Slide 1: Investor Presentation – Central Yilgarn Projects
Investor Presentation For personal use only Central Yilgarn Projects Mount Mason DSO Hematite Mount Ida Lithium Prospect Mount Ida Magnetite 27 November 2024

Slide 2: Disclaimer
Disclaimer IMPORTANT: Please read the following before continuing. This Presentation has been prepared by Juno Minerals Limited ACN 645 778 892 (Juno or the Company) solely for information purposes. This Presentation has not been approved by any regulatory or supervisory authority. For purposes of t

Slide 3: Board
Board David Moroney Greg Durack Patrick Murphy Independent Chair Managing Director & CEO Non-Executive Director & Non-Executive Director Greg has over 38 years experience in Patrick is a managing director at For personal use only David is an experienced finance operations and project development, na

Slide 4: Corporate Snapshot
Corporate Snapshot Capital Structure Share price (at 21 November 2024) $0.025 For personal use only Shares on issue 181,945,260 Juno Share Price History 0.14 Market capitalisation $4.55m Cash $1.4m¹ 0.12 Debt Nil 0.10 Options 4.4m 0.08 Top Shareholders (as at 21 November 2024) 0.06 Ntsimbintle Holdi

Slide 5: Central Yilgarn Projects
Central Yilgarn Projects For personal use only • Juno Minerals projects are located in the Central Yilgarn ~ 110km NW of Menzies. • Juno Minerals has a significant land holding in the region for its projects, including significant water licence tenure north and south of the project area. • Access to

Slide 6: Central Yilgarn Projects
Central Yilgarn Projects For personal use only • Juno Minerals is progressing development of the Mount Mason DSO Hematite Project. • Juno Minerals commenced evaluation of lithium potential in 2022 on the Mount Ida mining tenement. A systematic program identified two significant lithium soil geochemi

Slide 7: Mount Mason DSO Hematite Project
For personal use only Mount Mason DSO Hematite Project 7

Slide 8: Mount Mason DSO Hematite Project
Mount Mason DSO Hematite Project For personal use only Key points: • Well advanced, proven DSO Mineral Resource. • All Statutory approvals received for project development. • Non-binding Indicative Track Pricing received from Arc Infrastructure (below rail operator). • Non-binding MOU executed with

Slide 9: Mount Mason Logistics
Mount Mason Logistics The Project is located approximately 110km NW of Menzies For personal use only • A new haul road (28.2km) will be built from site to the Menzies North-West road. • A Menzies bypass road (9.3km) to the Yunndaga rail siding site is approved. • The Yunndaga rail siding site is ful

Slide 10: Yunndaga Rail Siding
Yunndaga Rail Siding The Yunndaga Rail siding is an important piece of For personal use only infrastructure for both Mount Mason and Mount Ida • Located 5km south of Menzies, with full statutory approvals received for development. • Site is 2.6km long and 500m wide encompassing the rail track and th

Slide 11: Mount Ida Lithium Prospect
For personal use only Mount Ida Lithium Prospect 11

Slide 12: Lithium Prospect – Exploration Program
Lithium Prospect – Exploration Program The Phase 2 priority 1 drill program completed 3 286 metres of drilling over 34 holes on the For personal use only Northern and Southern anomalies. The Phase 2 priority 2 drill program balance was suspended due to no major levels of spodumene mineralization bei

Slide 13: The Northern & Southern anomalies
For personal use only The Northern & Southern anomalies are discrete zones within a shear zone identified from geological mapping and sampling

Slide 14: Mount Ida Lithium Prospect
* minerals © ‘ ery ‘ ANE i limited minerals T minerals T Ey Mount Ida Lithium Prospect > cofinaean Cc [e) oO n z =) g, Cc i fo) 3 Y Sn oO oO | » LL H | \ BP | es i i i Xx, i \eae® | x i = a fe 2509008 250508

Slide 15: Lithium Prospect – EIS Diamond Holes
Lithium Prospect – EIS Diamond Holes For personal use only 15

Slide 16: Mount Ida Magnetite Project
For personal use only Mount Ida Magnetite Project 16

Slide 17: Mount Ida Magnetite Project
Mount Ida Magnetite Project • Over $50m previously invested in the Project. • 100,000 metres of RC and Diamond drilling completed, For personal use only resource and geotechnical. • Feasibility Study 70% completed prior to ceasing work in 2013. • Next steps (after Mount Mason is in production): o Un

Slide 18: Mount Ida - Conceptual Site Plan
Mount Ida - Conceptual Site Plan Waste Rock For personal use only Dump Central Pit TMF Cell 1 and 2 Power station Crusher Process plant Village and Airstrip Mine access road Road to Menzies Concentrate pipeline route to Yunndaga rail siding Southern bore Mount Ida – Conceptual Site Plan 18 field 18

Slide 19: High Grade Magnetite
High Grade Magnetite Mount Ida can produce on average 67% Fe magnetite concentrate. Magnetite concentrate is becoming the preferred smelter feed stock due to: For personal use only • Consistent product specifications and quality • Produces a higher quality steel – less impurities • Requires less ene

Slide 20: Magnetite Project Activity
Magnetite Project Activity • Fortescue Metals Group Limited’s (FMG) Ironbridge 22mtpa magnetite project in the Pilbara, currently in commissioning and ramp-up phase. For personal use only • FMG one year review of Sinosteel’s Midwest magnetite project and Oakajee Infrastructure to acquire 50% and 100

Slide 21: Yilgarn Magnetite Projects
Yilgarn Magnetite Projects For personal use only Yilgarn Magnetite Projects 21

Slide 22: Yilgarn Magnetite Projects – Grades and Resources
Yilgarn Magnetite Projects – Grades and Resources 37% use only 35% Mindax - Mount Forrest 1,710 Legacy and Hawthorn - Mt Bevan 31.80% (Hancock JV) 1,290 33.94% 33% Cashmere Iron - Cashmere Downs Juno has the For personal 1,200 largest Grade (%Fe) 32% magnetite 31% resource in the Yilgarn region 29%

Slide 23: Australian Magnetite Projects
Australian Magnetite Projects Market Measured and/ % Total Company Project Capitalisation Cash ($m)2 or Indicated Ownership Resource (mt) ($m)1 Resources (mt) For personal use only Juno Minerals Limited Mount Ida 100.0 4.5 2.1 1846.0 3 1062.0 Macarthur Minerals Limited Lake Giles 100.0 10.6 0.1 1269

Slide 24: Appendices
For personal use only Appendices 24

Slide 25: Mineral Resources Estimates of the Mount Mason DSO Hematite Project
Mineral Resources Estimates of the Mount Mason DSO Hematite Project In accordance with JORC Code (2012) at January 2018: For personal use only Fe SiO2 Al2O3 P S CaO MgO LOI Classification Tonnes (%) (%) (%) (%) (%) (%) (%) (%) Measured 4,800,000 60.3 7.37 2.90 0.05 0.01 0.03 0.04 2.63 Indicated 1,08

Slide 26: Mineral Resources Estimates of the Mount Ida Magnetite Project
Mineral Resources Estimates of the Mount Ida Magnetite Project In accordance with JORC Code (2012) at January 2018: For personal use only Central Zone based on Unweathered BIF with a 10% Magnetic Fe block grade cut-off Tonnes Fe SiO2 Al2O3 CaO P S LOI MgO MnO Zone/Class Material x106 (%) (%) (%) (%)

Slide 27: Mineral Resources Estimates of the Mount Ida Magnetite Project
Mineral Resources Estimates of the Mount Ida Magnetite Project In accordance with JORC Code (2012) at January 2018: For personal use only South and North Zone based on Unweathered BIF with a 10% Magnetic Fe block grade cut-off Fe SiO2 Al2O3 CaO P S LOI MgO MnO Zone/Class Material Tonnes x106 (%) (%)

Slide 28: Mineral Resources Estimates of the Mount Ida Magnetite Project
Mineral Resources Estimates of the Mount Ida Magnetite Project In accordance with JORC Code (2012) at January 2018: For personal use only Combined Central, South & North Zones based on Unweathered BIF with a 10% Magnetic Fe block grade cut-off Fe SiO2 Al2O3 CaO P S LOI MgO MnO Zone/Class Material To
Source: ASX announcement, Nov 27, 2024
More decks from Juno Minerals Ltd.
Shareholder Meeting (November 2025)30 slides · Nov 26, 2025
Future Minerals Forum 202528 slides · Jan 15, 2025
Future Minerals Forum 202526 slides · Jan 14, 2025
Investor Presentation (November 2024)29 slides · Nov 28, 2024
Shareholder Meeting (November 2023)36 slides · Nov 20, 2023
Investor Presentation (September 2023)34 slides · Sep 22, 2023