Production guidance for 2018 Mine and Plant Commissioning Commenced Phase 1 Construction Phase 1 MRC Declaration of Executed EPC fixed pri

Slide 25: Atlantic Gold Street Cash Flow Profile
Atlantic Gold Street Cash Flow Profile 2018E – 2022E Street operating cash flow profile (C$ mm) $171 $99 $84 $70 $61 2018E 2019E 2020E 2021E 2022E Source: FactSet, street research Note: Street profiles based on median broker consensus estimates with a 100-day estimate cut-off as of 23-Jul-18. Median

Slide 26: Compelling value opportunity – Canadian single-asset gold company
Compelling value opportunity – Canadian single-asset gold company with lowest decile AISC Atlantic Gold vs Past acquisitions of Canadian single-asset companies (P/NAV multiple vs average annual AISC) $1,100 Claude Resources Northgate Minerals $1,000 Average annual AISC (US$/oz) Lakeshore Gold Brigus

Slide 27: Share Structure
Share Structure Atlantic Pro-Forma Capitalization Executes commitment letter for $150m Shares Outstanding 224,138,891 Revolving Credit Facility to refinance project Warrants Outstanding loan facility - ***Refer to News Release July 3, 2018 13.6 million ($0.60 Strike - Exp 08/18) Liquidity: Total Cas

Slide 28: Board and Management Strength
Board and Management Strength Management Team Board of Directors Steven Dean 30+ year mining career with proven successes in the junior and senior mining space. Former Ryan Beedie President of Beedie Development Group, a leader in Chairman & Chief Executive President of Teck Cominco. Co-founder and

Slide 29: Analyst Target price
Analyst Target price Target price / Broker Report Date Discount Rate share (C$) Haywood Securities Feb-18 6.0% $1.80 GMP Securities 15-Feb-18 5.0% $2.65 Raymond James Financial 4-Apr-18 5.0% $2.50 Beacon Securities 28-Mar-18 5.0% $3.25 BMO Capital Markets 24-May-18 5.0% $2.75 Canaccord Genuity 22-Ap

Slide 30: Atlantic Gold Corporation Growing Gold Production in Nova Scotia
Atlantic Gold Corporation Growing Gold Production in Nova Scotia Phase One Phase Two Phase Three Phase Four Execution Expansion Growth Exploration Production Resource Corridor Staged Integration Guidance Expansion Drill Regional Program of 2 Additional Between 82,000-90,000 satellite deposits into p

Slide 31: Analyst Coverage
Analyst Coverage Institution Analyst Email BMO Capital Markets Andrew Mikitchook andrew.mikitchook@bmo.com Canaccord Genuity Rahul Paul rpaul@canaccordgenuity.com GMP Securities Ian Parkinson iparkinson@gmpsecurities.com Beacon Securities Michael Curran mcurran@beaconsecurities.ca PI Financial Chris

Slide 32: Appendices
Appendices AGB (TSX-V) ATLANTICGOLDCORPORATION.COM

Slide 33: AGB Liquidity Analysis – Jr. Producer
AGB Liquidity Analysis – Jr. Producer Peer group includes: • Mandalay • TMAC • Klondex, • Teranga • Guyana • Beadell • Ramelius • McEwen • Golden Star • Alacer • Wesdome • Roxgold • DPM • Argonaut • Alio • Premier Source: National Bank Financial Inc. 33

Slide 34: AGB Liquidity Analysis – Explorer / Developer
AGB Liquidity Analysis – Explorer / Developer Avg. Daily Volume as a % of Free Float Peer group includes: • Almaden • Belo Sun • Continental • Dalradian • Falco • GSV • Harte • Lundin Gold • Marathon • Midas • Newcastle Delta of Avg. Daily Volume as a % of Free Float versus Peers • Orezone • Osisko

Slide 35: Pre-Concentration Flowsheet for FMS and CH
Pre-Concentration Flowsheet for FMS and CH 35

Slide 36: Tailings Management Facility
Tailings Management Facility 36

Slide 37: Touquoy Open Pit
ATLANTICGOLDCORPORATION.COM

Slide 38: Meguma vein-hosted vs argillite-hosted gold
Meguma vein-hosted vs argillite –hosted gold Gold-bearing quartz veins – Mainly parallel to Additional dispersed gold mineralization bedding in argillite; some cross-cut bedding within argillite units – e.g. Touquoy Pit Weak argillite Cross-cutting veins (commonly barren): Strong 1. Brittle fracture

Slide 39: Grade controlled by lithology and structure
Grade controlled by lithology and structure 3D Geology: Touquoy Pit Current pit shell Argillite Greywacke Detailed knowledge of the Touquoy deposit has provided us with an understanding of how the mineralization is controlled by rock type – here concentrated within the grey argillite – and also by s

Slide 40: How Do We Approach The Business Differently?
How Do We Approach The Business Differently? The gold development business is really no different to other businesses – it's about risk management, capital discipline and execution There are more risk management tools in mining in the gold sector • Grade control drilling in open pits provides higher

Slide 41: Atlantic Gold Corporation
ATLANTIG ATLANTICGOLDCORPORATION.COM
Source: Internet Archive copy of atlanticgoldcorporation.com
More decks from Atlantic Gold Corp
Investor Presentation (January 2019)40 slides · January 2019
Investor Presentation (May 2017)44 slides · May 2017
Investor Presentation (December 2016)41 slides · December 2016
Investor Presentation (June 2015)34 slides · June 2015
Investor Presentation (February 2015)34 slides · February 2015
Investor Presentation (October 2014)33 slides · October 2014