Juno Minerals Ltd. · ASX:JNO

Juno Minerals — Investor Presentation (February 2021)

16 slides from Juno Minerals's investor presentation, Feb 11, 2021

  1. Slide 1: Investor Presentation and Q&A

    Slide 1: Investor Presentation and Q&A

    Investor Presentation and Q&A 11 February 2021

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer IMPORTANT: Please read the following before continuing. This Presentation has been prepared by Juno Minerals Limited ACN 645 778 892 (Juno or the Company) solely for information purposes. This Presentation has not been approved by any regulatory or supervisory authority. This Presentation

  3. Slide 3: Introduction

    Slide 3: Introduction

    Introduction • Juno Minerals is targeting a fast-track path to development of the Mount Mason DSO Hematite Project • Commence with production of DSO Fines, transporting ore by truck to an existing rail siding, then utilising above rail handling solutions to rail to Esperance Port. • Existing Jupiter

  4. Slide 4: Board & Management

    Slide 4: Board & Management

    Board & Management Priyank Thapliyal Greg Durack Hyung Nam Lee Non-Executive Chairman Managing Director & CEO Non-Executive Director Priyank is Managing Director and Greg has over 38 years experience Mr. Lee is the Project Manger of CEO of Jupiter Mines. Priyank has in operations and project POSCO A

  5. Slide 5: Mount Mason DSO Hematite Project

    Slide 5: Mount Mason DSO Hematite Project

    Mount Mason DSO Hematite Project • Well advanced, proven DSO Mineral Resource • Existing accommodation camp (pictured right, bottom) for immediate commencement of works • Project is positioned to be fast-tracked into development on a relatively low capital cost basis, small management team, and all

  6. Slide 6: Mount Mason DSO Hematite Project

    Slide 6: Mount Mason DSO Hematite Project

    Mount Mason DSO Hematite Project • Original Feasibility Study completed 2012 • Resource at surface level – conventional open pit mining • Measured and Indicated Mineral Resources of 5.9 million tonnes at 60.1% Fe • No further drilling required to progress development to an initial modest level of pr

  7. Slide 7: Mount Ida Magnetite Project

    Slide 7: Mount Ida Magnetite Project

    Mount Ida Magnetite Project • Juno’s secondary focus once Mount Mason Project underway • Test an alternate mining and processing flow sheet to reduce capital and operating costs • Large resource (1.85 billion tonnes at 29.5% Fe) of magnetic lower grade ore that can be beneficiated to produce a high

  8. Slide 8: Investment Proposition

    Slide 8: Investment Proposition

    Investment Proposition • Well advanced DSO hematite project – low capital cost, granted mining lease, majority of approvals in place. • Access to existing logistics and infrastructure – existing rail siding, then rail to Port of Esperance. • Favourable market conditions for iron ore – price at 7-yea

  9. Slide 9: IPO Offer Details

    Slide 9: IPO Offer Details

    IPO Offer Details Company Juno Minerals Limited Listing Location ASX (proposed ASX code: JNO). Offer Issue of up to 80,000,000 Shares to raise up to $20,000,000. Offer Price $0.25 per Share. Offer Size Minimum application $1,000, in parcels of $500 thereafter. • Satisfy the requirements for the admi

  10. Slide 10: IPO Transaction Timetable

    Slide 10: IPO Transaction Timetable

    IPO Transaction Timetable Event Target Date Lodgement of Prospectus 21 January 2021 Opening Date of Share Offer 1 February Closing Date of Share Offer 26 February 2021 Issue of Shares under Share Offer 8 March 2021 Despatch of Holding Statements 10 March 2021 Shares commence trading on ASX 11 March

  11. Slide 11: Appendices

    Slide 11: Appendices

    minerals | limited, | .& a.

  12. Slide 12: Mineral Resources Estimates of the Mount Mason DSO Hematite Project

    Slide 12: Mineral Resources Estimates of the Mount Mason DSO Hematite Project

    Mineral Resources Estimates of the Mount Mason DSO Hematite Project In accordance with JORC Code (2012) at January 2018: Mineral Resources – Mount Mason 12

  13. Slide 13: Mineral Resources Estimates of the Mount Ida Magnetite Project

    Slide 13: Mineral Resources Estimates of the Mount Ida Magnetite Project

    Mineral Resources Estimates of the Mount Ida Magnetite Project In accordance with JORC Code (2012) at January 2018: Mineral Resources – Mount Ida 13

  14. Slide 14: Mineral Resources Estimates of the Mount Ida Magnetite Project

    Slide 14: Mineral Resources Estimates of the Mount Ida Magnetite Project

    Mineral Resources Estimates of the Mount Ida Magnetite Project In accordance with JORC Code (2012) at January 2018: Mineral Resources – Mount Ida 14

  15. Slide 15: Mineral Resources Estimates of the Mount Ida Magnetite Project

    Slide 15: Mineral Resources Estimates of the Mount Ida Magnetite Project

    Mineral Resources Estimates of the Mount Ida Magnetite Project In accordance with JORC Code (2012) at January 2018: Mineral Resources – Mount Ida 15

  16. Slide 16: Potential Risks

    Slide 16: Potential Risks

    Potential Risks Securing personnel and contractors - The development of the Mount Performance of agents and contractors - The ability of Juno Minerals to Mason DSO Hematite Project depends on the Company being able to achieve its business objectives will depend on the performance by Juno secure suit

Source: Internet Archive copy of junominerals.com.au