Evolution Mining Limited · ASX:EVN

Evolution Mining — Technical Presentation (September 2015)

30 slides from Evolution Mining's technical presentation, Sep 8, 2015

  1. Slide 1: Evolution Mining Cowal Site Visit

    For personal use only Evolution Mining Cowal Site Visit 8 September 2015

  2. Slide 2: Forward looking statement

    For personal use only Forward looking statement  These materials prepared by Evolution Mining Limited (or “the Company”) include forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as “may”, “will”, “expe

  3. Slide 3: Agenda

    Agenda For personal use only  0930 Welcome and site induction (morning tea provided)  1000 Presentations  1200 Lunch (BBQ)  1230 Site tour – pit lookout, infrastructure, processing plant  1430 Site visit wrap-up  1500 Transport to West Wyalong airport 3

  4. Slide 4: Evolution overview

    Evolution overview Cowal Pajingo For personal use only Gold Reserves (Moz)3 2.18 Gold Reserves (Moz)1 0.10 Gold Resources (Moz)3 5.09 Gold Resources (Moz)1 0.82 CY2014A Au Production (Koz) 275 FY2014A Au Production (Koz) 61 FY2015E Au Production (Koz) 230 - 260 Pajingo Mt Carlton FY2015A Au Producti

  5. Slide 5: Cowal highlights

    Cowal highlights For personal use only One of the most attractive gold assets in Australia  Cowal is a low cost operation with an annual AISC around A$900/oz  Large scale production averaging around 250 koz per annum  Significant potential for mine life extension via satellite pits and regional e

  6. Slide 6: Overview

    Overview For personal use only  Residential workforce Approximately 40 km north-east of Location West Wyalong in New South Wales,  Workforce: 286 employees and 55 contractors Australia  Mining commenced 2005 and processing in 2006 Mining method Conventional open pit  Owner-miner Minerals Gold 

  7. Slide 7: Location

    Location For personal use only Cowal Kalgoorlie 20km 7

  8. Slide 8: ML 1535

    For personal use only ML 1535 8

  9. Slide 9: Cowal Mineral Resources - December 2014

    Cowal Mineral Resources - Dec 2014 For personal use only Cowal Mineral Resources - December 2014 Measured Indicated Inferred Total Resource Mineral Cont. Cont. Cont. Cont. Resource Tonnes Grade Tonnes Grade Tonnes Grade Tonnes Grade Metal Metal Au Metal Au Metal Au (Mt) Au (g/t) (Mt) Au (g/t) (Mt) A

  10. Slide 10: Cowal Ore Reserves - December 2014

    Cowal Ore Reserves - Dec 2014 For personal use only Cowal Ore Reserves - December 2014 Proved Probable Total Reserve Cut-off Cont. Cont. Cont. Ore Reserve Tonnes Grade Au Tonnes Grade Au Tonnes Grade Au (g/t Au) Metal Au Metal Au Metal (Mt) (g/t) (Mt) (g/t) (Mt) (g/t) (koz) (koz) Au (koz) E42 oxide

  11. Slide 11: Mining

    Mining Mining commenced in 2005 For personal use only  Units FY15A FY16F LOM  Mining method: OP capital waste Mt - - - Drill & blast, load & haul  OP operating Mt 10.5 3.8 8.7  Batter height: 18 m, waste berm width: 9 m OP ore mined Mt 11.3 8.1 34.0  Batter face angle: 80˚ OP grade mined g/t 1.

  12. Slide 12: Material movement

    For personal use only Material movement 12

  13. Slide 13: Processing plant

    Processing plant For personal use only Units FY15A FY16F1 LOM2 Total tonnes Mt 7.2 7.2 72.6 processed Grade processed g/t 1.45 1.31 0.93 Gold recovery % 81.5 81.0 80.0 Gold produced koz 275 245 1,740 1. Full 12 months. Evolution completed Cowal acquisition on 24 July 2015. Production forecast of 245

  14. Slide 14: Cowal historic plant performance

    Cowal historic plant performance For personal use only Mt 298 koz 297 269 268 267 240 233 191 7.2 7.4 7.2 7.3 7.4 7.0 7.0 6.6 116 3.6 2006 2007 2008 2009 2010 2011 2012 2013 2014 Tonnes Gold recovered *All years are calendar years 14

  15. Slide 15: Near-mine exploration potential

    Near-mine exploration potential For personal use only Cowal 3D Model Grade Shells > 0.5g/t Au 15

  16. Slide 16: Regional exploration prospectivity

    Regional exploration prospectivity For personal use only 16

  17. Slide 17: EL 7750 and EL 1590 prospects

    EL 7750 and EL 1590 prospects For personal use only  Multiple high potential porphyry copper/gold targets within Cowal’s lease  Cowal Central has both porphyry Cu/Au and structurally hosted Au targets immediately south of North Cowal and east of E46 East  South Cowal has both porphyry Cu/Au and s

  18. Slide 18: Land tenure

    Land tenure For personal use only Evolution Mining Ltd (Evolution) (Evolution) (Evolution) 18

  19. Slide 19: Community relations

    Community relations  Modification proposal & general sensitivity to mining  Stakeholder Perceptions Survey undertaken during 2011 For personal use only operations − The survey found local stakeholders hold a positive view − Barrick submitted a proposal (Modification 11) to the of Cowal as a member

  20. Slide 20: Environment

    Environment For personal use only Lake Cowal overview Annual audit and compliance checks  Cowal has approximately 25 documented environmental  NSW’s largest ephemeral lake management plans to meet environmental regulatory requirements − Lake currently empty − On Australia’s register of national es

  21. Slide 21: Opportunities

    Opportunities  Ore reserve increase For personal use only  Increase ore reserve BFA from 80˚ to 90˚  Adding E41 and E46 to ore reserves  Further studies to assess potential E42 pit expansion  Improved grade estimation  Near mine exploration  Regional exploration  Cost reductions  Optimisati

  22. Slide 22: Appendix

    For personal use only Appendix www.evolutionmining.com.au

  23. Slide 23: Cowal history

    Cowal history For personal use only Gold first NSW government Cowal Gold Poject is Construction Cowal Gold Operation is discovered in West issues sold to Homestake commences on granted extension of mine Wyalong area Development Mining Cowal Gold life through to 2024 Consent conditions Project for th

  24. Slide 24: Mining equipment

    Mining equipment  Load and haul equipment For personal use only − 2 x Liebherr 994B hydraulic excavators − 1 x Hitachi 36500 excavator − 11 x Cat 789C dump trucks − 3 x Cat 789B dump trucks − 3 x Cat 785B dump trucks  Primary ancillary equipment − 2 x Cat 992G loaders − 3 x Cat D10T dozers (1x ren

  25. Slide 25: Process plant circuit

    Process plant circuit For personal use only

  26. Slide 26: Processing operations

    Processing operations  7.5 Mtpa1 processing facility designed to process sulphide and oxide ore separately For personal use only  Oxide ore processing: − Single stage gyratory crushing; grinding via 36’ SAG mill − Leach feed thickening and cyanide leaching − Destruction of cyanide using SMBS or Ca

  27. Slide 27: For personal use only

    For personal use only  The information in this document that relates to Evolution’s Cracow, Edna May, Mt Rawdon, Mt Carlton and Pajingo Mineral Resources and Ore Reserves is extracted from the ASX announcement entitled “Annual Mineral Resources and Ore Reserves Statement” created on 14 May 2015 (th

  28. Slide 28: Evolution Mineral Resources December 2014

    Evolution Mineral Resources December 2014 Evolution Mineral Resources – December 2014 Gold Measured Indicated Inferred Total Resource For personal use only Gold Gold Gold Gold Gold Gold Gold Gold Tonnes Tonnes Tonnes Tonnes Project Type Cut-Off Grade Metal Grade Metal Grade Metal Grade Metal (Mt) (M

  29. Slide 29: Evolution Ore Reserves December 2014

    Evolution Ore Reserves December 2014 For personal use only Evolution Ore Reserves – December 2014 Gold Proved Probable Total Reserve Gold Gold Gold Gold Gold Gold Tonnes Tonnes Tonnes Project Type Cut-Off Grade Metal Grade Metal Grade Metal (Mt) (Mt) (Mt) (g/t) (koz) (g/t) (koz) (g/t) (koz) Cowal1 O

  30. Slide 30: Evolution Mining

    For personal use only Evolution Mining ASX Code: EVN www.evolutionmining.com.au

Evolution Mining — Technical Presentation (September 2015) on 6ix