  1. Slide 1: Investor Presentation (Re-release) ASX Announcement

    ASX / MEDIA ANNOUNCEMENT (ASX: JNO) 15 JANUARY 2025 INVESTOR PRESENTATION (RE-RELEASE) Juno Minerals Limited (ASX: JNO) (Juno or the Company) provides an updated version of its Investor Presentation originally released 14 January 2025. The re-released Investor Presentation includes supporting source

  2. Slide 2: Investor Presentation – Central Yilgarn Iron Projects

    Investor Presentation Central Yilgarn Iron Projects Mount Mason DSO Hematite Mount Ida Magnetite 14 - 16 January 2025 Future Minerals Forum 2025 – Riyadh, Saudi Arabia

  3. Slide 3: Disclaimer

    Disclaimer IMPORTANT: Please read the following before continuing. This Presentation has been prepared by Juno Minerals Limited ACN 645 778 892 (Juno or the Company) solely for information purposes. This Presentation has not been approved by any regulatory or supervisory authority. For purposes of t

  4. Slide 4: Board

    Board David Moroney Greg Durack Patrick Murphy Independent Chair Managing Director & CEO Non-Executive Director & Non-Executive Director Greg has over 38 years experience in Patrick is a managing director at David is an experienced finance operations and project development, natural resources group

  5. Slide 5: Corporate Snapshot

    Corporate Snapshot Capital Structure Share price (at 6 January 2025) $0.026 Shares on issue 209,237,049 Juno Share Price History Market capitalisation $5.4m 0.14 Cash $1.4m¹ 0.12 Debt Nil 0.10 Options 4.4m 0.08 0.06 Top Shareholders (as at 6 January 2025) Ntsimbintle Holdings (Pty) Ltd 15.22% 0.04 I

  6. Slide 6: Central Yilgarn Projects

    Central Yilgarn Projects • Juno Minerals projects are located in the Central Yilgarn ~ 110km NW of Menzies. • Juno Minerals has a significant land holding in the region for its projects, including significant water licence tenure north and south of the project area. • Access to rail through its Yunn

  7. Slide 7: Central Yilgarn Projects

    Central Yilgarn Projects • Juno Minerals is progressing development of the Mount Mason DSO Hematite Project. • The Mount Ida Magnetite Project is the largest and one of the most technically advanced magnetite projects in the Yilgarn. Central Yilgarn Project 6

  8. Slide 8: Mount Mason DSO Hematite Project

    Mount Mason DSO Hematite Project 7

  9. Slide 9: Mount Mason DSO Hematite Project

    Mount Mason DSO Hematite Project Key points: • Well advanced, proven DSO Mineral Resource. • All Statutory approvals received for project development. • Non-binding Indicative Track Pricing received from Arc Infrastructure (below rail operator). • Non-binding MOU executed with Southern Ports Authori

  10. Slide 10: Mount Mason Logistics

    Mount Mason Logistics The Project is located approximately 110km NW of Menzies • A new haul road (28.2km) will be built from site to the Menzies North-West road. • A Menzies bypass road (9.3km) to the Yunndaga rail siding site is approved. • The Yunndaga rail siding site is fully approved to allow d

  11. Slide 11: Yunndaga Rail Siding

    Yunndaga Rail Siding The Yunndaga Rail siding is an important piece of infrastructure for both Mount Mason and Mount Ida • Located 5km south of Menzies, with full statutory approvals received for development. • Site is 2.6km long and 500m wide encompassing the rail track and the Goldfields Highway.

  12. Slide 12: Mount Ida Magnetite Project

    Mount Ida Magnetite Project 11

  13. Slide 13: Mount Ida Magnetite Project

    Mount Ida Magnetite Project • Over $50m previously invested in the Project. • 100,000 metres of RC and Diamond drilling completed, resource and geotechnical. • 1.85 btonnes at 29.5% Fe • Feasibility Study 70% completed prior to ceasing work in 2013. • Next steps: o Undertake further PQ core drilling

  14. Slide 14: Mount Ida - Drilling

    Mount Ida Mount Ida - Drilling 13

  15. Slide 15: Mount Ida – Central Zone Long Section

    Mount Ida – Central Zone Long Section Mount Ida – Long Section 14

  16. Slide 16: Mount Ida – Central Zone Cross Section

    Mount Ida – Central Zone Cross Section Mount Ida – Cross Section 15

  17. Slide 17: Mount Ida - Conceptual Site Plan

    Mount Ida - Conceptual Site Plan Waste Rock Dump Central Pit TMF Cell 1 and 2 Power station Crusher Process plant Village and Airstrip Mine access road Road to Menzies Concentrate pipeline route to Yunndaga rail siding Southern bore Mount Ida – Conceptual Site Plan 16 field 16

  18. Slide 18: High Grade Magnetite

    High Grade Magnetite Mount Ida can produce on average 67% Fe magnetite concentrate. Magnetite concentrate is becoming the preferred smelter feed stock due to: • Consistent product specifications and quality • Produces a higher quality steel – less impurities • Requires less energy input – exothermic

  19. Slide 19: Magnetite Project Activity

    Magnetite Project Activity • Fortescue Metals Group Limited’s (FMG) Ironbridge 22mtpa magnetite project in the Pilbara, currently in commissioning and ramp-up phase. • FMG one year review of Sinosteel’s Midwest magnetite project and Oakajee Infrastructure to acquire 50% and 100% respectively (ASX an

  20. Slide 20: Yilgarn Magnetite Projects

    Yilgarn Magnetite Projects Yilgarn Magnetite Projects 19

  21. Slide 21: Yilgarn Magnetite Projects – Grades and Resources

    Yilgarn Magnetite Projects – Grades and Resources 37% 35% Mindax - Mount Forrest^ 1,710 Legacy - Mt Bevan (Hancock JV)^ 31.80% 1,290 33.94% 33% Cashmere Iron - Cashmere Downs1 Juno has the 1,200 largest Grade (%Fe) 32% magnetite 31% resource in the Yilgarn region 29% Macarthur Minerals - Lake Giles^

  22. Slide 22: Australian Magnetite Projects

    Australian Magnetite Projects Market Total Measured Indicated Inferred % Stage of Development Cash Company Project Capitalisation Resource Resources Resources Resources Ownership ($m)2 ($m)1 (mt) (mt) (mt) (mt) Feasibility Study on hold at 70% Juno Minerals Limited Mount Ida 100.0 5.6 1.4 1846.0 3 -

  23. Slide 23: Project Strengths

    Project Strengths Key points: • Large proven mineral resource, no further drilling required (other than additional PQ core for metallurgical/pilot plant testing) • Significant metallurgical test work completed – Promet convention • Granted Mining Lease • Significant tenure holdings for infrastructur

  24. Slide 24: Appendices

    juno minerals imitec Appendices

  25. Slide 25: Mineral Resources Estimates of the Mount Mason DSO Hematite Project

    Mineral Resources Estimates of the Mount Mason DSO Hematite Project In accordance with JORC Code (2012) at January 2018: Fe SiO2 Al2O3 P S CaO MgO LOI Classification Tonnes (%) (%) (%) (%) (%) (%) (%) (%) Measured 4,800,000 60.3 7.37 2.90 0.05 0.01 0.03 0.04 2.63 Indicated 1,080,000 59.4 10.41 3.47

  26. Slide 26: Mineral Resources Estimates of the Mount Ida Magnetite Project

    Mineral Resources Estimates of the Mount Ida Magnetite Project In accordance with JORC Code (2012) at January 2018: Central Zone based on Unweathered BIF with a 10% Magnetic Fe block grade cut-off Tonnes Fe SiO2 Al2O3 CaO P S LOI MgO MnO Zone/Class Material x106 (%) (%) (%) (%) (%) (%) (%) (%) (%) I

  27. Slide 27: Mineral Resources Estimates of the Mount Ida Magnetite Project

    Mineral Resources Estimates of the Mount Ida Magnetite Project In accordance with JORC Code (2012) at January 2018: South and North Zone based on Unweathered BIF with a 10% Magnetic Fe block grade cut-off Fe SiO2 Al2O3 CaO P S LOI MgO MnO Zone/Class Material Tonnes x106 (%) (%) (%) (%) (%) (%) (%) (

  28. Slide 28: Mineral Resources Estimates of the Mount Ida Magnetite Project

    Mineral Resources Estimates of the Mount Ida Magnetite Project In accordance with JORC Code (2012) at January 2018: Combined Central, South & North Zones based on Unweathered BIF with a 10% Magnetic Fe block grade cut-off Fe SiO2 Al2O3 CaO P S LOI MgO MnO Zone/Class Material Tonnes x106 (%) (%) (%)