Murchison Minerals Ltd · TSXV:MUR

Murchison Minerals — Investor Presentation (May 2025)

25 slides from Murchison Minerals's investor presentation, May 2025

  1. Slide 1: Discovering Energy Metals To Power the Future

    2 0 2 5 Discovering Energy Metals To Power the Future C O R P O R AT E P R E S E N TAT I O N | TSXV: MUR | OTC: MURMF

  2. Slide 2: Forward-looking statements

    2 0 2 5 The statements, maps and models in this presentation are based on Forward looking information involves known and unknown risks, uncertainties information currently available to Murchison Minerals Ltd. (the and other factors which may cause the actual results, performance or “Company”) and th

  3. Slide 3: Meeting the rapidly expanding demand for energy metals

    To meet the rapidly expanding demand for energy metals, commitment, and expedited investment in exploration, mine development, and production is essential. We must look at stable jurisdictions for our future supply. Junior mining companies such as Murchison Minerals play a significant role in the di

  4. Slide 4: Our Approach

    OUR APPROACH 2 0 2 5 OUR PROCESS OUR PROJECTS OUR PEOPLE A P P R O A C H  Discovery of energy metals in • BMK (Brabant-McKenzie) VMS Zn-  Highly experienced board with the underexplored areas with camp scale Cu-Ag Project in Saskatchewan likes of JC Potvin and Don Johnson. potential – within the b

  5. Slide 5: Murchison Overview

    2 0 2 5 Murchison Overview O V E R V I E W Share Structure as of May 26th, 2025 Common Shares​ 298,273,022​ Insider and Strategic Investors​ ~50% O/S​ M I N E R A L S ’ Current Share Price CAD​ $0.015 Market Capitalization (Partially Diluted) CAD​ $4,474,095 52 Week High CAD​ $0.035 52 Week Low CAD​

  6. Slide 6: Project Snapshot: HPM and Brabant-McKenzie

    HPM Ni-Cu-Co Project - Quebec  100% owned since 2019  Comprising ~834.9 km2 of continuous mineral claims  Dominant land position with camp scale Ni-Cu-Co potential Brabant-McKenzie VMS Deposit  Rail access within 8 km of project area, ~225 km to Port of – Saskatchewan Sept Iles  100% owned  Nu

  7. Slide 7: BMK | Saskatchewan

    BMK | Saskatchewan P R O J E C T Zn-Cu-Ag-Pb-Au Project B M K M I N E R A L S ’ M U R C H I S O N C O R P O R AT E P R E S E N TAT I O N | TSXV: MUR | OTC: MURMF

  8. Slide 8: BMK | 100% Owned | VMS Project

    2 0 2 5 BMK | 100% Owned | VMS Project  Located in northeast Saskatchewan P R O J E C T approximately 170 km north-east of La Ronge  Excellent Infrastructure B M K  Maintained road on the property – Saskatchewan HWY 102 M I N E R A L S ’  Existing power-lines running through project site  Proje

  9. Slide 9: BMK | Location

    BMK | Location 2 0 2 5 P R O J E C T B M K M I N E R A L S ’ M U R C H I S O N Ruttan VMS mine produced 55 million tonnes grading 1.23% Cu and 1.41% zinc and the Fox VMS mine produced 12 million tonnes grading 1.82% Cu and 1.78% Zn C O R P O R AT E P R E S E N TAT I O N | TSXV: MUR | OTC: MURMF

  10. Slide 10: BMK | BMK Trend

    2 0 2 5 BMK | BMK Trend  The Company has identified the BMK Trend, which contains prospective VMS lithology, including 37 km of strike length with VMS style mineralization  Dr. Stephen Piercey is working with Murchison Minerals to optimize exploration for discovery of Copper rich stockwork zone pr

  11. Slide 11: BMK | Brabant-McKenzie Deposit

    2 0 2 5 BMK | Brabant-McKenzie Deposit Mineralized Domains with Drill Hole Intercepts • Outcrops at surface, dip averages -51 degrees NW • Mineralization tentatively correlated over 1,100 m strike length • 2 mineralized zones defined: • Upper Mineralized Zone • Defined over strike and dip length of

  12. Slide 12: BMK | Metallurgical Results

    2 0 2 5 BMK | Metallurgical Results  Drill core representative of the indicated resource of the deposit was submitted to the Saskatchewan Research Council in 2021 for P R O J E C T preliminary metallurgical work  A 15.35 metre sample was blended, crushed, and homogenized to make a master composite

  13. Slide 13: BMK | Foran Deposit Comparison

    BMK | Foran Deposit Comparison 2 0 2 5 P R O J E C T B M K M I N E R A L S ’ M U R C H I S O N *Comparison does not factor in grade and uses difference cut off values for each respective historic NI43-101 and illustration is for comparative purposes only. Resource data sourced from respective NI43-1

  14. Slide 14: BMK | 2024 Winter Drill Program

    BMK | 2024 Winter Drill Program 2 0 2 5 • The Program comprised four diamond drill holes totaling 2,712m P R O J E C T • BMK North and South Extension Targets - drilling expanded the footprint of mineralization along B M K strike from BMK: o BMK24-002 intersected 3.1 m of mineralization M I N E R A

  15. Slide 15: BMK | Next Steps

    BMK | Next Steps 2 0 2 5  Complete systematic EM geophysical surveying immediately north of the BMK deposit over top of the Betty Zone where P R O J E C T 1.33% Cu and 4.4% Zn previously intersected  Area has never had ground EM surveying with only shallow penetrating airborne EM B M K  Complete

  16. Slide 16: HPM | Quebec

    HPM | Quebec 2 0 2 2 P R O J E C T Ni-C u-C o Pro j e c t H P M M I N E R A L S ’ M U R C H I S O N C O R P O R AT E P R E S E N TAT I O N | TSXV: MUR | OTC: MURMF

  17. Slide 17: Murchison | Critical Minerals

    Murchison | Critical Minerals 2 0 2 5 Murchison Minerals 100%-owned HPM Project in the North M I N E R A L S • Shore Region is currently in the exploration stage of the Critical and Strategic Minerals cycle laid out by the Government of Quebec • HPM Project is 834.9 km2 represents • The projects ali

  18. Slide 18: HPM | 100% Owned | Ni-Cu-Co Project

    HPM | 100% Owned | Ni-Cu-Co Project 2 0 2 5 Project Area Located in the Haut-Plateau de la Manicouagan region of Quebec, P R O J E C T  adjacent to the Manicouagan Impact Structure  Excellent infrastructure with existing and maintained rail line running through the project site - direct access to

  19. Slide 19: HPM | Project History

    HPM | Project History 2 0 2 5 1. HISTORY: In 1999 Falconbridge discovers Ni-Cu-Co mineralization. Falconbridge’s interest acquired by Pure Nickel who partnered with Murchison’s predecessor in 2007, drilling P R O J E C T the Barre de Fer deposit in 2008. Murchison acquires 100% interest in 2019 2. G

  20. Slide 20: HPM | Barre de Fer

    HPM | Barre de Fer 2 0 2 5 2022 Diamond Drilling Barre de Fer P R O J E C T  The Barre de Fer Zone is currently defined with 35 diamond drillholes comprising 8,919 m  During the 2022 Summer Exploration program the Company successfully expanded the footprint of BDF: H P M  Mineralization at depth

  21. Slide 21: HPM | Barre de Fer Highlights

    HPM | Barre de Fer Highlights 2 0 2 5 BDF Highlight Drillholes NiEq.%* CuEq. Hole From (m) To (m) Length* (m) Ni % Cu % Co % * %** 123.8 245 121.2 1.02 0.56 0.07 1.34 3.91 Includes 134.1 144.2 10.1 2.08 1.17 0.14 2.74 7.99 P R O J E C T Includes 152 196 44 1.58 0.71 0.11 2.02 5.91 Including 152 180.

  22. Slide 22: HPM | District Scale Potential

    HPM | District Scale Potential 2 0 2 5 HPM Regional Prospecting  Prospecting defines de-risked targets for future testing with diamond drilling  Beyond BDF, Syrah and PYC regional prospecting has discovered 10 additional P R O J E C T nickel-sulphide outcropping and subcropping at surface includin

  23. Slide 23: HPM | BDF Trend

    HPM | BDF Trend 2 0 2 5 P R O J E C T H P M M I N E R A L S ’ M U R C H I S O N C O R P O R AT E P R E S E N TAT I O N | TSXV: MUR | OTC: MURMF

  24. Slide 24: Executive & Board of Directors

    JEAN-CHARLES (JC) POTVIN, B.Sc. (Hon), MBA Executive & Board of Directors ERIK H. MARTIN CPA, CMA Executive Chairman Chief Financial Officer and Corporate Secretary • Co-founder of the Company • 25 years of financial disclosure & management experience with publicly-listed • President and CEO of Pang

  25. Slide 25: Corporate Address and Contact Information

    2 0 2 5 C O R P O R A T E P R E S E N T A T I O N Corporate Address: 5063 North Service Road Burlington, ON L7L 5H6 Contact Information: Troy Boisjoli, President, CEO, & Director Erik Martin, CFO John Shmyr, Vice President Exploration Justin LaFosse, Director Corporate Development T: +1 416 565 4411

Murchison Minerals — Investor Presentation (May 2025) on 6ix