Atlantic Gold Corp

Atlantic Gold — Investor Presentation (June 2015)

34 slides from Atlantic Gold's investor presentation, June 2015

  1. Slide 1: Gold Development & Consolidation

    Slide 1: Gold Development & Consolidation

    WWW.ATLANTICGOLDCORPORATION.COM TSX:V - AGB Gold Development & Consolidation Corporate Presentation - June 2015

  2. Slide 2: Important Cautionary Statements

    Slide 2: Important Cautionary Statements

    Important Cautionary Statements This presentation contains “forward-looking statements”. Forward-looking statements include, but are not limited to, statements with respect to the Company’s current review of potential mineral project investments and/or acquisitions, the estimation of mineral resourc

  3. Slide 3: Important Cautionary Statements

    Slide 3: Important Cautionary Statements

    Important Cautionary Statements NI 43-101 QUALIFIED PERSON - Neil Schofield, MS Applied Earth Sciences, MAusIMM, MAIG, a Qualified Person as defined by NI 43-101, has reviewed and is responsible for the technical information contained in this presentation, other than in respect of the Fifteen Mile S

  4. Slide 4: Atlantic Today

    Slide 4: Atlantic Today

    Atlantic Today • Counter cyclical strategy acquiring advanced projects in mining-friendly jurisdictions with AGB's Atlantic Pro-Forma Capitalization complementary technical and capital markets expertise, plus a strong cash position of over $16 Shares Outstanding 113,559,001* million Warrants Outstan

  5. Slide 5: Meguma Consolidation Strategy

    Slide 5: Meguma Consolidation Strategy

    Meguma Consolidation Strategy • Acquisition of Atlantic Gold NL & Acadian in Q4 2014 • Consolidates ownership of 4 known open pittable deposits in truckable proximity of a central milling facility to be built at Touquoy • Touquoy is fully permitted • Minimises environmental impacts & requirements •

  6. Slide 6: Board and Management Strength

    Slide 6: Board and Management Strength

    Board and Management Strength Steven Dean 30+ year mining career with proven successes in the junior and senior mining space. Former President Chairman & Chief Executive Officer of Teck Cominco. Co-founder and former Chairman of Amerigo Resources Ltd., former Chairman of Sierra Metals Inc., Chairman

  7. Slide 7: 2014 Preliminary Economic Assessment

    Slide 7: 2014 Preliminary Economic Assessment

    2014 Preliminary Economic Assessment • Two project scenarios reviewed • Moose River Consolidated (MRC) or the “Base Case” as defined in the PEA has initial production at Touquoy with the addition of Beaver Dam resource in year 5 • MRC plus Cochrane Hill – includes the addition of gravity and float c

  8. Slide 8: Schematic Production Schedule

    Slide 8: Schematic Production Schedule

    Schematic Production Schedule 8 ***Canadian Dollars unless otherwise indicated

  9. Slide 9: 2014 PEA Highlights

    Slide 9: 2014 PEA Highlights

    2014 PEA Highlights Gold Price: US $1,300/oz MRC MRC Plus Cochrane Case @ .90 exchange rate Pre-tax NPV5 $233 million $354 million Post-tax NPV5 $163 million $242 million Pre-tax IRR 39.6% 38.0% Post-tax IRR 33.5% 31.5% Post-tax Payback 1.7 years 3.3 years Initial capital cost $131 million $131 mill

  10. Slide 10: 2014 Preliminary Economic Assessment

    Slide 10: 2014 Preliminary Economic Assessment

    2014 Preliminary Economic Assessment MRC LOM Production MRC plus Cochrane Hill Case LOM Production (‘000 ounces) (‘000 ounces) 250 215.5 250 211.5 182.2 200 200 161.2 130.6 150 150 105.4 92.1 92.2 97.8 92.1 81.5 86.2 92.3 81.5 100 100 54.4 54.4 50 50 0 0 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 Life of Mine

  11. Slide 11: 2014 PEA – Cost Assumptions

    Slide 11: 2014 PEA – Cost Assumptions

    2014 PEA – Cost Assumptions Capital Costs ($ Million) Operational Costs ($/oz) MRC plus MRC Cochrane Hill MRC Cochrane Hill Mine Development $11.4 $9.9 Mining $286 $340 Processing $59.5 $53.5 Processing $254 $240 Site Infrastructure $17.7 $17.4 Site G&A $36 $32 Tailings Dam $7.5 $3.9 Cash Operating

  12. Slide 12: 2014 – PEA Sensitivities

    Slide 12: 2014 – PEA Sensitivities

    2014 – PEA Sensitivities MRC MRC Plus Cochrane Hill IRR IRR Post-Tax IRR % Post-Tax IRR % Post-Tax NPV ($) Post-Tax NPV ($) Gold Price (US$/oz) Gold Price (US$/oz) • MRC provides strong returns relatively insensitive to gold price, MRC Case plus Cochrane adds gold price leverage • Potential Opportun

  13. Slide 13: 2014 PEA – Processing and Metallurgy

    Slide 13: 2014 PEA – Processing and Metallurgy

    2014 PEA – Processing and Metallurgy Touquoy / Beaver Dam • Conventional flowsheet consisting of three stage crushing, ball milling to a grind of 80% passing 150 microns with cyclones used to close grinding circuit • Gravity concentration from cyclone underflow and intensive cyanidation of concentra

  14. Slide 14: New Look at Historic Goldfield

    Slide 14: New Look at Historic Goldfield

    New Look at Historic Goldfield • Highly prospective location within the historic Meguma Terrane of Nova Scotia, a sequence of NOVA SCOTIA folded Cambro-Ordovician sediments that is host to numerous gold deposits • Underexplored area that has seen little modern exploration to date • Majority of gold

  15. Slide 15: New Look at Historic Goldfield (Cont)

    Slide 15: New Look at Historic Goldfield (Cont)

    New Look at Historic Goldfield (Cont) • Historic prospectors and geologists not looking for disseminated shale hosted MOUNTED RC DRILL deposits • Modern exploration using a highly portable tractor mounted RC drill to quickly and inexpensively penetrate the cover of glacial till to identify potential

  16. Slide 16: Touquoy Core – Shale Hosted Mineralization

    Slide 16: Touquoy Core – Shale Hosted Mineralization

    Touquoy Core – Shale Hosted Mineralization • NQ Diamond Drill Core – Hole MR -05-084 • 121-122 m : 2.16 g/t Au • 122-123 m : 9.23 g/t Au • 123-124 m : 8.98 g/t Au • Argillite host rock with no visible quartz veins 16

  17. Slide 17: Touquoy Gold Deposit

    Slide 17: Touquoy Gold Deposit

    Touquoy Gold Deposit • All major permits in place, including: • Environmental Assessment Approval • Industrial Approval and Mineral Lease granted • All required property titles now acquired from local private landowners for the development of Touquoy; Nova Scotia Cabinet approved issuance of lease i

  18. Slide 18: Beaver Dam Gold Deposit

    Slide 18: Beaver Dam Gold Deposit

    Beaver Dam Gold Deposit • 100% owned by Atlantic – PEA complete • Located 37km by road, from Touquoy • >28,000m of drilling completed to date • Updated resource estimate completed in February 2015 (0.5 g/t Au cut-off): • Measured Resources: 4.07 Mt @ 1.55 g/t Au (202,200 oz Au)* • Indicated Resource

  19. Slide 19: Cochrane Hill Gold Deposit

    Slide 19: Cochrane Hill Gold Deposit

    Cochrane Hill Gold Deposit • 100% owned by Atlantic – PEA complete • Located ~80km from Touquoy • >15,000m of drilling completed to date • Updated resource estimate completed in August 2014 (0.5 g/t Au cut-off): • Indicated Resources: 4.5 Mt @ 1.8 g/t Au (252,000 oz Au)* • Inferred Resources: 5.6 Mt

  20. Slide 20: Fifteen Mile Stream Gold Deposit

    Slide 20: Fifteen Mile Stream Gold Deposit

    Fifteen Mile Stream Gold Deposit • 100% owned by Atlantic • Located ~57km by road from Touquoy • >30,000m of drilling completed to date • Updated historic resource estimate completed in March 2014 (0.5 g/t Au cut-off): • Inferred Resources: 11.7 Mt @ 1.55 g/t Au (584,000 oz Au)* • Future drilling to

  21. Slide 21: Mineral Resources

    Slide 21: Mineral Resources

    Mineral Resources* Tonnes (m) Grade (g/t) Gold (oz) Touquoy* Measured & Indicated 10.1 1.5 480,000 Inferred 1.6 1.5 77,000 Beaver Dam* Measured & Indicated 9.3 1.4 427,000 Inferred 1.8 1.4 81,000 Cochrane Hill* Measured & Indicated 4.5 1.8 252,000 Inferred 5.6 1.6 298,000 15 Mile Stream* Inferred 11

  22. Slide 22: Next Steps for Nova Scotia Assets

    Slide 22: Next Steps for Nova Scotia Assets

    Next Steps for Nova Scotia Assets Feasibility Study • Feasibility Study work on MRC underway – target completion mid 2015 Metallurgical • Complete metallurgical test work on Beaver Dam – April 2015 - DONE Testwork • Touquoy already fully permitted, and Beaver Dam expected to be straightforward given

  23. Slide 23: Valuation Snapshot

    Slide 23: Valuation Snapshot

    Valuation Snapshot Consensus P/NAV Trading Multiples** AGB Valuation 1.20x Market Capitalization $34 million 1.00x 0.80x 0.60x P/NAV Cash $16 million 0.40x 0.20x Enterprise Value $18 million 0.00x Senior Intermediate Junior Au P/NAV Company 0.1x – 0.2x Producers Producers Producers Developers P/NAV

  24. Slide 24: Why Invest in Atlantic?

    Slide 24: Why Invest in Atlantic?

    Why Invest in Atlantic? • Undervalued when compared against peers, even in current market • Market cap of $30m with cash of approximately $16m PLUS after-tax NPV5 of MRC Project at US $1,300 (C$1,440) per ounce gold of $163 million (at C$1600/oz NPV5 = $205m) • Potential to double MRC production fro

  25. Slide 25: Contact

    Slide 25: Contact

    Contact Atlantic Gold Corporation Canadian Office: Suite 3083, Three Bentall Centre 595 Burrard Street Vancouver, BC, V7X 1L3 +1 604 689 5564 info@atlanticgoldcorporation.com 25

  26. Slide 26: Appendices

    Slide 26: Appendices

    Appendices

  27. Slide 27: Touquoy – Plan View

    Slide 27: Touquoy – Plan View

    Touquoy — Plan View eon lg oT Mee O e) = a -= 5 © oovarilihole BB Asaitite (mudstone) * Earlier non-DDV drillhole || Greywacke (sandstone) AG ‘Anticlinal axis

  28. Slide 28: Touquoy – Cross Section

    Slide 28: Touquoy – Cross Section

    Touquoy — Cross Section ta 28

  29. Slide 29: Cochrane Hill – Plan View

    Slide 29: Cochrane Hill – Plan View

    Cochrane Hill — Plan View 1000 mE Atlantic Gold diamond drill hoke: ei \Greywacke Atlantic Gold RC drill hole ay ~ Pre Atlantic Gold drill hole parte Combeane Wi hotidiene } and mineralsed rend , ATV 400% ~~ t { \ \ i \\ < i ae Baia ATV 100%/ }s eo 4 wr { \ \ r] i

  30. Slide 30: Cochrane Hill – Cross Section

    Slide 30: Cochrane Hill – Cross Section

    Cochrane Hill – Cross Section 30

  31. Slide 31: Beaver Dam – Plan of Local Geology

    Slide 31: Beaver Dam – Plan of Local Geology

    Beaver Dam – Plan of Local Geology 31

  32. Slide 32: Beaver Dam – Geometry of Gold Mineralization

    Slide 32: Beaver Dam – Geometry of Gold Mineralization

    Beaver Dam – Geometry of Gold Mineralization 32

  33. Slide 33: Meguma Shale Hosted Deposits

    Slide 33: Meguma Shale Hosted Deposits

    Meguma Shale Hosted Deposits • Cambro-Ordovician turbidite sequence (Goldenville Gp) of thick, competent, impermeable argillites interrupted by occasional aquifers of thin fissile, permeable horizons • Devonian orogenesis – granite intrusion, regional fabric of upright open folding, greenschist to l

  34. Slide 34: Atlantic Gold Corporation website and ticker

    Slide 34: Atlantic Gold Corporation website and ticker

    WWW.ATLANTICGOLDCORPORATION.COM TSX:V - AGB

Source: Internet Archive copy of atlanticgoldcorporation.com

More decks from Atlantic Gold Corp