Murchison Minerals Ltd · TSXV:MUR
Murchison Minerals — Investor Presentation (August 2025)
24 slides from Murchison Minerals's investor presentation, August 2025
Slide 1: Discovering Energy Metals To Power the Future
2 0 2 5 Discovering Energy Metals To Power the Future August 2025 Investor Presentation C O R P O R AT E P R E S E N TAT I O N | TSXV: MUR | OTC: MURMF
Slide 2: Forward-Looking Statement
2 0 2 5 The statements, maps and models in this presentation are based on Forward looking information involves known and unknown risks, uncertainties information currently available to Murchison Minerals Ltd. (the and other factors which may cause the actual results, performance or “Company”) and th
Slide 3: Demand for energy metals and stable jurisdictions
2 0 2 5 To meet the rapidly expanding demand for energy metals, commitment, and expedited investment in exploration, mine development, and production is essential. We must look at stable jurisdictions for our future supply. Junior mining companies such as Murchison Minerals play a significant role i
Slide 4: Our Approach
2 0 2 5 OUR APPROACH OUR PROCESS OUR PROJECTS OUR PEOPLE A P P R O A C H Discovery of energy metals in • BMK (Brabant-McKenzie) VMS Highly experienced board with the underexplored areas with camp Zn-Cu-Ag Project in likes of JC Potvin and Don scale potential – within the best Saskatchewan Johnso
Slide 5: Murchison Overview
2 0 2 5 Murchison Overview Share Structure as of August 12th, 2025 Common Shares 20,774,745 O V E R V I E W Insider and Strategic Investors ~50% O/S Current Share Price CAD $0.31 Market Capitalization (Partially Diluted) CAD $6,440,170 52 Week High CAD $0.50 M I N E R A L S ’ 52 Week Low CAD
Slide 6: New Strategic Investor
2 0 2 5 New Strategic Investor I n v e s t o r On August 12th, 2025, Murchison closed its fully subscribed Private Placement for an aggregate of CAD $2 Million The Company welcomes HCC Group – a subsidiary of Misty ventures Inc., the economic development entity of Mistawasis Nêhiyawak First Nati
Slide 7: Project Snapshot: HPM and Brabant-McKenzie
HPM Ni-Cu-Co Project - Quebec 100% owned since 2019 Comprising ~834.9 km2 of continuous mineral claims Dominant land position with camp scale Ni-Cu-Co potential Brabant-McKenzie VMS Deposit Rail access within 8 km of project area, ~225 km to Port of – Saskatchewan Sept Iles 100% owned Nu
Slide 8: BMK | Saskatchewan
BMK | Saskatchewan P R O J E C T Zn-Cu-Ag-Pb-Au Project B M K M I N E R A L S ’ M U R C H I S O N C O R P O R AT E P R E S E N TAT I O N | TSXV: MUR | OTC: MURMF
Slide 9: BMK | 100% Owned | VMS Project
2 0 2 5 BMK | 100% Owned | VMS Project Located in northeast Saskatchewan M U R C H I S O N M I N E R A L S ’ B M K P R O J E C T M U R C H I S O N M I N E R A L S ’ B M K P R O J E C T approximately 170 km north-east of La Ronge Excellent Infrastructure Maintained road on the property – Saskat
Slide 10: BMK | 100% Owned | VMS Deposits
2 0 2 5 BMK | 100% Owned | VMS Deposits VMS deposits formed on ancient seafloor (BMK M U R C H I S O N M I N E R A L S ’ B M K P R O J E C T deposit is 1.8 billion years old) M U R C H I S O N M I N E R A L S ’ B M K P R O J E C T New deposits are currently being formed on the ocean They are c
Slide 11: BMK | Exploration Strategy
2 0 2 5 BMK | Exploration Strategy Discovery • The BMK Deposit is post discovery with a NI 43-101 resource, and tremendous M U R C H I S O N M I N E R A L S ’ B M K P R O J E C T growth potential as the deposit remains M U R C H I S O N M I N E R A L S ’ B M K P R O J E C T open and unconstrained. T
Slide 12: BMK | Location
2 0 2 5 BMK | Location M U R C H I S O N M I N E R A L S ’ B M K P R O J E C T M U R C H I S O N M I N E R A L S ’ B M K P R O J E C T Ruttan VMS mine produced 55 million tonnes grading 1.23% Cu and 1.41% zinc and the Fox VMS mine produced 12 million tonnes grading 1.82% Cu and 1.78% Zn C O R P O R
Slide 13: BMK | Brabant-McKenzie Deposit
2 0 2 5 BMK | Brabant-McKenzie Deposit Mineralized Domains with Drill Hole Intercepts • Outcrops at surface, dip averages -51 degrees NW • Mineralization tentatively correlated over 1,100 m strike length • 2 mineralized zones defined: M UMR UC RH CI HS IOS NO NM IMNI EN RE AR LA SL S’ ’ B BMMK K P R
Slide 14: BMK | Foran Deposit Comparison
2 0 2 5 BMK | Foran Deposit Comparison M U R C H I S O N M I N E R A L S ’ B M K P R O J E C T M U R C H I S O N M I N E R A L S ’ B M K P R O J E C T *Comparison does not factor in grade and uses difference cut off values for each respective historic NI43-101 and illustration is for comparative pur
Slide 15: BMK | BMK Trend
2 0 2 5 BMK | BMK Trend The Company has identified the BMK Trend, which contains prospective VMS lithology, including 37 km of strike length M UMR UC RH CI HS IOS NO NM IMNI EN RE AR LA SL S’ ’ B BMMK K P R O J E C T with VMS style mineralization M U R C H I S O N M I N E R A L S ’ B M K P R O J E
Slide 16: BMK | Next Steps
2 0 2 5 BMK | Next Steps Complete systematic EM geophysical surveying immediately north of the BMK deposit over top of the Betty Zone where M U R C H I S O N M I N E R A L S ’ B M K P R O J E C T 1.33% Cu and 4.4% Zn previously M U R C H I S O N M I N E R A L S ’ B M K P R O J E C T intersected
Slide 17: HPM | Quebec
HPM | Quebec 2 0 2 2 P R O J E C T Ni-C u-C o Pro j e c t H P M M I N E R A L S ’ M U R C H I S O N C O R P O R AT E P R E S E N TAT I O N | TSXV: MUR | OTC: MURMF
Slide 18: Murchison | Critical Minerals
Murchison | Critical Minerals Murchison Minerals 100%-owned HPM Project in the North M I N E R A L S • Shore Region is currently in the exploration stage of the Critical and Strategic Minerals cycle laid out by the Government of Quebec • HPM Project is 834.9 km2 represents • The projects aligns with
Slide 19: HPM | 100% Owned | Ni-Cu-Co Project
2 0 2 5 HPM | 100% Owned | Ni-Cu-Co Project Project Area Located in the Haut-Plateau de la Manicouagan region of Quebec, P R O J E C T adjacent to the Manicouagan Impact Structure Excellent infrastructure with existing and maintained rail line running through the project site - direct access to
Slide 20: HPM | Project History
2 0 2 5 HPM | Project History 1. HISTORY: In 1999 Falconbridge discovers Ni-Cu-Co mineralization. Falconbridge’s interest acquired by Pure Nickel who partnered with Murchison’s predecessor in 2007, drilling P R O J E C T the Barre de Fer deposit in 2008. Murchison acquires 100% interest in 2019 2. G
Slide 21: HPM | Barre de Fer Highlights
2 0 2 5 HPM | Barre de Fer Highlights BDF Highlight Drillholes NiEq.%* CuEq. Hole From (m) To (m) Length* (m) Ni % Cu % Co % * %** 123.8 245 121.2 1.02 0.56 0.07 1.34 3.91 Includes 134.1 144.2 10.1 2.08 1.17 0.14 2.74 7.99 P R O J E C T Includes 152 196 44 1.58 0.71 0.11 2.02 5.91 Including 152 180.
Slide 22: HPM | BDF Trend
2 0 2 5 HPM | BDF Trend P R O J E C T H P M M I N E R A L S ’ M U R C H I S O N C O R P O R AT E P R E S E N TAT I O N | TSXV: MUR | OTC: MURMF
Slide 23: Executive & Board of Directors
2 0 2 5 JEAN-CHARLES (JC) POTVIN, B.Sc. (Hon), MBA Executive & Board of Directors ERIK H. MARTIN CPA, CMA Executive Chairman Chief Financial Officer and Corporate Secretary • Co-founder of the Company • 25 years of financial disclosure & management experience with publicly-listed • President and CEO
Slide 24: Corporate Address and Contact Information
2 0 2 5 C O R P O R A T E P R E S E N T A T I O N Corporate Address: 5063 North Service Road Burlington, ON L7L 5H6 Contact Information: Troy Boisjoli, President, CEO, & Director Erik Martin, CFO John Shmyr, Vice President Exploration Justin LaFosse, Director Corporate Development T: +1 416 565 4411
Murchison Minerals — Investor Presentation (August 2025) on 6ix