Camino Minerals Corporation · TSXV:COR

Camino Minerals — Investor Presentation (December 2024)

23 slides from Camino Minerals's investor presentation, December 2024

  1. Slide 1: Camino Minerals Corporation December 2024

    CAMINOCORP.COM TSX.V : COR | OTCQB : CAMZF | WKN: A116E1 DECEMBER 2024

  2. Slide 2: Cautionary Notes and Forward-Looking Statements

    Cautionary Notes and Forward-Looking Statements Forward Looking Statements: Forward-looking information in this presentation includes statements with respect to the proposed acquisition of the Project; the closing of the Transaction and satisfaction of the related conditions to close; the anticipate

  3. Slide 3: Experienced Board and Management

    3 EXPERIENCED BOARD AND MANAGEMENT JAY CHMELAUSKAS, BASc Geol. Eng., MBA CHRIS ADAMS CEO, President, Director Lead Independent Director • Former CEO of start-up to production companies Jinshan Goldmines Corp. (China), • Former Senior Managing Director and head of Macquarie’s mining finance now China

  4. Slide 4: Camino Strategy – Cashflow and Production Re-Rating

    44 CAMINO STRATEGY – CASHFLOW AND PRODUCTION RE-RATING 1. CONSTRUCT – The Puquios Copper Mine in Chile (with Nittetsu); Cashflow in the Current Copper Cycle. • Construct (with permits in place) the copper mine to generate cashflow as early as 2027. • Finance and operate the mine with Camino and Nitt

  5. Slide 5: Construction & Production Chile

    55 CONSTRUCTION & PRODUCTION CHILE

  6. Slide 6: Puquios Copper Mine Purchase with Nittetsu

    6 PUQUIOS COPPER MINE PURCHASE WITH NITTETSU Joint Venture with Nittetsu Mining Nittetsu is a Japanese corporation listed on the Tokyo • 50:50 Joint Venture Stock Exchange with 84-year history as a mining and • Each partner has rights to 50% of Cathode Offtake trading company. • CAMINO will manage P

  7. Slide 7: DFS Engineering and Peer Review

    7 DFS ENGINEERING AND PEER REVIEW Definitive Feasibility Study (Ausenco) Conventional Project for Execution • Geology - Wood • Open Pit with SX-EW copper cathode production • Mining - Moose Mountain • Leach and stack deposits from pre-strip material • Plant & infrastructure – Ausenco • Experienced w

  8. Slide 8: Upside Potential: Additional Sulphide Tonnage Below Open Pit

    8 UPSIDE POTENTIAL: ADDITIONAL SULPHIDE TONNAGE BELOW OPEN PIT LOCAL OXIDE, SULPHIDE RESOURCES, AND LEACHING TECHNOLOGY Local Oxide Miners in the Area: • Identifying local miners with potential to provide ore > 0.6 % CuT • Typically provides over 20% of feed for producing mines in region • Managemen

  9. Slide 9: Development Peru

    9 9 DEVELOPMENT PERU

  10. Slide 10: Los Chapitos Copper

    10 LOS CHAPITOS COPPER Potentially the Next Low-Capital Copper Oxide Mine to Build • Los Chapitos has over 26,000 meters of drilling completed intercepting mantos and breccia structures of oxide and sulphide copper mineralization. • 23,000 HA of contiguous exploration ground with three mineralized s

  11. Slide 11: Los Chapitos Drilling Campaign – Winter 2024/2025

    11 LOS CHAPITOS DRILLING CAMPAIGN – WINTER 2024/2025 FIVE NEW EXPLORATION TARGETS IDENTIFIED AT LA ESTANCIA FAULT Camino has also discovered additional copper zones at Pilar Maria along the Diva Trend and the Rumi Puka fault. Notable mineralization at multiple targets, including: • Pampero: Up to 3.

  12. Slide 12: Los Chapitos Drilling Highlights

    12 Multiple Mineralized Trends – DIVA, ATAJO, LA ESTANCIA 23,000 ha LOS CHAPITOS Pad 1 to Pad 4 extend over 350m strike length of Diva Trend DRILLING HIGHLIGHTS Significant copper intercept highlights (not true thickness) for Pad 1, Pad 2A, and Pad 4 include: DCH-001 (Pad 1) 55.3m @ 0.73% Cu from 7.

  13. Slide 13: Established Mining District - Los Chapitos Copper, Peru

    13 ESTABLISHED MINING DISTRICT - LOS CHAPITOS COPPER, PERU • Rio Tinto increasing claims contiguous to Camino in 2023 and 2024. Rio Tinto targeting large scale copper sulphide deposit along the La Estancia fault that continues on Camino claims for 12km then extends onto RT’s adjacent claims. • Mina

  14. Slide 14: Infrastructure to Build a Mine

    14 INFRASTRUCTURE TO BUILD A MINE (SIMILAR TO MARCONA AND MINA-JUSTA) 1. Power: 510KV lines over the property. Sub- station in nearby Chala. 2. Water: Seawater processing 15km to project. 3. Access: 40 minutes from Pan American Highway (mining and transport Town of Chala). Source: Esri, Garmin, GEBC

  15. Slide 15: Exploration Peru & Chile

    15 15 EXPLORATION PERU & CHILE

  16. Slide 16: Exploration Upside at Puquios

    16 16 EXPLORATION UPSIDE AT PUQUIOS (10,700 HA EXPLORATION & 2,894 HA EXPLOITATION)

  17. Slide 17: Maria Cecilia

    17 MARIA CECILIA MAJOR PORPHYRY SYSTEM PROLIFIC COPPER BELT • Newly Permitted Maria Cecilia central porphyry drilled in June 2024 • One drill hole has been completed to a depth of 700 meters with results expected in late August 2024 • Targeting oxide and sulphide copper mineralization outcropping at

  18. Slide 18: Maria Cecilia NI43-101 Resource Statement (2020)

    18 MARIA CECILIA NI43-101 RESOURCE STATEMENT (2020) Mineral Resource Statement for Toropunto and Emmanuel projects (8.9 US$/t NSR cut-off), Ancash Department, Peru, SRK Consulting (Peru) S.A., December 2020 Project Category Tonnes (Mt) CuEq (%) Cu (%) Au (g/t) Ag (g/t) Mo (ppm) (%) Toropunto Inferre

  19. Slide 19: Camino Corporation – Puquios Acquisition & Development

    19 CAMINO CORPORATION – PUQUIOS ACQUISITION & DEVELOPMENT CURRENT CAPITAL STRUCTURE PUQUIOS FINANCING Shares Outstanding 209,251,638 Initial Round Closing for Puquios Up to CAD$2 Million Fall 2024 Transaction Warrants (@ $0.10 Exercise Price) 33,333,334 Transaction Close Pre-Construction Options (@

  20. Slide 20: Our Commitment to ESG

    20 OUR COMMITMENT TO ESG Camino Corp. is dedicated to developing our projects to bring sustainable and long-lasting social and economic benefits for the host communities and all stakeholders. We engage in meaningful consultation and honest dialogue with representatives of the communities surrounding

  21. Slide 21: Camino Platform Value

    21 CAMINO PLATFORM VALUE: • ”Shovel-Ready” copper asset that has been with private equity. • Scarce asset profile consisting of production, development and exploration copper projects in Chile & Peru. • Extreme undervaluation compared to historical investments and peer value comparison. • Management

  22. Slide 22: Camino – Undervalued by Comparison

    22 CAMINO – UNDERVALUED BY COMPARISON

  23. Slide 23: Jay Chmelauskas, CEO, President & Director

    23 JAY CHMELAUSKAS BASC, MBA INVESTOR RELATIONS CEO, PRESIDENT & DIRECTOR INFO@CAMINOCORP.COM JAYC@CAMINOCORP.COM WWW.CAMINOCORP.COM 1.604.493.2058

Camino Minerals — Investor Presentation (December 2024) on 6ix